ODOT contract 250038 bid tabulation
RIC-SR 314-02.75 (CULVERT REPLACEMENT). Let by Ohio DOT on January 16, 2025, RIC. 8 bids received; low bid $329,618 by Crawford Construction Company Inc, -30% against the engineer's estimate of $472,000.
- Owner
- Ohio DOT
- Letting
- 16 JAN 2025
- Pay items
- 66
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Crawford Construction Company Inc | $329,618 | Low | -30% |
| 2 | BCC Ohio Inc | $358,737 | +9.0% | -24% |
| 3 | Layton Services | $378,501 | +15% | -20% |
| 4 | Adena Corporation | $385,691 | +17% | -18% |
| 5 | Eclipse Co LLC | $406,610 | +23% | -14% |
| 6 | Advanced Excavating & Demolition LLC | $430,209 | +31% | -9.0% |
| 7 | V3 Construction Group LTD | $491,650 | +49% | +4.0% |
| 8 | Stanley Miller Construction Company | $526,234 | +60% | +11% |
Engineer's estimate: $472,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Crawford Construction Company Inc | 2. BCC Ohio Inc | 3. Layton Services | 4. Adena Corporation | 5. Eclipse Co LLC | 6. Advanced Excavating & Demolition LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,100.00 | $6,552.00 | $2,500.00 | $14,113 | $18,000 | $10,000 |
| 2 | Pavement removed (202E23000) | SY | 233 | $12.00 | $8.47 | $16.00 | $14.53 | $12.00 | $20.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 148 | $5.00 | $5.85 | $13.00 | $2.21 | $25.00 | $33.00 |
| 4 | Pipe removed, over 24" diameter (202E35200) | FT | 52 | $45.00 | $112.50 | $27.00 | $6.29 | $36.00 | $95.00 |
| 5 | Guardrail removed (202E38000) | FT | 181.25 | $7.00 | $7.56 | $16.00 | $6.60 | $8.00 | $7.20 |
| 6 | Anchor assembly removed, type E (202E42010) | EACH | 3 | $172.00 | $278.25 | $700.00 | $199.51 | $265.00 | $265.00 |
| 7 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $172.00 | $126.00 | $700.00 | $199.51 | $126.00 | $120.00 |
| 8 | Fence removed (202E75000) | FT | 252 | $11.00 | $3.94 | $8.00 | $7.34 | $4.00 | $3.75 |
| 9 | Gate removed (202E75250) | EACH | 1 | $217.00 | $399.00 | $500.00 | $99.75 | $395.00 | $380.00 |
| 10 | Removal misc.: boulder (202E98100) | EACH | 3 | $172.00 | $117.00 | $250.00 | $33.25 | $77.00 | $200.00 |
| 11 | Removal misc.: wood post (202E98100) | EACH | 2 | $100.00 | $117.00 | $250.00 | $99.75 | $115.00 | $35.00 |
| 12 | Excavation (203E10000) | CY | 176 | $32.00 | $11.70 | $26.00 | $10.20 | $32.00 | $50.00 |
| 13 | Embankment (203E20000) | CY | 265 | $26.00 | $23.47 | $15.00 | $9.78 | $30.00 | $25.00 |
| 14 | Subgrade compaction (204E10000) | SY | 242 | $2.00 | $2.34 | $3.00 | $3.29 | $1.00 | $3.50 |
| 15 | Fence, misc.: temporary fencing (607E98200) | LS | 1 | $1,000.00 | $1,872.00 | $2,400.00 | $1,309.65 | $9,900.00 | $8,650.00 |
| 16 | Monument assembly, type C (623E38500) | EACH | 2 | $1,733.00 | $1,815.75 | $1,700.00 | $2,013.08 | $2,035.00 | $1,800.00 |
| 17 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $800.00 | $3,480.00 | $1,750.00 | $959.22 | $3,659.00 | $3,500.00 |
| 18 | Post construction survey monument verification and report (623E51000) | LS | 1 | $800.00 | $3,480.00 | $1,750.00 | $959.22 | $3,659.00 | $3,000.00 |
| 19 | Riprap, type D (601E11000) | SY | 15 | $242.00 | $2,580.75 | $250.00 | $278.98 | $247.00 | $370.00 |
| 20 | Rock channel protection, type A with filter (601E32000) | CY | 73 | $110.00 | $147.64 | $220.00 | $137.28 | $276.00 | $105.00 |
| 21 | Soil analysis test (659E00100) | EACH | 2 | $50.00 | $274.50 | $180.00 | $100.00 | $105.00 | $250.00 |
| 22 | Topsoil (659E00300) | CY | 96 | $43.00 | $71.40 | $55.00 | $46.57 | $69.00 | $80.00 |
| 23 | Seeding and mulching (659E10000) | SY | 859 | $3.50 | $4.15 | $5.00 | $3.53 | $4.00 | $3.95 |
| 24 | Repair seeding and mulching (659E14000) | SY | 43 | $1.00 | $0.89 | $5.00 | $1.00 | $1.00 | $0.85 |
| 25 | Inter-seeding (659E15000) | SY | 43 | $1.00 | $0.11 | $5.00 | $1.00 | $0.11 | $0.10 |
| 26 | Commercial fertilizer (659E20000) | TON | 0.12 | $400.00 | $577.50 | $1,500.00 | $1,065.83 | $579.00 | $550.00 |
| 27 | Lime (659E31000) | ACRE | 0.18 | $120.00 | $52.50 | $200.00 | $355.28 | $53.00 | $50.00 |
| 28 | Water (659E35000) | MGAL | 5 | $4.50 | $10.50 | $1.00 | $1.00 | $1.00 | $1.00 |
| 29 | Slope erosion protection mat, type C (670E00530) | SY | 38 | $83.00 | $6.25 | $10.00 | $7.94 | $6.00 | $5.95 |
| 30 | Erosion control (832E30000) | EACH | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 31 | Concrete masonry (602E20000) | CY | 2.81 | $1,940.00 | $1,560.85 | $1,700.00 | $2,501.48 | $1,189.00 | $640.00 |
| 32 | Aggregate drains (605E31100) | FT | 75 | $13.00 | $19.08 | $20.00 | $16.60 | $21.00 | $40.00 |
| 33 | 18" conduit, type C (611E07600) | FT | 8 | $123.00 | $209.36 | $190.00 | $86.96 | $121.00 | $156.00 |
| 34 | 24" conduit, type C (611E10600) | FT | 132 | $46.00 | $140.44 | $110.00 | $99.56 | $126.00 | $110.00 |
| 35 | 63" X 98" conduit, type A, 706.04 (611E53500) | FT | 82 | $1,236.00 | $976.23 | $1,037.00 | $1,145.42 | $843.00 | $1,150.00 |
| 36 | Catch basin, no. 2-3 (611E98510) | EACH | 1 | $2,700.00 | $10,487 | $2,700.00 | $3,023.46 | $4,005.00 | $3,500.00 |
| 37 | Pavement planing, asphalt concrete (3.0") (254E01000) | SY | 192 | $16.00 | $18.90 | $22.00 | $41.96 | $20.00 | $18.00 |
| 38 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 38 | $305.00 | $378.00 | $433.00 | $607.64 | $540.00 | $360.00 |
| 39 | Aggregate base (304E20000) | CY | 40 | $160.00 | $127.50 | $130.00 | $108.96 | $123.00 | $90.00 |
| 40 | Tack coat (407E10000) | GAL | 60 | $7.95 | $15.75 | $18.00 | $11.63 | $2.00 | $15.00 |
| 41 | Prime coat, as per plan (408E10001) | GAL | 72 | $10.60 | $19.95 | $23.00 | $17.47 | $5.00 | $19.00 |
| 42 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001) | CY | 36 | $464.00 | $467.25 | $535.00 | $1,163.00 | $550.00 | $445.00 |
| 43 | Compacted aggregate (617E10100) | CY | 12 | $113.00 | $127.50 | $145.00 | $225.31 | $184.00 | $90.00 |
