ODOT contract 260329 bid tabulation

D08-PM Bridge FY27 (BRIDGE REPAIR). Let by Ohio DOT on July 16, 2026, District 8. 7 bids received; low bid $1,950,457 by BCC Ohio Inc, -21% against the engineer's estimate of $2,470,000.

Owner
Ohio DOT
Letting
16 JUL 2026
Pay items
94
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1BCC Ohio Inc$1,950,457Low-21%
2Ram Construction Services of Michigan, Inc$2,248,159+15%-9.0%
3Tempo Construction LLC$2,388,853+22%-3.0%
4Prus Construction Company$2,687,291+38%+9.0%
5Freyssinet, Inc$2,890,181+48%+17%
6Structural Technologies LLC$3,934,007+102%+59%
7Vasta Construction Company Inc$5,385,941+176%+118%
ODOT contract 260329: bids by rank

Engineer's estimate: $2,470,000.

Bid tabulation

LinePay itemUnitQuantity1. BCC Ohio Inc2. Ram Construction Services of Michigan, Inc3. Tempo Construction LLC4. Prus Construction Company5. Freyssinet, Inc6. Structural Technologies LLC
1Clearing and grubbing, as per plan (201E11001)LS1$7,308.00$31,000$25,000$6,500.00$14,800$10,202
2Commercial fertilizer (654E11000)TON0.16$945.00$10,923$1,230.00$2,000.00$3,610.00$16,564
3Topsoil (659E00300)CY134$88.32$172.80$220.00$95.00$165.00$82.82
4Seeding and mulching (659E10000)SY1,210$2.52$4.44$3.30$7.65$12.00$9.94
5Lime (659E31000)ACRE0.25$0.52$11,058$0.72$1,000.00$480.00$198,771
6Water (659E35000)MGAL6.50$0.21$1,500.00$0.30$35.00$2.50$1,735.24
7Law enforcement officer with patrol car for assistance (614E11110)HR1,000$93.45$60.00$210.00$132.00$205.00$182.21
8Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH4$2,545.50$7,500.00$3,120.00$2,500.00$5,470.00$7,906.79
9Barrier reflector, type 1 (one-way) (614E13310)EACH22$28.35$15.00$17.00$13.65$30.00$45.72
10Object marker, one way (614E13350)EACH22$22.70$38.50$28.00$22.00$48.00$133.34
11Portable changeable message sign, as per plan (614E18601)SNMT2$2,280.00$6,000.00$1,580.00$1,100.00$2,770.00$3,790.59
12Portable barrier, unanchored (622E41100)FT720$45.40$82.50$73.00$58.00$125.00$87.34
13Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY77$40.08$29.00$40.60$68.50$70.00$48.04
14Special - composite fiber wrap system (519E00100)SF310$36.96$28.10$27.50$25.50$27.00$31.86
15Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY170$40.08$29.00$40.60$68.50$70.00$48.04
16Special - composite fiber wrap system (519E00100)SF680$36.96$28.10$27.50$25.50$27.00$31.86
17Patching concrete structure, as per plan (519E11101)SF170$140.52$206.00$195.00$180.00$310.00$299.44
18Galvanic anode protection, as per plan (844E20001)EACH142$62.75$50.50$45.80$55.00$53.00$55.88
19Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY154$40.08$29.00$40.60$68.50$70.00$48.04
20Special - composite fiber wrap system (519E00100)SF536$36.96$28.10$27.50$25.50$27.00$31.86
21Patching concrete structure, as per plan (519E11101)SF116$140.55$206.00$195.00$257.50$310.00$299.44
22Galvanic anode protection, as per plan (844E20001)EACH113$62.75$50.50$45.80$55.00$53.00$55.88
23Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001)LB50$6.94$48.00$6.80$15.75$5.50$68.56
24Uncoated steel reinforcement (509E25000)LB756$4.75$10.50$6.80$3.50$5.50$22.69
25Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001)EACH192$31.05$66.63$95.00$25.00$68.00$112.77
26Class QC1 concrete, pier (511E43210)CY12$1,960.50$2,234.00$5,650.00$3,990.00$1,840.00$4,569.43
27Concrete, misc.: removal of loose concrete (511E71200)SF100$38.70$223.70$56.00$65.75$150.00$15.60
28Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY245$42.66$29.00$40.60$68.50$70.00$48.04
29Concrete repair by epoxy injection, as per plan (512E10601)FT48$98.11$68.00$95.00$255.00$120.00$85.58
30Special - composite fiber wrap system (519E00100)SF1,565$36.96$28.10$27.50$25.50$27.00$31.86
31Patching concrete structure, as per plan (519E11101)SF901$140.55$206.00$195.00$140.00$310.00$299.44
32Galvanic anode protection, as per plan (844E20001)EACH654$62.75$50.50$45.80$55.00$53.00$55.88
33Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY410$40.08$29.00$40.60$68.50$70.00$48.04
34Special - composite fiber wrap system (519E00100)SF1,102$36.96$28.10$27.50$25.50$27.00$31.86
35Patching concrete structure, as per plan (519E11101)SF201$140.55$206.00$195.00$220.00$310.00$299.44
36Galvanic anode protection, as per plan (844E20001)EACH203$62.75$50.50$45.80$55.00$53.00$55.88
37Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY199$40.08$29.00$40.60$68.50$70.00$48.04
38Special - composite fiber wrap system (519E00100)SF1,102$36.96$28.10$27.50$25.50$27.00$31.86
39Patching concrete structure, as per plan (519E11101)SF498$140.55$206.00$195.00$165.50$310.00$299.44
40Galvanic anode protection, as per plan (844E20001)EACH488$62.75$50.50$45.80$55.00$53.00$55.88
41Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY199$40.08$29.00$40.60$68.50$70.00$48.04
42Special - composite fiber wrap system (519E00100)SF1,102$36.96$28.10$27.50$25.50$27.00$31.86
43Patching concrete structure, as per plan (519E11101)SF190$140.55$206.00$195.00$212.35$310.00$299.44
44Galvanic anode protection, as per plan (844E20001)EACH215$62.75$50.50$45.80$55.00$53.00$55.88
45Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY215$40.08$29.00$40.60$68.50$70.00$48.04
46Special - composite fiber wrap system (519E00100)SF1,102$36.96$28.10$27.50$25.50$27.00$31.86
47Patching concrete structure, as per plan (519E11101)SF99$140.55$206.00$195.00$278.00$310.00$299.44
48Galvanic anode protection, as per plan (844E20001)EACH125$62.75$50.50$45.80$55.00$53.00$55.88
49Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY314$40.08$29.00$40.60$68.50$70.00$48.04
50Special - composite fiber wrap system (519E00100)SF1,448$36.96$28.10$27.50$25.50$27.00$31.86
51Patching concrete structure, as per plan (519E11101)SF558$140.55$206.00$195.00$166.50$310.00$299.44
52Galvanic anode protection, as per plan (844E20001)EACH503$62.75$50.50$45.80$55.00$53.00$55.88
53Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY228$40.08$29.00$40.60$68.50$70.00$48.04
54Special - composite fiber wrap system (519E00100)SF848$36.96$28.10$27.50$25.50$27.00$31.86
55Patching concrete structure, as per plan (519E11101)SF95$140.55$206.00$195.00$261.50$310.00$299.44
56Galvanic anode protection, as per plan (844E20001)EACH87$62.75$50.50$45.80$55.00$53.00$55.88
57Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY655$42.65$29.00$40.60$68.50$70.00$48.04
58Special - composite fiber wrap system (519E00100)SF2,473$36.96$28.10$27.50$25.50$27.00$31.86
59Patching concrete structure, as per plan (519E11101)SF233$140.55$206.00$195.00$217.00$310.00$299.44
60Galvanic anode protection, as per plan (844E20001)EACH239$62.75$50.50$45.80$55.00$53.00$55.88
61Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY77$40.08$29.00$40.60$68.50$70.00$48.04
62Special - composite fiber wrap system (519E00100)SF690$36.96$28.10$27.50$35.00$27.00$31.86
