| 1 | Clearing and grubbing (201E11000) | LS | 1 | $25,000 | $7,000.00 |
| 2 | Pavement removed (202E23000) | SY | 443 | $32.50 | $50.00 |
| 3 | Guardrail removed (202E38000) | FT | 385 | $10.00 | $4.00 |
| 4 | Removal misc.: stone wingwall block (202E98100) | EACH | 3 | $500.00 | $950.00 |
| 5 | Excavation (203E10000) | CY | 103 | $90.00 | $54.00 |
| 6 | Embankment (203E20000) | CY | 19 | $290.00 | $42.00 |
| 7 | Subgrade compaction (204E10000) | SY | 298 | $7.50 | $9.00 |
| 8 | Proof rolling (204E45000) | HR | 4 | $50.00 | $375.00 |
| 9 | Guardrail, type MGS (606E15050) | FT | 113 | $50.00 | $30.00 |
| 10 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 1 | $3,250.00 | $3,000.00 |
| 11 | Anchor assembly, MGS type T (606E26550) | EACH | 3 | $3,000.00 | $1,550.00 |
| 12 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 4 | $3,500.00 | $2,850.00 |
| 13 | Soil analysis test (659E00100) | EACH | 2 | $50.00 | $150.00 |
| 14 | Topsoil (659E00300) | CY | 107 | $100.00 | $75.00 |
| 15 | Seeding and mulching, class 1 (659E00500) | SY | 961 | $5.00 | $2.50 |
| 16 | Repair seeding and mulching (659E14000) | SY | 49 | $0.25 | $1.00 |
| 17 | Inter-seeding (659E15000) | SY | 49 | $0.25 | $1.00 |
| 18 | Commercial fertilizer (659E20000) | TON | 0.13 | $500.00 | $400.00 |
| 19 | Lime (659E31000) | ACRE | 0.20 | $500.00 | $30.00 |
| 20 | Water (659E35000) | MGAL | 7 | $1.00 | $2.00 |
| 21 | Erosion control (832E30000) | EACH | 30,000 | $1.00 | $1.00 |
| 22 | Reshaping under guardrail, as per plan (209E15001) | STA | 3 | $15.00 | $1,200.00 |
| 23 | Full depth pavement sawing (255E20000) | FT | 89 | $5.00 | $4.00 |
| 24 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 64 | $525.75 | $530.00 |
| 25 | Asphalt concrete base, PG64-22, (449), (driveways) (301E56100) | CY | 10 | $510.00 | $530.00 |
| 26 | Aggregate base (304E20000) | CY | 40 | $300.00 | $140.00 |
| 27 | Non-tracking tack coat (407E20000) | GAL | 31 | $4.00 | $5.00 |
| 28 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 8 | $1,100.00 | $890.00 |
| 29 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 11 | $881.00 | $825.00 |
| 30 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 2 | $750.00 | $780.00 |
| 31 | Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801) | CY | 17 | $660.00 | $760.00 |
| 32 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 1 | $500.00 | $1,650.00 |
| 33 | Ground mounted support, no. 3 post (630E03100) | FT | 13 | $62.37 | $11.00 |
| 34 | Sign, flat sheet (630E80100) | SF | 5 | $75.00 | $26.00 |
| 35 | Removal of ground mounted sign and disposal (630E84900) | EACH | 4 | $100.00 | $47.00 |
| 36 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $100.00 | $90.00 |
| 37 | Removal of ground mounted post support and disposal (630E86002) | EACH | 3 | $100.00 | $60.00 |
| 38 | Removal of ground mounted post support and reerection (630E86010) | EACH | 3 | $100.00 | $90.00 |
| 39 | Removal of pole mounted sign and disposal (630E87500) | EACH | 1 | $100.00 | $40.00 |
| 40 | Edge line, 4" (646E10000) | MI | 0.70 | $4,405.00 | $4,750.00 |
| 41 | Center line (646E10200) | MI | 0.15 | $7,360.00 | $18,250 |
| 42 | Stop line (646E10400) | FT | 23 | $14.50 | $30.00 |
| 43 | Lane arrow (646E20300) | EACH | 4 | $250.00 | $290.00 |
| 44 | Bike lane symbol marking (646E20600) | EACH | 4 | $300.00 | $350.00 |
| 45 | Traffic compacted surface, type A or B (410E12000) | CY | 10 | $50.00 | $200.00 |
| 46 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 60 | $90.00 | $100.00 |
| 47 | Special - work zone traffic signal (614E11300) | EACH | 1 | $131,000 | $135,000 |
| 48 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 4 | $3,500.00 | $2,900.00 |
| 49 | Asphalt concrete for maintaining traffic (614E13000) | CY | 25 | $100.00 | $180.00 |
| 50 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 19 | $12.00 | $20.00 |
| 51 | Barrier reflector, type 5, bidirectional (614E13318) | EACH | 16 | $12.00 | $20.00 |
| 52 | Object marker, two way (614E13360) | EACH | 33 | $22.00 | $26.00 |
| 53 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $1,250.00 | $990.00 |
| 54 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.10 | $5,000.00 | $20,000 |
| 55 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 0.45 | $5,000.00 | $4,800.00 |
| 56 | Work zone dotted line, class III, 4", 642 paint (614E24610) | FT | 456 | $1.25 | $2.50 |
| 57 | Work zone stop line, class III, 642 paint (614E26610) | FT | 90 | $5.00 | $13.00 |
| 58 | Roads for maintaining traffic (615E10000) | LS | 1 | $2,000.00 | $9,500.00 |
| 59 | Pavement for maintaining traffic, class B (615E25000) | SY | 40 | $275.00 | $190.00 |
| 60 | Water (616E10000) | MGAL | 10 | $1.00 | $5.00 |
| 61 | Portable barrier, unanchored (622E41100) | FT | 311 | $57.00 | $18.00 |
| 62 | Portable barrier, anchored (622E41110) | FT | 250 | $80.00 | $30.00 |
| 63 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $175,000 | $200,000 |
| 64 | Wearing course removed (202E23500) | SY | 170 | $75.00 | $30.00 |
| 65 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $80,000 | $160,000 |
| 66 | Unclassified excavation (503E21300) | LS | 1 | $44,500 | $110,000 |
| 67 | Epoxy coated reinforcing steel, as per plan (509E10001) | LB | 42,042 | $1.50 | $1.65 |
| 68 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 381 | $35.00 | $28.00 |
| 69 | Class QC2 concrete, superstructure (511E33412) | CY | 110 | $3,000.00 | $2,570.00 |
| 70 | Class QC1 concrete, pier above footings (511E40510) | CY | 59 | $1,500.00 | $1,100.00 |
| 71 | Class QC1 concrete, abutment not including footing (511E44110) | CY | 60 | $1,600.00 | $1,200.00 |
| 72 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 362 | $50.00 | $30.00 |
| 73 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 30 | $25.00 | $30.00 |
| 74 | Type 2 waterproofing (512E33000) | SY | 30 | $40.00 | $55.00 |
| 75 | 2" preformed expansion joint filler (516E13900) | SF | 10 | $20.00 | $10.00 |
| 76 | Integral abutment expansion joint seal (516E14014) | FT | 106 | $35.00 | $60.00 |
| 77 | Elastomeric bearing with internal laminates only (neoprene), as per plan (516E43101) | EACH | 28 | $300.00 | $160.00 |
| 78 | Railing (concrete parapet with twin steel tube railing), as per plan (517E75121) | FT | 107 | $500.00 | $500.00 |
| 79 | Porous backfill with geotextile fabric (518E21200) | CY | 52 | $200.00 | $175.00 |
| 80 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 30 | $30.00 | $15.00 |
| 81 | Reinforced concrete approach slabs (T=13"), as per plan (526E15001) | SY | 168 | $500.00 | $500.00 |
| 82 | Type A installation, as per plan (526E90011) | FT | 76 | $320.00 | $275.00 |
| 83 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $50,000 | $18,000 |
| 84 | CPM progress schedule (108E10000) | LS | 1 | $10,000 | $5,000.00 |
| 85 | Maintaining traffic (614E11000) | LS | 1 | $31,000 | $50,000 |
| 86 | Field office, type B (619E16010) | MNTH | 15 | $2,000.00 | $1,900.00 |
| 87 | Construction layout stakes and surveying (623E10000) | LS | 1 | $15,000 | $17,000 |
| 88 | Mobilization (624E10000) | LS | 1 | $47,000 | $89,000 |
| 89 | Special - preconstruction video documentation (690E98400) | LS | 1 | $2,000.00 | $550.00 |