| 44 | Compacted aggregate (617E10100) | CY | 10 | $135.00 | $127.50 | $130.00 | $216.40 | $184.00 | $90.00 |
| 45 | RPM (621E00100) | EACH | 3 | $1,060.00 | $987.00 | $1,500.00 | $447.63 | $1,560.00 | $585.00 |
| 46 | Raised pavement marker removed (621E54000) | EACH | 3 | $110.00 | $17.55 | $10.00 | $50.00 | $11.00 | $85.00 |
| 47 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $371.00 | $1,302.00 | $300.00 | $180.00 | $158.00 | $85.00 |
| 48 | Edge line, 6", type 1 (642E00104) | MI | 0.15 | $9,950.00 | $4,200.00 | $9,500.00 | $10,001 | $12,143 | $4,000.00 |
| 49 | Center line, type 1 (642E00300) | MI | 0.08 | $14,170 | $4,200.00 | $13,000 | $13,327 | $16,185 | $4,000.00 |
| 50 | Detour signing (614E12420) | LS | 1 | $2,900.00 | $5,260.50 | $6,035.00 | $6,407.60 | $8,063.00 | $5,000.00 |
| 51 | Portable changeable message sign, as per plan (614E18601) | SNMT | 2 | $1,000.00 | $997.50 | $1,150.00 | $1,215.01 | $1,192.00 | $950.00 |
| 52 | Structure removed, as per plan (202E11001) | LS | 1 | $6,700.00 | $2,808.00 | $10,000 | $14,753 | $11,811 | $17,000 |
| 53 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $5,200.00 | $4,297.50 | $15,000 | $12,231 | $24,000 | $12,000 |
| 54 | Unclassified excavation (503E21300) | LS | 1 | $16,600 | $2,340.00 | $5,000.00 | $16,242 | $6,774.00 | $8,500.00 |
| 55 | Epoxy coated steel reinforcement (509E10000) | LB | 2,498 | $2.32 | $2.03 | $4.50 | $2.55 | $2.00 | $6.00 |
| 56 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 4.50 | $2,645.00 | $1,735.10 | $3,800.00 | $2,079.30 | $3,644.00 | $2,000.00 |
| 57 | Class QC1 concrete, footing (511E46510) | CY | 15 | $812.00 | $1,152.44 | $850.00 | $766.69 | $937.00 | $1,000.00 |
| 58 | Class QC1 concrete, headwall (511E46610) | CY | 2 | $2,500.00 | $2,093.44 | $3,800.00 | $1,053.86 | $1,140.00 | $2,700.00 |
| 59 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 21 | $96.00 | $39.84 | $100.00 | $74.54 | $52.00 | $100.00 |
| 60 | Type 2 waterproofing (512E33000) | SY | 116 | $30.00 | $31.28 | $40.00 | $26.54 | $26.00 | $30.00 |
| 61 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $1,300.00 | $2,390.85 | $2,300.00 | $1,677.99 | $2,654.00 | $4,600.00 |
| 62 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,780.00 | $4,428.66 | $10,000 | $5,115.84 | $9,500.00 | $10,000 |
| 63 | Maintaining traffic (614E11000) | LS | 1 | $1,060.00 | $2,646.00 | $3,300.00 | $7,085.45 | $6,000.00 | $14,000 |
| 64 | Field office, type A (619E16000) | MNTH | 2 | $700.00 | $3,460.50 | $5,000.00 | $400.00 | $684.00 | $1,750.00 |
| 65 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,944.00 | $3,480.00 | $10,000 | $6,711.99 | $6,279.00 | $8,000.00 |
| 66 | Mobilization (624E10000) | LS | 1 | $20,170 | $12,176 | $10,000 | $10,936 | $26,000 | $42,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 16, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.