63Patching concrete structure, as per plan (519E11101)SF46$140.55$206.00$195.00$321.00$310.00$299.44
64Galvanic anode protection, as per plan (844E20001)EACH43$62.75$50.50$45.80$55.00$53.00$55.88
65Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY277$40.08$29.00$40.60$68.50$70.00$48.04
66Special - composite fiber wrap system (519E00100)SF1,808$36.96$28.10$27.50$25.50$27.00$31.86
67Patching concrete structure, as per plan (519E11101)SF158$140.55$206.00$195.00$312.00$310.00$299.44
68Galvanic anode protection, as per plan (844E20001)EACH150$62.75$50.50$45.80$55.00$53.00$55.88
69Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY187$40.08$29.00$40.60$68.50$70.00$48.04
70Special - composite fiber wrap system (519E00100)SF1,102$36.96$28.10$27.50$25.50$27.00$31.86
71Patching concrete structure, as per plan (519E11101)SF121$140.55$206.00$195.00$248.00$310.00$299.44
72Galvanic anode protection, as per plan (844E20001)EACH92$62.75$50.50$45.80$55.00$53.00$55.88
73Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101)SY236$40.08$29.00$40.60$68.50$70.00$48.04
74Special - composite fiber wrap system (519E00100)SF310$36.96$28.10$27.50$25.50$27.00$31.86
75Patching concrete structure, as per plan (519E11101)SF4$312.90$206.00$390.00$1,200.00$310.00$299.44
76Premium for contract performance bond and for payment bond (103E05000)LS1$24,082$20,500$25,000$10,750$20,000$29,654
77Maintaining traffic (614E11000)LS1$101,033$122,830$205,000$650,000$181,000$799,541
78Mobilization (624E10000)LS1$132,720$304,500$180,000$100,000$140,000$567,231
100Erosion control (832E30000)EACH5,000$1.00$1.00$1.00$1.00$1.00$1.00
101Removal of existing coatings from concrete surfaces (512E74000)SY95$28.94$28.00$52.70$66.00$67.00$46.38
102Removal of existing coatings from concrete surfaces (512E74000)SY95$28.94$28.00$52.70$66.00$67.00$46.38
104Removal of existing coatings from concrete surfaces (512E74000)SY42$28.84$28.00$52.70$66.00$67.00$46.38
105Special - composite fiber wrap system (519E00100)SF645$36.96$39.50$98.00$77.00$160.00$155.80
106Removal of existing coatings from concrete surfaces (512E74000)SY78$28.94$28.00$52.70$66.00$67.00$46.38
107Removal of existing coatings from concrete surfaces (512E74000)SY78$28.94$28.00$52.70$66.00$67.00$46.38
108Removal of existing coatings from concrete surfaces (512E74000)SY78$28.94$28.00$52.70$66.00$67.00$46.38
109Removal of existing coatings from concrete surfaces (512E74000)SY94$28.94$28.00$52.70$66.00$67.00$46.38
110Removal of existing coatings from concrete surfaces (512E74000)SY154$28.34$28.00$52.70$66.00$67.00$46.38
111Removal of existing coatings from concrete surfaces (512E74000)SY133$28.94$28.00$52.70$66.00$67.00$46.38
112Removal of existing coatings from concrete surfaces (512E74000)SY380$28.94$28.00$52.70$66.00$67.00$46.38
113Removal of existing coatings from concrete surfaces (512E74000)SY76$28.94$28.00$52.70$66.00$67.00$46.38
114Removal of existing coatings from concrete surfaces (512E74000)SY65$28.94$28.00$52.70$66.00$67.00$46.38
115Removal of existing coatings from concrete surfaces (512E74000)SY64$28.94$28.00$52.70$66.00$67.00$46.38
116Portions of structure removed (202E11200)LS1$1,032.00$5,000.00$1,130.00$1,500.00$3,850.00$1,547.70
ODOT contract 260329: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of July 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy