| 1 | Wearing course removed (202E23500) | SY | 6,892 | $1.00 | $4.25 |
| 2 | Walk removed (202E30000) | SF | 131 | $6.00 | $6.00 |
| 3 | Curb removed (202E32000) | FT | 28 | $19.50 | $19.50 |
| 4 | Curb ramp (608E52000) | SF | 189 | $44.00 | $44.00 |
| 5 | Topsoil (659E00300) | CY | 10 | $65.00 | $65.00 |
| 6 | Seeding and mulching (659E10000) | SY | 40 | $2.50 | $2.50 |
| 7 | Commercial fertilizer (659E20000) | TON | 0.10 | $1,500.00 | $1,500.00 |
| 8 | Water (659E35000) | MGAL | 2 | $150.00 | $150.00 |
| 9 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 10 | Pavement repair (253E02000) | CY | 650 | $380.00 | $390.00 |
| 11 | Pavement planing, asphalt concrete (1.25") (254E01000) | SY | 307,351 | $1.00 | $1.15 |
| 12 | Patching planed surface (254E01600) | SY | 6,147 | $5.00 | $13.60 |
| 13 | Aggregate base (304E20000) | CY | 163 | $200.00 | $205.00 |
| 14 | Non-tracking tack coat (407E20000) | GAL | 26,711 | $3.00 | $2.25 |
| 15 | Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000) | CY | 10,672 | $210.00 | $201.00 |
| 16 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 239 | $350.00 | $960.00 |
| 17 | Compacted aggregate, as per plan (617E10101) | CY | 2,241 | $60.00 | $96.00 |
| 18 | Longitudinal joint preparation (874E21000) | MI | 15.64 | $5,000.00 | $4,000.00 |
| 19 | Longitudinal joint adhesive (875E10000) | LB | 18,148 | $1.00 | $1.75 |
| 20 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 31.25 | $965.00 | $665.00 |
| 21 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 15.63 | $885.00 | $885.00 |
| 22 | RPM (621E00100) | EACH | 1,049 | $34.50 | $34.50 |
| 23 | Raised pavement marker removed (621E54000) | EACH | 1,049 | $4.00 | $5.50 |
| 24 | Edge line, 6", type 1 (642E00104) | MI | 34.60 | $900.00 | $825.00 |
| 25 | Center line, type 1 (642E00300) | MI | 17.30 | $900.00 | $900.00 |
| 26 | Channelizing line, 8" (644E00400) | FT | 514 | $2.50 | $2.00 |
| 27 | Stop line (644E00500) | FT | 170 | $7.00 | $7.00 |
| 28 | Crosswalk line, 12" (644E00620) | FT | 880 | $4.00 | $3.00 |
| 29 | Crosswalk line, 24" (644E00630) | FT | 791 | $7.00 | $7.00 |
| 30 | Transverse/diagonal line (644E00700) | FT | 106 | $7.00 | $7.00 |
| 31 | Railroad symbol marking (644E01000) | EACH | 2 | $600.00 | $800.00 |
| 32 | School symbol marking, 72" (644E01100) | EACH | 2 | $300.00 | $700.00 |
| 33 | Parking lot stall marking (644E01200) | FT | 1,746 | $2.00 | $2.50 |
| 34 | Lane arrow (644E01300) | EACH | 8 | $95.00 | $100.00 |
| 35 | Handicap symbol marking (644E01600) | EACH | 4 | $150.00 | $200.00 |
| 36 | Work zone marking sign (614E12460) | EACH | 52 | $85.00 | $120.00 |
| 37 | Work zone center line, class I (614E21000) | MI | 17.30 | $800.00 | $900.00 |
| 38 | Work zone center line, class II (614E21400) | MI | 34.60 | $500.00 | $500.00 |
| 39 | Railroad flagging services (900E00100) | EACH | 6,750 | $1.00 | $1.00 |
| 40 | Wearing course removed (202E23500) | SY | 1,802 | $2.00 | $8.25 |
| 41 | Walk removed (202E30000) | SF | 1,437 | $4.50 | $4.50 |
| 42 | Curb removed (202E32000) | FT | 248 | $12.00 | $12.00 |
| 43 | 4" concrete walk (608E10000) | SF | 493 | $20.00 | $20.00 |
| 44 | Curb ramp (608E52000) | SF | 787 | $20.00 | $20.00 |
| 45 | Detectable warning (608E53020) | SF | 180 | $30.00 | $30.00 |
| 46 | Curb, type 6 (609E26000) | FT | 146 | $31.00 | $31.00 |
| 47 | Topsoil (659E00300) | CY | 2 | $65.00 | $65.00 |
| 48 | Seeding and mulching (659E10000) | SY | 35 | $2.50 | $2.50 |
| 49 | Commercial fertilizer (659E20000) | TON | 0.12 | $1,500.00 | $1,500.00 |
| 50 | Water (659E35000) | MGAL | 0.18 | $150.00 | $150.00 |
| 51 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 52 | Pavement repair (253E02000) | CY | 140 | $400.00 | $590.00 |
| 53 | Pavement planing, asphalt concrete 1.5" thickness (254E01000) | SY | 19,207 | $2.00 | $3.40 |
| 54 | Patching planed surface (254E01600) | SY | 384 | $5.00 | $17.00 |
| 55 | Non-tracking tack coat (407E20000) | GAL | 1,786 | $3.00 | $2.25 |
| 56 | Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000) | CY | 800 | $220.00 | $248.00 |
| 57 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 75 | $350.00 | $570.00 |
| 58 | Longitudinal joint adhesive (875E10000) | LB | 1,439 | $1.25 | $2.75 |
| 59 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 11 | $775.00 | $80.00 |
| 60 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 27 | $1,200.00 | $2,100.00 |
| 61 | Detector loop (632E26500) | EACH | 7 | $1,750.00 | $1,750.00 |
| 62 | Edge line, 6", type 1 (642E00104) | MI | 0.34 | $3,200.00 | $1,000.00 |
| 63 | Center line, type 1 (642E00300) | MI | 1.17 | $1,600.00 | $2,000.00 |
| 64 | Channelizing line, 12" (644E00404) | FT | 533 | $2.50 | $3.00 |
| 65 | Stop line (644E00500) | FT | 405 | $7.00 | $7.00 |
| 66 | Crosswalk line, 24" (644E00630) | FT | 1,002 | $7.00 | $7.00 |
| 67 | Transverse/diagonal line (644E00700) | FT | 160 | $7.00 | $7.00 |
| 68 | Island marking (644E00900) | SF | 70 | $12.00 | $6.00 |
| 69 | School symbol marking, 72" (644E01100) | EACH | 2 | $300.00 | $700.00 |
| 70 | Parking lot stall marking (644E01200) | FT | 156 | $2.00 | $2.50 |
| 71 | Lane arrow (644E01300) | EACH | 19 | $95.00 | $100.00 |
| 72 | Work zone marking sign (614E12460) | EACH | 20 | $85.00 | $120.00 |
| 73 | Work zone center line, class I (614E21000) | MI | 1.09 | $1,600.00 | $2,000.00 |
| 74 | Work zone center line, class II (614E21400) | MI | 2.18 | $750.00 | $1,500.00 |
| 75 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $7,500.00 | $12,000 |
| 76 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $20,000 | $22,000 |
| 77 | Maintaining traffic (614E11000) | LS | 1 | $100,000 | $270,000 |
| 78 | Mobilization (624E10000) | LS | 1 | $50,000 | $240,000 |
| 100 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $6,000.00 | $4,600.00 |