ODOT contract 260396 bid tabulation

OTT-SR 269-01.54 Bridge Repair (BRIDGE REPAIR). Let by Ohio DOT on August 27, 2026, OTT. 3 bids received; low bid $168,650 by Ruhlin Company, -35% against the engineer's estimate of $260,000.

Owner
Ohio DOT
Letting
27 AUG 2026
Pay items
20
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ruhlin Company$168,650Low-35%
2Suburban Maintenance & Construction Inc$188,716+12%-27%
3Evers Steel Construction LLC$413,564+145%+59%
ODOT contract 260396: bids by rank

Engineer's estimate: $260,000.

Bid tabulation

LinePay itemUnitQuantity1. Ruhlin Company2. Suburban Maintenance & Construction Inc3. Evers Steel Construction LLC
1Erosion control (832E30000)EACH1,000$1.00$1.00$1.00
2Law enforcement officer with patrol car for assistance (614E11110)HR80$100.00$95.00$105.00
3Detour signing (614E12420)LS1$9,250.00$8,500.00$13,000
4Replacement sign (614E12500)EACH2$250.00$250.00$200.00
5Replacement drum (614E12600)EACH3$50.00$50.00$100.00
6Portable changeable message sign, as per plan (614E18601)SNMT5$1,200.00$1,200.00$2,000.00
7Portions of structure removed, as per plan (main M (202E11501)EACH1$5,500.00$15,500$3,700.00
8Portions of structure removed, as per plan (second (202E11501)EACH1$2,500.00$2,200.00$550.00
9Structural steel members, level UF (513E10200)LB409$24.00$49.00$24.40
10Structural steel, misc.:repair of damaged main mem (513E95000)FT9$2,600.00$1,200.00$2,850.00
11Structural steel, misc.: repair of damaged members (513E95030)EACH4$1,800.00$250.00$155.00
12Field painting of damaged structural steel, as per plan (514E20001)SF277$45.00$25.00$202.00
13Jacking and temporary support of superstructure, as per plan (516E47001)LS1$15,500$30,500$12,250
14Damage assessment (849E10000)LS1$2,456.00$7,500.00$3,910.00
15Surface preparation (849E10500)LS1$6,200.00$6,500.00$2,100.00
16Repairing damaged members by grinding (849E10600)HR4$356.00$125.00$210.00
17Straightening damaged members (849E10700)LS1$36,500$35,000$79,510
18Premium for contract performance bond and for payment bond (103E05000)LS1$1,788.57$5,000.00$10,600
19Maintaining traffic (614E11000)LS1$11,500$19,500$109,500
20Mobilization (624E10000)LS1$7,500.00$4,000.00$65,300
ODOT contract 260396: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of August 27, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy