ODOT contract 260214 bid tabulation
SAN-US 20-28.02 Resurfacing (FOUR LANE RESURFACING). Let by Ohio DOT on April 23, 2026, SAN. 3 bids received; low bid $4,394,766 by Erie Blacktop Inc, -12% against the engineer's estimate of $5,014,000.
- Owner
- Ohio DOT
- Letting
- 23 APR 2026
- Pay items
- 46
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Erie Blacktop Inc | $4,394,766 | Low | -12% |
| 2 | Gerken Paving Inc | $4,565,802 | +4.0% | -9.0% |
| 3 | Kokosing Construction Company Inc | $5,416,371 | +23% | +8.0% |
Engineer's estimate: $5,014,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Erie Blacktop Inc | 2. Gerken Paving Inc | 3. Kokosing Construction Company Inc |
|---|---|---|---|---|---|---|
| 1 | Linear grading (209E60500) | MI | 16.01 | $2,000.00 | $1,650.00 | $650.00 |
| 2 | Catch basin adjusted to grade (611E98630) | EACH | 14 | $965.00 | $944.95 | $944.95 |
| 3 | Manhole adjusted to grade (611E99654) | EACH | 7 | $755.00 | $739.95 | $739.95 |
| 4 | Monument assembly adjusted to grade (623E39500) | EACH | 1 | $690.00 | $674.95 | $674.95 |
| 5 | Valve box adjusted to grade (638E10800) | EACH | 1 | $675.00 | $659.95 | $659.95 |
| 6 | Erosion control (832E30000) | EACH | 1,500 | $1.00 | $1.00 | $1.00 |
| 7 | Pavement repair (253E02000) | CY | 2,392 | $380.00 | $310.00 | $300.00 |
| 8 | Pavement planing, asphalt concrete 1.75" (254E01000) | SY | 213,062 | $0.75 | $1.60 | $2.10 |
| 9 | Tack coat (407E10000) | GAL | 18,137 | $2.55 | $2.50 | $2.00 |
| 10 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 13,560 | $11.22 | $15.50 | $22.00 |
| 11 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 10,379 | $220.00 | $212.00 | $260.00 |
| 12 | Compacted aggregate (617E10100) | CY | 911.50 | $75.00 | $78.00 | $60.00 |
| 13 | Void reducing asphalt membrane (vram) (872E10000) | FT | 57,448 | $3.00 | $3.70 | $2.52 |
| 14 | Curb, misc.:quick kurb (609E98000) | FT | 192 | $170.00 | $150.00 | $150.00 |
| 15 | Rumble strips, shoulder (asphalt concrete) (618E40100) | FT | 57,817 | $0.12 | $0.12 | $0.12 |
| 16 | RPM (621E00100) | EACH | 537 | $39.30 | $38.50 | $44.00 |
| 17 | Raised pavement marker removed (621E54000) | EACH | 330 | $7.50 | $6.00 | $6.75 |
| 18 | Edge line, 6", type 1 (642E00104) | MI | 22.52 | $816.00 | $800.00 | $800.00 |
| 19 | Lane line, 6", type 1 (642E00204) | MI | 10.63 | $715.00 | $700.00 | $700.00 |
| 20 | Center line, type 1 (642E00300) | MI | 2.51 | $920.00 | $900.00 | $900.00 |
| 21 | Channelizing line, 8", type 1 (642E00400) | FT | 3,652 | $1.02 | $1.00 | $1.00 |
| 22 | Transverse/diagonal line, type 1 (642E00700) | FT | 3,844 | $3.06 | $3.00 | $3.00 |
| 23 | Dotted line, 6", type 1 (642E01510) | FT | 444 | $1.02 | $1.00 | $1.00 |
| 24 | Stop line (644E00500) | FT | 377 | $9.20 | $9.00 | $9.00 |
| 25 | Crosswalk line, 24" (644E00630) | FT | 272 | $9.20 | $9.00 | $9.00 |
| 26 | Chevron marking (644E00720) | FT | 210 | $9.20 | $9.00 | $9.00 |
| 27 | Lane arrow (644E01300) | EACH | 41 | $102.00 | $100.00 | $100.00 |
| 28 | Detector loop, as per plan (632E26501) | EACH | 24 | $3,060.00 | $1,500.00 | $1,500.00 |
| 29 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 50 | $102.00 | $105.00 | $120.00 |
| 30 | Work zone marking sign (614E12460) | EACH | 38 | $153.00 | $120.00 | $108.62 |
| 31 | Work zone increased penalties sign, as per plan (614E12485) | EACH | 12 | $230.00 | $175.00 | $250.15 |
| 32 | Replacement sign (614E12500) | EACH | 3 | $196.00 | $120.00 | $250.00 |
| 33 | Replacement drum (614E12600) | EACH | 5 | $55.00 | $55.00 | $55.00 |
| 34 | Work zone lane line, class I, 6" (614E20010) | MI | 21.26 | $715.00 | $700.00 | $650.00 |
| 35 | Work zone center line, class I (614E21000) | MI | 2.48 | $920.00 | $900.00 | $600.00 |
| 36 | Work zone channelizing line, class I, 8" (614E23000) | FT | 3,652 | $1.02 | $1.00 | $0.60 |
| 37 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 3,652 | $1.02 | $1.00 | $0.60 |
| 38 | Work zone stop line, class I (614E26000) | FT | 302 | $3.06 | $3.00 | $2.00 |
| 39 | Work zone stop line, class III, 642 paint (614E26610) | FT | 302 | $3.06 | $3.00 | $2.00 |
| 40 | Work zone arrow, class I (614E30000) | EACH | 41 | $61.20 | $60.00 | $30.00 |
| 41 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 41 | $61.20 | $60.00 | $30.00 |
| 42 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 18 | $867.00 | $900.00 | $754.28 |
| 43 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $20,000 | $20,000 | $21,000 |
| 44 | Maintaining traffic (614E11000) | LS | 1 | $100,000 | $362,250 | $484,740 |
| 45 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $9,485.00 | $2,500.00 |
| 46 | Mobilization (624E10000) | LS | 1 | $165,000 | $95,000 | $275,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.