| 1 | Pavement removed (202E23000) | SY | 3 | $39.00 | $37.00 |
| 2 | Walk removed (202E30000) | SF | 1,600 | $4.20 | $4.00 |
| 3 | Curb removed (202E32000) | FT | 184 | $12.60 | $12.00 |
| 4 | Guardrail removed (202E38000) | FT | 400 | $2.10 | $2.00 |
| 5 | Anchor assembly removed, type T (202E42040) | EACH | 5 | $99.75 | $95.00 |
| 6 | Embankment, as per plan (203E20001) | CY | 10 | $115.50 | $110.00 |
| 7 | Reshaping under guardrail (209E15000) | STA | 7.25 | $84.00 | $80.00 |
| 8 | Linear grading (209E60500) | MI | 8.34 | $1,800.00 | $600.00 |
| 9 | Grading mailbox approaches (209E80000) | EACH | 8 | $240.00 | $700.00 |
| 10 | Guardrail, type 5 (606E13000) | FT | 400 | $22.50 | $21.40 |
| 11 | Raising type 5 guardrail (606E17000) | FT | 262.50 | $9.25 | $8.80 |
| 12 | Anchor assembly, type T (606E26500) | EACH | 5 | $1,245.00 | $1,185.00 |
| 13 | 4" concrete walk (608E10000) | SF | 1,268 | $16.80 | $16.00 |
| 14 | Curb ramp (608E52000) | SF | 356 | $16.80 | $16.00 |
| 15 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 9 | $467.25 | $444.95 |
| 16 | Monument assembly reconstructed to grade, as per plan (623E39601) | EACH | 3 | $1,128.70 | $1,074.95 |
| 17 | Post construction survey monument verification and report (623E51000) | LS | 1 | $2,550.00 | $2,500.00 |
| 18 | Topsoil, as per plan (659E00301) | CY | 4 | $105.00 | $100.00 |
| 19 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 20 | Catch basin adjusted to grade (611E98630) | EACH | 7 | $929.20 | $884.95 |
| 21 | Inlet adjusted to grade (611E99150) | EACH | 2 | $1,496.20 | $1,424.95 |
| 22 | Manhole adjusted to grade (611E99654) | EACH | 22 | $708.70 | $674.95 |
| 23 | Manhole reconstructed to grade (611E99660) | EACH | 1 | $1,653.70 | $1,574.95 |
| 24 | Special - miscellaneous metal (611E99820) | LB | 1,000 | $2.50 | $2.35 |
| 25 | Partial depth pavement repair (442) (251E01030) | CY | 800 | $355.00 | $425.00 |
| 26 | Pavement repair (253E02000) | CY | 87 | $425.00 | $415.00 |
| 27 | Pavement planing, asphalt concrete (1.5") (254E01000) | SY | 103,184 | $1.20 | $1.45 |
| 28 | Patching planed surface (254E01600) | SY | 524 | $5.00 | $25.00 |
| 29 | Tack coat (407E10000) | GAL | 8,322 | $2.55 | $2.50 |
| 30 | Prime coat, as per plan (408E10001) | GAL | 3,921 | $5.30 | $5.75 |
| 31 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E00201) | CY | 4,339 | $192.00 | $192.00 |
| 32 | Curb, type 6 (609E26000) | FT | 251 | $54.50 | $30.00 |
| 33 | Compacted aggregate (617E10100) | CY | 447 | $70.00 | $75.00 |
| 34 | Shoulder preparation (617E20000) | SY | 9,791 | $0.35 | $1.00 |
| 35 | Valve box adjusted to grade (638E10800) | EACH | 6 | $446.20 | $424.95 |
| 36 | RPM (621E00100) | EACH | 606 | $42.55 | $40.50 |
| 37 | Raised pavement marker removed (621E54000) | EACH | 570 | $5.00 | $6.00 |
| 38 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 10 | $12.60 | $12.00 |
| 39 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $68.25 | $95.00 |
| 40 | Removal of ground mounted post support and reerection (630E86010) | EACH | 3 | $68.25 | $270.00 |
| 41 | Edge line, 6", type 1 (642E00104) | MI | 8.60 | $840.00 | $750.00 |
| 42 | Lane line, 6", type 1 (642E00204) | MI | 0.99 | $630.00 | $700.00 |
| 43 | Center line, type 1 (642E00300) | MI | 5.84 | $1,050.00 | $900.00 |
| 44 | Channelizing line, 8" (644E00400) | FT | 1,380 | $2.10 | $2.00 |
| 45 | Stop line (644E00500) | FT | 533 | $8.40 | $6.00 |
| 46 | Crosswalk line, 12" (644E00620) | FT | 326 | $4.20 | $3.00 |
| 47 | Transverse/diagonal line (644E00700) | FT | 1,537 | $7.35 | $6.00 |
| 48 | Island marking (644E00900) | SF | 144 | $8.40 | $6.00 |
| 49 | School symbol marking, 96" (644E01110) | EACH | 1 | $367.50 | $600.00 |
| 50 | Parking lot stall marking (644E01200) | FT | 840 | $1.30 | $2.00 |
| 51 | Lane arrow (644E01300) | EACH | 31 | $105.00 | $90.00 |
| 52 | Word on pavement, 96" (644E01410) | EACH | 7 | $262.50 | $100.00 |
| 53 | Handicap symbol marking (644E01600) | EACH | 4 | $157.50 | $200.00 |
| 54 | Pavement marking, misc.: crosswalk line, 18" (644E50300) | FT | 158 | $6.30 | $12.00 |
| 55 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $97.50 | $95.00 |
| 56 | Work zone marking sign (614E12460) | EACH | 34 | $89.25 | $125.00 |
| 57 | Asphalt concrete for maintaining traffic (614E13000) | CY | 25 | $285.30 | $500.00 |
| 58 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 1.98 | $630.00 | $700.00 |
| 59 | Work zone center line, class III, 642 paint (614E21550) | MI | 11.68 | $1,050.00 | $900.00 |
| 60 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 6.28 | $840.00 | $750.00 |
| 61 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 2,760 | $0.55 | $1.00 |
| 62 | Work zone stop line, class III, 642 paint (614E26610) | FT | 1,066 | $2.10 | $3.00 |
| 63 | Work zone crosswalk line, class III, 12", 642 paint (614E27250) | FT | 968 | $2.10 | $1.00 |
| 64 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 62 | $36.75 | $45.00 |
| 65 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,700.00 | $9,000.00 |
| 66 | Maintaining traffic (614E11000) | LS | 1 | $65,000 | $125,000 |
| 67 | Field office, type C (619E16020) | MNTH | 5 | $3,000.00 | $3,500.00 |
| 68 | Construction layout stakes and surveying (623E10000) | LS | 1 | $7,985.00 | $10,035 |
| 69 | Mobilization (624E10000) | LS | 1 | $85,000 | $98,000 |