ODOT contract 260464 bid tabulation
WOO-/HEN-SR 18/SR 64/SR 582-00.00/09.18/05.35 (TWO LANE RESURFACING). Let by Ohio DOT on October 15, 2026, WOO. 2 bids received; low bid $4,217,030 by Gerken Paving Inc, -2.2% against the engineer's estimate of $4,314,000.
- Owner
- Ohio DOT
- Letting
- 15 OCT 2026
- Pay items
- 64
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Gerken Paving Inc | $4,217,030 | Low | -2.0% |
| 2 | Shelly Company | $4,520,727 | +7.0% | +5.0% |
Engineer's estimate: $4,314,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerken Paving Inc | 2. Shelly Company |
|---|---|---|---|---|---|
| 1 | Guardrail removed (202E38000) | FT | 5,625 | $2.00 | $2.00 |
| 2 | Anchor assembly removed, type A (202E42000) | EACH | 7 | $320.00 | $320.00 |
| 3 | Anchor assembly removed, type E (202E42010) | EACH | 2 | $170.00 | $170.00 |
| 4 | Anchor assembly removed, type T (202E42040) | EACH | 12 | $89.00 | $89.00 |
| 5 | Reshaping under guardrail (209E15050) | MI | 2 | $350.00 | $350.00 |
| 6 | Linear grading (209E60500) | MI | 10 | $1,500.00 | $2,000.00 |
| 7 | Preparing subgrade for shoulder paving (209E72050) | MI | 18 | $425.00 | $1,300.00 |
| 8 | Guardrail, type MGS (606E15050) | FT | 1,138 | $21.00 | $21.00 |
| 9 | Guardrail, type MGS with long posts (606E15100) | FT | 4,375 | $25.60 | $25.60 |
| 10 | Anchor assembly, MGS type E (606E26150) | EACH | 8 | $2,485.00 | $2,485.00 |
| 11 | Anchor assembly, MGS type T (606E26550) | EACH | 13 | $1,295.00 | $1,295.00 |
| 12 | Monument assembly reconstructed to grade (623E39600) | EACH | 8 | $1,610.00 | $1,600.00 |
| 13 | Topsoil (659E00300) | CY | 302 | $32.50 | $32.50 |
| 14 | Seeding and mulching (659E10000) | SY | 2,717 | $2.40 | $2.40 |
| 15 | Repair seeding and mulching (659E14000) | SY | 136 | $1.10 | $1.10 |
| 16 | Inter-seeding (659E15000) | SY | 136 | $0.10 | $0.10 |
| 17 | Commercial fertilizer (659E20000) | TON | 1 | $96.00 | $96.00 |
| 18 | Water (659E35000) | MGAL | 15 | $1.00 | $1.00 |
| 19 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 20 | Catch basin adjusted to grade (611E98630) | EACH | 11 | $1,925.00 | $2,150.00 |
| 21 | Manhole adjusted to grade (611E99654) | EACH | 12 | $1,790.00 | $2,300.00 |
| 22 | Full depth rigid pavement removal and flexible replacement, as per plan (252E01001) | SY | 17 | $465.00 | $625.00 |
| 23 | Pavement repair (253E02000) | CY | 1,573 | $240.00 | $260.00 |
| 24 | Pavement planing, asphalt concrete, 1 3/4" (254E01000) | SY | 43,242 | $1.55 | $1.16 |
| 25 | Pavement planing, asphalt concrete, 3 1/4" (254E01000) | SY | 99,314 | $2.85 | $2.65 |
| 26 | Tack coat (407E10000) | GAL | 20,560 | $2.50 | $2.50 |
| 27 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 6,271 | $228.00 | $226.00 |
| 28 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 4,828 | $202.00 | $210.50 |
| 29 | Rumble stripes, edge line (asphalt concrete) (618E40800) | FT | 2,651 | $4.25 | $1.75 |
| 30 | Rumble stripes, center line (asphalt concrete) (618E40900) | FT | 1,326 | $4.25 | $1.75 |
| 31 | Longitudinal joint adhesive (875E10000) | LB | 12,179 | $1.75 | $1.05 |
| 32 | Valve box adjusted to grade (638E10800) | EACH | 10 | $925.00 | $1,000.00 |
| 33 | RPM (621E00100) | EACH | 494 | $44.75 | $44.75 |
| 34 | Raised pavement marker removed (621E54000) | EACH | 494 | $6.00 | $6.00 |
| 35 | Barrier reflector, type 5, bidirectional (626E00116) | EACH | 81 | $14.00 | $14.00 |
| 36 | Edge line, 6", type 1 (642E00104) | MI | 18 | $900.00 | $900.00 |
| 37 | Center line, type 1 (642E00300) | MI | 10 | $1,000.00 | $100.00 |
| 38 | Channelizing line, 12", type 1 (642E00404) | FT | 432 | $2.00 | $2.00 |
| 39 | Crosswalk line, 24", type 1 (642E00630) | FT | 480 | $4.00 | $4.00 |
| 40 | Transverse/diagonal line, type 1 (642E00700) | FT | 156 | $4.00 | $4.00 |
| 41 | Railroad symbol marking, type 1 (642E01000) | EACH | 4 | $400.00 | $400.00 |
| 42 | School symbol marking, 72", type 1 (642E01100) | EACH | 3 | $300.00 | $300.00 |
| 43 | Parking lot stall marking, type 1 (642E01200) | FT | 480 | $2.00 | $2.00 |
| 44 | Lane arrow, type 1 (642E01300) | EACH | 5 | $75.00 | $75.00 |
| 45 | Stop line (644E00500) | FT | 349 | $10.00 | $10.00 |
| 46 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $110.00 | $100.00 |
| 47 | Work zone marking sign (614E12460) | EACH | 20 | $105.00 | $100.00 |
| 48 | Replacement sign (614E12500) | EACH | 3 | $125.00 | $200.00 |
| 49 | Replacement drum (614E12600) | EACH | 10 | $55.00 | $45.00 |
| 50 | Portable changeable message sign (614E18600) | SNMT | 4 | $1,250.00 | $1,000.00 |
| 51 | Work zone center line, class I, 642 paint (614E21100) | MI | 10 | $1,000.00 | $1,000.00 |
| 52 | Work zone center line, class II, 642 paint (614E21500) | MI | 6 | $400.00 | $400.00 |
| 53 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 16 | $900.00 | $900.00 |
| 54 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 432 | $2.00 | $2.00 |
| 55 | Work zone stop line, class I, 642 paint (614E26200) | FT | 319 | $4.00 | $4.00 |
| 56 | Work zone stop line, class III, 642 paint (614E26610) | FT | 319 | $4.00 | $4.00 |
| 57 | Work zone railroad symbol marking, class I, 642 paint (614E32200) | EACH | 4 | $400.00 | $400.00 |
| 58 | Work zone railroad symbol marking, class III, 642 paint (614E32210) | EACH | 4 | $400.00 | $400.00 |
| 59 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $10,000 | $3,500.00 |
| 60 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $17,500 | $10,000 |
| 61 | Maintaining traffic (614E11000) | LS | 1 | $167,000 | $628,000 |
| 62 | Mobilization (624E10000) | LS | 1 | $175,000 | $65,000 |
| 100 | Compacted aggregate (617E10100) | CY | 1,793 | $112.00 | $76.00 |
| 101 | Longitudinal joint preparation (874E20000) | FT | 4,341 | $3.30 | $4.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 15, 2026. Compiled by Mirage Metrics.