ODOT contract 260024 bid tabulation
PAU-SR 49/SR 500/SR 613-Varies (TWO LANE RESURFACING). Let by Ohio DOT on January 15, 2026, PAU. 2 bids received; low bid $1,598,848 by Shelly Company, -4.4% against the engineer's estimate of $1,673,000.
- Owner
- Ohio DOT
- Letting
- 15 JAN 2026
- Pay items
- 36
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly Company | $1,598,848 | Low | -4.0% |
| 2 | Gerken Paving Inc | $2,096,697 | +31% | +25% |
Engineer's estimate: $1,673,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Gerken Paving Inc |
|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 6,604 | $6.00 | $5.75 |
| 2 | Walk removed (202E30000) | SF | 583 | $7.00 | $7.00 |
| 3 | Curb removed (202E32000) | FT | 47.50 | $13.00 | $13.00 |
| 4 | Curb ramp (608E52000) | SF | 583 | $50.00 | $50.00 |
| 5 | Topsoil (659E00300) | CY | 18 | $80.00 | $80.00 |
| 6 | Seeding and mulching (659E10000) | SY | 160 | $4.00 | $4.00 |
| 7 | Commercial fertilizer (659E20000) | TON | 0.10 | $1,500.00 | $1,500.00 |
| 8 | Water (659E35000) | MGAL | 1.50 | $50.00 | $50.00 |
| 9 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 10 | Pavement repair (253E02000) | CY | 200 | $390.00 | $560.00 |
| 11 | Pavement planing, asphalt concrete (T=1 1/4" / 1 1 (254E01000) | SY | 113,710 | $1.45 | $1.75 |
| 12 | Patching planed surface (254E01600) | SY | 2,277 | $5.00 | $10.00 |
| 13 | Aggregate base (304E20000) | CY | 135 | $150.00 | $180.00 |
| 14 | Non-tracking tack coat (407E20000) | GAL | 10,228 | $2.50 | $2.50 |
| 15 | Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000) | CY | 4,326 | $205.00 | $254.00 |
| 16 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 196 | $350.00 | $520.00 |
| 17 | Compacted aggregate, as per plan (617E10101) | CY | 889 | $68.00 | $108.00 |
| 18 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 4.81 | $1,450.00 | $1,450.00 |
| 19 | RPM (621E00100) | EACH | 442 | $40.20 | $40.20 |
| 20 | Raised pavement marker removed (621E54000) | EACH | 442 | $5.00 | $6.00 |
| 21 | Edge line, 6", type 1 (642E00104) | MI | 13.28 | $850.00 | $850.00 |
| 22 | Center line, type 1 (642E00300) | MI | 7.55 | $850.00 | $850.00 |
| 23 | Stop line (644E00500) | FT | 154 | $7.00 | $7.00 |
| 24 | Crosswalk line, 12" (644E00620) | FT | 922 | $4.00 | $4.00 |
| 25 | Crosswalk line, 24" (644E00630) | FT | 734 | $7.00 | $7.00 |
| 26 | Railroad symbol marking (644E01000) | EACH | 3 | $500.00 | $500.00 |
| 27 | Parking lot stall marking (644E01200) | FT | 714 | $1.00 | $1.00 |
| 28 | Handicap symbol marking (644E01600) | EACH | 2 | $125.00 | $125.00 |
| 29 | Work zone marking sign (614E12460) | EACH | 52 | $85.00 | $115.00 |
| 30 | Work zone center line, class I (614E21000) | MI | 9.68 | $850.00 | $850.00 |
| 31 | Work zone center line, class II (614E21400) | MI | 19.36 | $500.00 | $350.00 |
| 32 | Railroad flagging services (900E00100) | EACH | 6,750 | $1.00 | $1.00 |
| 33 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $5,000.00 | $5,000.00 |
| 34 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,000.00 | $11,000 |
| 35 | Maintaining traffic (614E11000) | LS | 1 | $75,000 | $95,000 |
| 36 | Mobilization (624E10000) | LS | 1 | $35,000 | $145,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.