Atsalis Brothers Painting Co: ODOT bid record
Atsalis Brothers Painting Co submitted 15 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 11 MAY 2023, and was the low bidder on 1 of them (7%). When it was not low, its total sat a median +59% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $2,157,995
- Latest bid
- 11 MAY 2023
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2022 | 8 | 1 | 13% |
| 2023 | 2 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 4 | 1 | 25% |
| District 7 | 3 | 0 | 0% |
| MOT | 1 | 0 | 0% |
| GEA | 1 | 0 | 0% |
| District 9 | 1 | 0 | 0% |
| LAK | 1 | 0 | 0% |
| BEL | 1 | 0 | 0% |
| FRA | 1 | 0 | 0% |
| HEN | 1 | 0 | 0% |
| District 6 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field painting of existing structural steel, prime coat | 514E00056 | SF | 75 | 47 (63%) | $1.00 | $2.65 |
| Field painting structural steel, finish coat | 514E00066 | SF | 51 | 38 (75%) | $1.00 | $2.52 |
| Field painting structural steel, intermediate coat | 514E00060 | SF | 75 | 36 (48%) | $2.00 | $3.00 |
| Field painting structural steel, finish coat | 514E00066 | SF | 24 | 24 (100%) | $1.00 | $2.00 |
| Field painting structural steel, finish coat | 514E00066 | SF | 24 | 24 (100%) | $1.00 | $2.00 |
| Erosion control | 832E30000 | EACH | 13 | 13 (100%) | $1.00 | $1.00 |
| Patching concrete structure, as per plan | 519E11101 | SF | 6 | 4 (67%) | $450.00 | $150.00 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 10 | 2 (20%) | $1,050.00 | $950.00 |
| Object marker, one way | 614E13350 | EACH | 9 | 2 (22%) | $16.00 | $17.00 |
| Grinding fins, tears, slivers on existing structural steel | 514E00504 | MNHR | 77 | 1 (1%) | $106.00 | $110.00 |
| Portable barrier, unanchored | 622E41100 | FT | 6 | 1 (17%) | $32.75 | $24.34 |
| Structural steel members, level UF, as per plan | 513E10201 | LB | 5 | 1 (20%) | $12.00 | $15.75 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Elite Contractors Inc | 14 | 11 of 14 |
| 360 Construction Company Inc | 11 | 7 of 11 |
| Panther Industrial Painting LLC | 11 | 9 of 11 |
| Legend Painting Inc | 10 | 7 of 10 |
| Apbn Inc | 8 | 4 of 8 |
| KMX Painting Inc | 8 | 6 of 8 |
| Corrosion Resistance LTD | 5 | 2 of 5 |
| Abhe & Svoboda Inc | 5 | 0 of 5 |
| Industrial Painting & Rigging Inc | 5 | 4 of 5 |
| Ucl Inc | 4 | 2 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 MAY 2023 | 230288 | District 6 | D06-BP-FY23 (BRIDGE PAINTING) | 6 of 6 | $6,409,650 | +104% |
| 12 JAN 2023 | 230011 | District 7 | D07-BP-FY23 (BRIDGE PAINTING) | 7 of 8 | $2,086,985 | +70% |
| 17 NOV 2022 | 220607 | HEN | HEN-US 6-11.80 Bridge Paint (BRIDGE PAINTING) | 4 of 6 | $524,953 | +22% |
| 30 JUN 2022 | 220412 | FRA | FRA-IR 670-03.12 Bridge Retrofit (BRIDGE REPAIR) | 3 of 3 | $468,370 | +61% |
| 17 MAR 2022 | 220172 | CUY | CUY-IR 271-13.90/VAR Paint (BRIDGE PAINTING) | 1 of 7 | $2,157,995 | Low, 4.0% under the second |
| 10 MAR 2022 | 220132 | CUY | CUY-US 422-13.90/VAR Paint (BRIDGE PAINTING) | 7 of 7 | $2,772,677 | +56% |
| 17 FEB 2022 | 220079 | BEL | BEL-IR 470-01.26 (BRIDGE PAINTING) | 5 of 7 | $894,906 | +24% |
| 27 JAN 2022 | 220073 | LAK | LAK-SR 2-14.76/VAR Paint (BRIDGE PAINTING) | 5 of 9 | $3,694,153 | +14% |
| 13 JAN 2022 | 220010 | GEA | GEA-US 422-01.70/VAR Paint (BRIDGE PAINTING) | 5 of 10 | $2,892,772 | +34% |
| 13 JAN 2022 | 220032 | District 9 | D09-BH-FY2022 (B) (BRIDGE PAINTING) | 8 of 8 | $1,985,648 | +127% |
| 25 FEB 2021 | 210150 | MOT | MOT-BH/BP-FY21 (BRIDGE PAINTING) | 3 of 10 | $3,826,905 | +20% |
| 26 MAR 2020 | 200163 | CUY | CUY-IR 90-09.70 L&R Paint (BRIDGE PAINTING) | 6 of 10 | $4,623,800 | +66% |
| 26 MAR 2020 | 200166 | District 7 | D07-BP-FY20 (A) (BRIDGE PAINTING) | 5 of 7 | $1,648,669 | +81% |
| 26 MAR 2020 | 200167 | District 7 | D07-BP-FY20 (B) (BRIDGE PAINTING) | 5 of 7 | $2,633,796 | +65% |
| 13 FEB 2020 | 200082 | CUY | CUY-IR 480-06.47/VAR Paint (BRIDGE PAINTING) | 7 of 11 | $26,854,158 | +42% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.