ODOT contract 250496 bid tabulation
ERI-SR 2-24.50 (FOUR LANE RESURFACING). Let by Ohio DOT on October 23, 2025, ERI. 3 bids received; low bid $12,841,483 by Gerken Paving Inc, -2.7% against the engineer's estimate of $13,203,000.
- Owner
- Ohio DOT
- Letting
- 23 OCT 2025
- Pay items
- 120
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Gerken Paving Inc | $12,841,483 | Low | -3.0% |
| 2 | Kokosing Construction Company Inc | $12,842,123 | 0.0% | -3.0% |
| 3 | Erie Blacktop Inc | $12,870,720 | 0.0% | -3.0% |
Engineer's estimate: $13,203,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerken Paving Inc | 2. Kokosing Construction Company Inc | 3. Erie Blacktop Inc |
|---|---|---|---|---|---|---|
| 1 | Guardrail removed (202E38000) | FT | 306.25 | $3.00 | $3.00 | $2.10 |
| 2 | Guardrail removed for reuse (202E38200) | FT | 300 | $3.00 | $3.00 | $2.75 |
| 3 | Guardrail removed, barrier design (202E38300) | FT | 37.50 | $3.00 | $3.00 | $4.20 |
| 4 | Guardrail removed for reuse, barrier design (202E38410) | FT | 50 | $3.00 | $3.00 | $5.05 |
| 5 | Anchor assembly removed, type E (202E42010) | EACH | 11 | $175.00 | $175.00 | $152.25 |
| 6 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $150.00 | $150.00 | $84.00 |
| 7 | Bridge terminal assembly removed (202E47000) | EACH | 3 | $175.00 | $175.00 | $78.75 |
| 8 | Impact attenuator removed (202E47800) | EACH | 1 | $375.00 | $375.00 | $242.00 |
| 9 | Embankment, as per plan (203E20001) | CY | 20 | $115.00 | $115.00 | $76.65 |
| 10 | Reshaping under guardrail, as per plan (209E15001) | STA | 14.04 | $50.00 | $50.00 | $52.50 |
| 11 | Linear grading (209E60500) | MI | 1.75 | $7,500.00 | $5,800.00 | $6,700.00 |
| 12 | Preparing subgrade for shoulder paving, as per plan (209E72051) | MI | 23.59 | $5,000.00 | $5,100.00 | $4,400.00 |
| 13 | Guardrail, type 5 (606E13000) | FT | 37.50 | $21.00 | $21.00 | $22.30 |
| 14 | Guardrail, type MGS (606E15050) | FT | 268.75 | $21.00 | $21.00 | $21.85 |
| 15 | Guardrail, barrier design, type MGS (606E15550) | FT | 37.50 | $23.50 | $23.50 | $40.35 |
| 16 | Guardrail rebuilt, type 5 (606E16500) | FT | 300 | $9.00 | $9.00 | $13.90 |
| 17 | Guardrail rebuilt, barrier design, type 5 (606E16600) | FT | 50 | $10.00 | $10.00 | $28.15 |
| 18 | Raising type 5 guardrail (606E17000) | FT | 112.50 | $7.50 | $7.50 | $7.15 |
| 19 | Anchor assembly, type E (606E26100) | EACH | 10 | $2,350.00 | $2,350.00 | $2,540.00 |
| 20 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 1 | $2,350.00 | $2,350.00 | $2,575.00 |
| 21 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,200.00 | $1,200.00 | $1,445.00 |
| 22 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,250.00 | $2,250.00 | $2,600.00 |
| 23 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 1 | $350.00 | $350.00 | $475.00 |
| 24 | Impact attenuator, type 1 (bidirectional) (606E60012) | EACH | 1 | $9,400.00 | $9,400.00 | $9,400.00 |
| 25 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 | $1.00 |
| 26 | Catch basin adjusted to grade (611E98630) | EACH | 6 | $1,100.00 | $1,100.00 | $1,255.00 |
| 27 | Special - miscellaneous metal (611E99820) | LB | 500 | $3.00 | $3.00 | $3.15 |
| 28 | Partial depth pavement repair (442), as per plan (251E01031) | CY | 1,763 | $335.00 | $250.00 | $250.00 |
| 29 | Partial depth pavement repair (442), as per plan (251E01031) | CY | 754 | $450.00 | $425.00 | $575.00 |
| 30 | Pavement planing, asphalt concrete (1.50 inch) (254E01000) | SY | 20,211 | $2.75 | $1.25 | $1.35 |
| 31 | Pavement planing, asphalt concrete (3.25 inch) (254E01000) | SY | 263,428 | $3.30 | $2.65 | $1.60 |
| 32 | Patching planed surface (254E01600) | SY | 1,404 | $15.00 | $3.00 | $10.40 |
| 33 | Full depth pavement removal and rigid replacement, type 2, class QC MS (255E16000) | SY | 1,835 | $132.25 | $120.00 | $170.00 |
| 34 | Full depth pavement removal and rigid replacement, type 2, class QC MS (255E16000) | SY | 16,525 | $132.25 | $120.00 | $170.00 |
