ODOT contract 260086 bid tabulation

HAR-SR 235-02.39 (TWO LANE RESURFACING). Let by Ohio DOT on February 19, 2026, HAR. 2 bids received; low bid $1,549,672 by Shelly Company, -19% against the engineer's estimate of $1,922,000.

Owner
Ohio DOT
Letting
19 FEB 2026
Pay items
21
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly Company$1,549,672Low-19%
2Bluffton Paving Inc$1,571,205+1.0%-18%
ODOT contract 260086: bids by rank

Engineer's estimate: $1,922,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly Company2. Bluffton Paving Inc
1Wearing course removed (202E23500)SY3,681$5.65$5.65
2Pavement repair (253E02000)CY300$275.00$286.00
3Pavement planing, asphalt concrete, T=1.25" (254E01000)SY144,768$0.95$1.35
4Patching planed surface (254E01600)SY2,821$3.50$2.00
5Aggregate base (304E20000)CY36$75.00$20.00
6Non-tracking tack coat (407E20000)GAL12,306$2.50$2.00
7Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000)CY4,899$204.00$200.00
8Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000)CY128$325.00$380.00
9Compacted aggregate, as per plan (617E10101)CY1,302$59.00$52.00
10RPM (621E00100)EACH659$36.50$36.50
11Raised pavement marker removed (621E54000)EACH659$4.00$4.00
12Edge line, 6", type 1 (642E00104)MI20.81$800.00$800.00
13Center line, type 1 (642E00300)MI10.40$900.00$900.00
14Stop line (644E00500)FT15$25.00$25.00
15Work zone marking sign (614E12460)EACH30$85.00$85.00
16Work zone center line, class I (614E21000)MI10.20$900.00$900.00
17Work zone center line, class II (614E21400)MI20.40$350.00$500.00
18Premium for contract performance bond and for payment bond (103E05000)LS1$10,000$9,500.00
19Maintaining traffic (614E11000)LS1$40,000$36,800
20Monument assembly adjusted to grade (623E39500)EACH5$150.00$150.00
21Mobilization (624E10000)LS1$25,000$20,000
ODOT contract 260086: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of February 19, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy