ODOT contract 260158 bid tabulation
WOO-SR 25-06.64 Resurface Portage (FOUR LANE RESURFACING). Let by Ohio DOT on March 26, 2026, WOO. 2 bids received; low bid $1,171,249 by Gerken Paving Inc, -22% against the engineer's estimate of $1,496,000.
- Owner
- Ohio DOT
- Letting
- 26 MAR 2026
- Pay items
- 67
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Gerken Paving Inc | $1,171,249 | Low | -22% |
| 2 | Shelly Company | $1,228,439 | +5.0% | -18% |
Engineer's estimate: $1,496,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerken Paving Inc | 2. Shelly Company |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $4,000.00 | $4,000.00 |
| 2 | Pavement removed, as per plan (202E23001) | SY | 840 | $23.00 | $23.00 |
| 3 | Wearing course removed, as per plan (202E23501) | SY | 7,700 | $4.55 | $6.75 |
| 4 | Walk removed (202E30000) | SF | 14,920 | $1.85 | $1.85 |
| 5 | Curb removed (202E32000) | FT | 3,307 | $10.00 | $10.00 |
| 6 | Removal misc.:remove and replace stoop steps (202E98100) | EACH | 4 | $900.00 | $900.00 |
| 7 | Excavation (203E10000) | CY | 100 | $40.00 | $40.00 |
| 8 | Subgrade compaction (204E10000) | SY | 276 | $2.50 | $2.50 |
| 9 | 4" concrete walk (608E10000) | SF | 16,416 | $6.75 | $6.75 |
| 10 | Curb ramp (608E52000) | SF | 750 | $6.75 | $6.75 |
| 11 | Curb, type 4-C (609E24510) | FT | 3,701 | $19.00 | $19.00 |
| 12 | Luminaire support foundation removed (625E75522) | EACH | 2 | $900.00 | $900.00 |
| 13 | Topsoil furnished and placed (653E10000) | CY | 41 | $75.00 | $75.00 |
| 14 | Commercial fertilizer (654E11000) | TON | 0.05 | $1,500.00 | $1,500.00 |
| 15 | Seeding and mulching (659E10000) | SY | 365 | $2.50 | $2.50 |
| 16 | Repair seeding and mulching (659E14000) | SY | 18 | $10.00 | $10.00 |
| 17 | Water (659E35000) | MGAL | 2 | $50.00 | $50.00 |
| 18 | Erosion control (832E30000) | EACH | 15,000 | $1.00 | $1.00 |
| 19 | 6" base pipe underdrains with geotextile fabric, as per plan (605E14021) | FT | 100 | $12.00 | $12.00 |
| 20 | 6" conduit, type F for underdrain outlets, as per plan (611E00511) | FT | 10 | $25.00 | $25.00 |
| 21 | Catch basin reconstructed to grade (611E98634) | EACH | 10 | $1,400.00 | $1,400.00 |
| 22 | Manhole adjusted to grade (611E99654) | EACH | 5 | $1,500.00 | $1,500.00 |
| 23 | Manhole reconstructed to grade (611E99660) | EACH | 5 | $2,000.00 | $2,100.00 |
| 24 | Pavement planing, asphalt concrete, (4") sta. 112+ (254E01000) | SY | 3,821 | $4.00 | $2.80 |
| 25 | Pavement planing, asphalt concrete, as per plan, A (254E01001) | SY | 3,622 | $5.80 | $5.25 |
| 26 | Full depth pavement removal and rigid replacement, type 1, class QC1 (255E11000) | SY | 320 | $158.00 | $158.00 |
| 27 | Full depth pavement sawing (255E20000) | FT | 1,440 | $3.50 | $3.50 |
| 28 | Aggregate base (304E20000) | CY | 46 | $65.00 | $65.00 |
| 29 | Tack coat (407E10000) | GAL | 2,120 | $2.50 | $3.00 |
| 30 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 650 | $240.00 | $228.00 |
| 31 | Asphalt concrete intermediate course, 19 MM, type A (448) (442E20200) | CY | 1,084 | $200.00 | $193.00 |
| 32 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 150 | $73.00 | $73.00 |
| 33 | 8" non-reinforced concrete pavement, class QC 1P, as per plan (452E12011) | SY | 840 | $75.00 | $75.00 |
| 34 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 140 | $88.50 | $88.50 |
| 35 | Compacted aggregate (617E10100) | CY | 20 | $135.00 | $127.00 |
| 36 | Longitudinal joint adhesive (875E10000) | LB | 600 | $5.00 | $2.00 |
| 37 | Valve box adjusted to grade (638E10800) | EACH | 9 | $500.00 | $900.00 |
| 38 | Special - valve box rebuilt to grade, NWWSD (638E20502) | EACH | 14 | $975.00 | $1,200.00 |
| 39 | RPM (621E00100) | EACH | 12 | $365.00 | $385.00 |
| 40 | Raised pavement marker removed (621E54000) | EACH | 5 | $25.00 | $7.00 |
| 41 | Ground mounted support, no. 3 post (630E03100) | FT | 54 | $12.00 | $12.00 |
| 42 | Sign, flat sheet, as per plan (630E80101) | SF | 22 | $24.00 | $24.00 |
| 43 | Removal of ground mounted post support and disposal, as per plan (630E86003) | EACH | 1 | $25.00 | $25.00 |
| 44 | Removal of pole mounted sign and reerection (630E87520) | EACH | 2 | $85.00 | $85.00 |
| 45 | Edge line, 6", type 1 (642E00104) | MI | 1 | $1,200.00 | $1,200.00 |
| 46 | Lane line, 6", type 1 (642E00204) | MI | 1 | $800.00 | $800.00 |
| 47 | Center line, type 1 (642E00300) | MI | 0.50 | $1,500.00 | $1,500.00 |
| 48 | Stop line (644E00500) | FT | 103 | $9.00 | $9.00 |
| 49 | Crosswalk line, 24" (644E00630) | FT | 538 | $9.00 | $9.00 |
| 50 | Yield line (644E20800) | FT | 48 | $15.00 | $15.00 |
| 51 | Stabilized crushed aggregate, as per plan (411E10001) | CY | 200 | $53.00 | $110.00 |
| 52 | Work zone marking sign (614E12460) | EACH | 27 | $120.00 | $85.00 |
| 53 | Replacement sign (614E12500) | EACH | 5 | $120.00 | $200.00 |
| 54 | Replacement drum (614E12600) | EACH | 10 | $54.00 | $55.00 |
| 55 | Asphalt concrete for maintaining traffic, as per plan (614E13001) | CY | 60 | $300.00 | $250.00 |
| 56 | Portable changeable message sign (614E18600) | SNMT | 2 | $1,350.00 | $1,000.00 |
| 57 | Work zone center line, class I (614E21000) | MI | 2 | $1,500.00 | $1,500.00 |
| 58 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 2 | $14,000 | $14,000 |
| 59 | Work zone edge line, class I, 6" (614E22010) | MI | 1 | $1,200.00 | $1,200.00 |
| 60 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 1 | $9,000.00 | $9,000.00 |
| 61 | Work zone dotted line, class I, 6", 740.06, type I (614E24402) | FT | 2,945 | $1.75 | $1.75 |
| 62 | Water (616E10000) | MGAL | 5 | $50.00 | $800.00 |
| 63 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,000.00 | $3,000.00 |
| 64 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $5,000.00 | $4,800.00 |
| 65 | Maintaining traffic (614E11000) | LS | 1 | $50,000 | $50,000 |
| 66 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,080 | $10,080 |
| 67 | Mobilization (624E10000) | LS | 1 | $50,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 26, 2026. Compiled by Mirage Metrics.