| 35 | Full depth pavement sawing (255E20000) | FT | 66,106 | $3.20 | $2.25 | $3.50 |
| 36 | Tack coat (407E10000) | GAL | 35,629 | $2.25 | $2.50 | $2.65 |
| 37 | Prime coat, as per plan (408E10001) | GAL | 11,888 | $3.85 | $5.00 | $5.00 |
| 38 | Anti-segregation equipment (442E00100) | CY | 18,516 | $1.00 | $1.00 | $9.00 |
| 39 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 12,661 | $205.00 | $255.00 | $218.00 |
| 40 | Asphalt concrete surface course, 12.5 MM, type A (447) (442E10300) | CY | 11,694 | $245.00 | $260.00 | $242.00 |
| 41 | Asphalt concrete surface course, 12.5 MM, type A (447) (442E10300) | CY | 292 | $245.00 | $260.00 | $235.00 |
| 42 | Compacted aggregate (617E10100) | CY | 1,656 | $40.00 | $50.00 | $83.50 |
| 43 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 24.32 | $1,025.00 | $575.00 | $595.00 |
| 44 | RPM (621E00100) | EACH | 796 | $36.00 | $36.00 | $36.75 |
| 45 | Raised pavement marker removed (621E54000) | EACH | 796 | $4.00 | $5.50 | $6.50 |
| 46 | Barrier reflector, type 2, 1 way (626E00110) | EACH | 22 | $13.00 | $13.00 | $13.95 |
| 47 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 4 | $13.00 | $13.00 | $14.20 |
| 48 | Stop line (644E00500) | FT | 60 | $9.00 | $9.00 | $8.40 |
| 49 | Chevron marking (644E00720) | FT | 416 | $10.00 | $10.00 | $8.40 |
| 50 | Wrong way arrow (644E01360) | EACH | 4 | $125.00 | $125.00 | $210.00 |
| 51 | Speed measurement marking (644E40000) | EACH | 20 | $432.25 | $250.00 | $315.00 |
| 52 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 0.70 | $4,200.00 | $4,200.00 | $8,925.00 |
| 53 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 0.28 | $2,100.00 | $2,100.00 | $5,775.00 |
| 54 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 116 | $3.00 | $3.00 | $13.95 |
| 55 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 25.85 | $3,900.00 | $3,900.00 | $3,990.00 |
| 56 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 11.98 | $2,000.00 | $2,000.00 | $2,310.00 |
| 57 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 1,592 | $2.00 | $2.00 | $3.15 |
| 58 | Wet reflective thermoplastic pavement marking, dotted line, 6" (807E14410) | FT | 3,182 | $1.25 | $1.25 | $2.10 |
| 59 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 37.71 | $1,750.00 | $1,750.00 | $1,840.00 |
| 60 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 3,182 | $1.00 | $1.00 | $1.05 |
| 61 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 1,592 | $1.50 | $1.50 | $2.10 |
| 62 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 0.98 | $3,500.00 | $3,500.00 | $4,200.00 |
| 63 | Grooving for 12" recessed pavement marking, (concrete) (850E20130) | FT | 116 | $2.25 | $2.25 | $3.15 |
| 64 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 1,200 | $109.80 | $125.00 | $105.00 |
| 65 | Detour signing (614E12420) | LS | 1 | $20,000 | $15,000 | $12,600 |
| 66 | Asphalt concrete for maintaining traffic (614E13000) | CY | 100 | $375.00 | $200.00 | $200.00 |
| 67 | Portable changeable message sign, as per plan (614E18601) | SNMT | 24 | $1,000.00 | $880.00 | $1,000.00 |
| 68 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 35.95 | $500.00 | $425.00 | $525.00 |
| 69 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 75.41 | $800.00 | $700.00 | $890.00 |
| 70 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 4,777 | $0.55 | $0.45 | $1.05 |
| 71 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 9,546 | $0.50 | $0.40 | $0.55 |
| 72 | Work zone stop line, class III, 642 paint (614E26610) | FT | 119 | $5.00 | $3.00 | $3.15 |
| 73 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 84 | $750.00 | $726.75 | $685.00 |
| 74 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 2 | $100.00 | $212.94 | $225.00 |
| 75 | Patching concrete structure (519E11100) | SF | 15 | $150.00 | $236.40 | $250.00 |
| 76 | Removal misc.: joint sealer (202E98200) | FT | 78 | $14.00 | $6.45 | $6.80 |
| 77 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 71 | $25.00 | $28.44 | $30.00 |
