ODOT contract 250372 bid tabulation
HAN-SR 15-20.26 (INTERSECTION). Let by Ohio DOT on July 31, 2025, HAN. 3 bids received; low bid $221,810 by Advanced Excavating & Demolition LLC, -19% against the engineer's estimate of $274,000.
- Owner
- Ohio DOT
- Letting
- 31 JUL 2025
- Pay items
- 35
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Advanced Excavating & Demolition LLC | $221,810 | Low | -19% |
| 2 | Eagle Bridge Co | $263,543 | +19% | -4.0% |
| 3 | Eclipse Co LLC | $275,809 | +24% | +1.0% |
Engineer's estimate: $274,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Advanced Excavating & Demolition LLC | 2. Eagle Bridge Co | 3. Eclipse Co LLC |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,000.00 | $1,000.00 | $1,410.39 |
| 2 | Pavement removed (202E23000) | SY | 42 | $30.00 | $30.00 | $50.00 |
| 3 | Guardrail removed (202E38000) | FT | 45 | $35.00 | $12.00 | $17.00 |
| 4 | Fence removed (202E75000) | FT | 33 | $10.00 | $11.00 | $11.00 |
| 5 | Excavation (203E10000) | CY | 1,107 | $23.50 | $42.50 | $45.00 |
| 6 | Embankment (203E20000) | CY | 10 | $35.00 | $42.50 | $63.00 |
| 7 | Subgrade compaction (204E10000) | SY | 2,286 | $0.95 | $4.00 | $1.50 |
| 8 | Excavation of subgrade (204E13000) | CY | 300 | $25.00 | $20.00 | $35.00 |
| 9 | Granular material, type B (204E30010) | CY | 300 | $62.50 | $60.00 | $47.00 |
| 10 | Proof rolling (204E45000) | HR | 1 | $285.00 | $135.00 | $242.00 |
| 11 | Geotextile fabric (204E50000) | SY | 1,680 | $2.50 | $1.50 | $2.00 |
| 12 | Fence, type 47 (607E15000) | FT | 33 | $91.50 | $91.50 | $97.50 |
| 13 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $2,000.00 | $5,000.00 | $4,815.00 |
| 14 | Water (616E10000) | MGAL | 1 | $1.00 | $20.00 | $1.00 |
| 15 | Topsoil (659E00300) | CY | 106 | $26.00 | $15.00 | $74.50 |
| 16 | Seeding and mulching (659E10000) | SY | 975 | $3.10 | $6.00 | $4.50 |
| 17 | Repair seeding and mulching (659E14000) | SY | 48 | $3.10 | $3.00 | $3.00 |
| 18 | Commercial fertilizer (659E20000) | TON | 0.13 | $850.00 | $1,500.00 | $615.23 |
| 19 | Lime (659E31000) | ACRE | 0.20 | $35.00 | $10.00 | $48.15 |
| 20 | Water (659E35000) | MGAL | 5 | $1.00 | $20.00 | $1.00 |
| 21 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 |
| 22 | Aggregate drains (605E31100) | FT | 240 | $18.00 | $12.00 | $12.00 |
| 23 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 249 | $205.00 | $205.00 | $219.00 |
| 24 | Aggregate base (304E20000) | CY | 422 | $67.50 | $105.00 | $65.00 |
| 25 | Non-tracking tack coat (407E20000) | GAL | 176 | $3.00 | $3.00 | $3.00 |
| 26 | Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000) | CY | 77 | $300.00 | $300.00 | $321.00 |
| 27 | Ground mounted support, no. 3 post (630E03100) | FT | 86 | $32.50 | $32.50 | $35.00 |
| 28 | Sign post reflector (630E08600) | EACH | 8 | $45.00 | $45.00 | $48.00 |
| 29 | Sign, flat sheet (630E80100) | SF | 26 | $40.00 | $40.00 | $43.00 |
| 30 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $15.00 | $15.00 | $16.00 |
| 31 | Removal of ground mounted post support and disposal (630E86002) | EACH | 4 | $25.00 | $25.00 | $27.00 |
| 32 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,500.00 | $5,000.00 | $3,973.00 |
| 33 | Maintaining traffic (614E11000) | LS | 1 | $6,500.00 | $5,000.00 | $9,467.00 |
| 34 | Construction layout stakes and surveying (623E10000) | LS | 1 | $8,000.00 | $7,500.00 | $4,248.00 |
| 35 | Mobilization (624E10000) | LS | 1 | $8,500.00 | $12,500 | $31,112 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 31, 2025. Compiled by Mirage Metrics.