Koski Construction Co: ODOT bid record
Koski Construction Co submitted 11 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 13 APR 2023, and was the low bidder on 3 of them (27%). When it was not low, its total sat a median +6.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $8,731,491
- Latest bid
- 13 APR 2023
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 2 | 0 | 0% |
| 2021 | 4 | 1 | 25% |
| 2022 | 3 | 1 | 33% |
| 2023 | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 13 | 13 (100%) | $1.00 | $1.00 |
| Ground mounted support, no. 2 post | 630E02100 | FT | 15 | 7 (47%) | $25.00 | $15.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 15 | 6 (40%) | $50.00 | $23.50 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 14 | 5 (36%) | $43.00 | $20.00 |
| Work zone stop line, class III, 642 paint | 614E26610 | FT | 9 | 5 (56%) | $3.50 | $3.50 |
| Pavement repair | 253E01000 | SY | 8 | 5 (63%) | $115.00 | $120.00 |
| Work zone center line, class III, 642 paint | 614E21550 | MI | 7 | 5 (71%) | $1,200.00 | $1,186.00 |
| Curb, type 6 | 609E26000 | FT | 7 | 5 (71%) | $35.00 | $37.50 |
| Partial depth pavement repair (441) | 251E01000 | SY | 7 | 4 (57%) | $39.00 | $45.00 |
| Work zone center line, class I | 614E21000 | MI | 6 | 4 (67%) | $1,200.00 | $1,632.50 |
| Catch basin, no. 2-2B | 611E98470 | EACH | 5 | 4 (80%) | $1,200.00 | $2,350.00 |
| Asphalt concrete for maintaining traffic | 614E13000 | CY | 13 | 3 (23%) | $200.00 | $250.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ronyak Paving Inc | 8 | 4 of 8 |
| Karvo Companies Inc | 6 | 1 of 6 |
| Eclipse Co LLC | 4 | 2 of 4 |
| Marucci & Gaffney Excavating Co | 3 | 2 of 3 |
| Kokosing Construction Company Inc | 3 | 1 of 3 |
| Catts Construction Inc | 2 | 2 of 2 |
| Shelly & Sands Inc | 2 | 0 of 2 |
| Americon Industrial Services LLC | 1 | 1 of 1 |
| Rudzik Excavating Inc | 1 | 1 of 1 |
| Bog Construction Inc | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 APR 2023 | 230207 | ATB | ATB-US 6/SR 7-20.28/VAR (TWO LANE RESURFACING) | 3 of 3 | $2,148,363 | +54% |
| 12 JAN 2023 | 230003 | ATB | ATB-SR 193-14.57 (TWO LANE RESURFACING) | 1 of 4 | $2,372,130 | Low, 1.0% under the second |
| 15 SEP 2022 | 220497 | ATB | ATB-IR 90-19.56 (FOUR LANE RESURFACING) | 2 of 4 | $3,115,557 | +1.0% |
| 14 JUL 2022 | 220415 | ATB | ATB-US 20/SR 84-11.02/14.13 (FOUR LANE RESURFACING) | 2 of 4 | $1,297,719 | +3.0% |
| 28 APR 2022 | 220259 | ATB | ATB-SR 84/VAR-21.80/VAR (TWO LANE RESURFACING) | 1 of 3 | $4,960,336 | Low, 13% under the second |
| 30 SEP 2021 | 210503 | ATB | ATB-SR 45-19.47 (INTERSECTION) | 1 of 7 | $1,399,024 | Low, 0.0% under the second |
| 13 MAY 2021 | 210293 | ATB | ATB-SR 11-00.00 (FOUR LANE RESURFACING) | 2 of 4 | $3,038,277 | +6.0% |
| 15 APR 2021 | 210223 | ATB | ATB-Culverts FY2021 (CULVERT REPLACEMENT) | 4 of 6 | $1,246,970 | +18% |
| 11 MAR 2021 | 210152 | ATB | ATB-US 20-21.86 (PART 1, PART 2, PART 3) (MINOR RECONSTRUCTION) | 2 of 4 | $5,099,175 | +6.0% |
| 26 MAR 2020 | 200184 | ATB | ATB-Culverts FY2020 (CULVERT REPLACEMENT) | 8 of 8 | $483,733 | +59% |
| 27 FEB 2020 | 200085 | ATB | ATB-SR 7/SR 531-31.37/21.21 (TWO LANE RESURFACING) | 2 of 2 | $1,157,285 | +1.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.