| 78 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 676 | $12.00 | $10.92 | $11.50 |
| 79 | Joint sealer (516E31000) | FT | 78 | $17.00 | $25.86 | $27.15 |
| 80 | Special - patching concrete bridge deck (519E12510) | SY | 15 | $600.00 | $883.50 | $928.00 |
| 81 | Removal misc.: joint sealer (202E98200) | FT | 78 | $14.00 | $6.45 | $6.80 |
| 82 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 71 | $25.00 | $28.44 | $30.00 |
| 83 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 676 | $12.00 | $10.92 | $11.50 |
| 84 | Joint sealer (516E31000) | FT | 78 | $17.00 | $25.86 | $27.15 |
| 85 | Special - patching concrete bridge deck (519E12510) | SY | 8 | $750.00 | $883.50 | $928.00 |
| 86 | Removal misc.: joint sealer (202E98200) | FT | 78 | $14.00 | $6.45 | $6.80 |
| 87 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 72 | $25.00 | $28.44 | $30.00 |
| 88 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 451 | $15.00 | $10.92 | $11.50 |
| 89 | Joint sealer (516E31000) | FT | 78 | $17.00 | $25.86 | $27.15 |
| 90 | Special - patching concrete bridge deck (519E12510) | SY | 30 | $600.00 | $883.50 | $928.00 |
| 91 | Removal misc.: joint sealer (202E98200) | FT | 78 | $14.00 | $6.45 | $6.80 |
| 92 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 72 | $25.00 | $28.44 | $30.00 |
| 93 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 451 | $15.00 | $10.92 | $11.50 |
| 94 | Joint sealer (516E31000) | FT | 78 | $14.00 | $25.86 | $27.15 |
| 95 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 2 | $100.00 | $212.94 | $225.00 |
| 96 | Patching concrete structure (519E11100) | SF | 21 | $150.00 | $227.00 | $238.50 |
| 97 | Removal misc.: joint sealer (202E98200) | FT | 78 | $14.00 | $6.45 | $6.80 |
| 98 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 78 | $25.00 | $28.44 | $30.00 |
| 99 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 2 | $100.00 | $212.94 | $223.60 |
| 100 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,027 | $12.00 | $10.92 | $11.50 |
| 101 | Joint sealer (516E31000) | FT | 78 | $10.00 | $25.86 | $27.15 |
| 102 | Patching concrete structure (519E11100) | SF | 15 | $150.00 | $236.40 | $248.50 |
| 103 | Portions of structure removed, as per plan (202E11301) | CY | 3 | $5,000.00 | $1,856.00 | $1,949.00 |
| 104 | Removal misc.: joint sealer (202E98200) | FT | 130 | $14.00 | $6.45 | $6.80 |
| 105 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 130 | $25.00 | $28.44 | $30.00 |
| 106 | Class QC2 concrete, superstructure, as per plan (511E34411) | CY | 3 | $5,000.00 | $2,469.00 | $2,592.50 |
| 107 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 63 | $50.00 | $49.99 | $52.50 |
| 108 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,769 | $12.00 | $10.92 | $11.50 |
| 109 | Joint sealer (516E31000) | FT | 130 | $17.00 | $25.86 | $27.15 |
| 110 | Patching concrete structure (519E11100) | SF | 36 | $150.00 | $218.90 | $230.00 |
| 111 | Special - patching concrete bridge deck (519E12510) | SY | 1 | $1,000.00 | $1,593.00 | $1,673.00 |
| 112 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $70,000 | $51,300 | $55,000 |
| 113 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $7,500.00 | $2,500.00 | $13,500 |
| 114 | Maintaining traffic (614E11000) | LS | 1 | $730,000 | $674,192 | $500,000 |
| 115 | Field office, type C (619E16020) | MNTH | 8 | $3,125.00 | $3,600.00 | $3,400.00 |
| 116 | Construction layout stakes and surveying (623E10000) | LS | 1 | $9,400.00 | $3,000.00 | $13,500 |
| 117 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $7,290.00 | $4,200.00 | $8,000.00 |
| 118 | Mobilization (624E10000) | LS | 1 | $640,000 | $640,000 | $410,000 |
| 200 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 1.48 | $30,000 | $8,000.00 | $11,550 |
| 201 | Work zone dotted line, class I, 6", 740.06, type II (614E24602) | FT | 7,840 | $4.00 | $1.00 | $2.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.