ODOT contract 254023 bid tabulation

ASD-SR 39-05.20 (CULVERT REPLACEMENT). Let by Ohio DOT on September 11, 2025, ASD. 4 bids received; low bid $442,608 by Advanced Excavating & Demolition LLC, -3.8% against the engineer's estimate of $460,000.

Owner
Ohio DOT
Letting
11 SEP 2025
Pay items
56
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Advanced Excavating & Demolition LLC$442,608Low-4.0%
2Rietschlin Construction Inc$449,367+2.0%-2.0%
3Crawford Construction Company Inc$476,365+8.0%+4.0%
4Buds Inc$478,734+8.0%+4.0%
ODOT contract 254023: bids by rank

Engineer's estimate: $460,000.

Bid tabulation

LinePay itemUnitQuantity1. Advanced Excavating & Demolition LLC2. Rietschlin Construction Inc3. Crawford Construction Company Inc4. Buds Inc
1Clearing and grubbing (201E11000)LS1$10,000$4,000.00$3,000.00$3,000.00
2Pavement removed (202E23000)SY235$13.50$15.00$12.54$28.00
3Pipe removed, 24" and under (202E35100)FT58$20.00$37.00$17.00$65.00
4Excavation (203E10000)CY239$35.00$32.00$38.66$28.00
5Embankment (203E20000)CY186$25.00$26.00$32.20$35.00
6Subgrade compaction (204E10000)SY256$2.00$7.00$3.00$5.00
7Monument assembly, type C (623E38500)EACH3$2,250.00$1,590.00$1,600.00$2,000.00
8Preconstruction survey monument verification and report (623E50000)LS1$3,880.00$870.00$908.00$1,500.00
9Post construction survey monument verification and report (623E51000)LS1$3,880.00$870.00$908.00$1,500.00
10Rock channel protection, type B with filter (601E32100)CY22$245.00$182.00$279.00$135.00
11Soil analysis test (659E00100)EACH2$50.00$100.00$20.00$50.00
12Topsoil (659E00300)CY96$42.00$55.00$46.80$25.00
13Seeding and mulching (659E10000)SY868$3.00$2.75$5.75$3.00
14Repair seeding and mulching (659E14000)SY43$2.00$2.75$1.00$0.01
15Inter-seeding (659E15000)SY43$1.00$2.75$1.00$0.01
16Commercial fertilizer (659E20000)TON0.12$800.00$1,300.00$590.00$750.00
17Lime (659E31000)ACRE0.18$10.00$100.00$472.00$650.00
18Water (659E35000)MGAL4.81$10.00$20.00$5.00$1.00
19Slope erosion protection mat, type C (670E00530)SY431$4.00$5.50$12.00$5.25
20Erosion control (832E30000)EACH3,000$1.00$1.00$1.00$1.00
21Aggregate drains (605E31100)FT32$35.00$25.00$34.00$35.00
2218" conduit, type C (611E07600)FT59$70.00$100.00$81.00$75.00
23Catch basin, no. 5 (611E98300)EACH1$3,500.00$5,700.00$1,810.00$5,200.00
24Pavement planing, asphalt concrete (3.0") (254E01000)SY158$30.00$27.50$23.00$35.00
25Asphalt concrete base, PG64-22, (449) (301E56000)CY54$450.00$385.00$460.00$450.00
26Aggregate base (304E20000)CY112$92.00$105.00$121.50$95.00
27Tack coat (407E10000)GAL65$3.25$4.00$9.20$3.00
28Prime coat, as per plan (408E10001)GAL38$35.00$38.50$17.25$2.00
29Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001)CY34$550.00$605.00$517.00$550.00
30Raised pavement marker removed (621E54000)EACH2$100.00$50.00$120.00$5.00
31Removal of ground mounted sign and reerection (630E85100)EACH3$55.00$61.00$60.00$50.00
32Removal of ground mounted post support and reerection (630E86010)EACH2$76.00$168.00$90.00$50.00
33Edge line, 6", type 1 (642E00104)MI0.05$23,380$25,800$100,000$25,000
34Center line, type 1 (642E00300)MI0.02$25,285$27,900$100,000$25,000
35Detour signing (614E12420)LS1$4,200.00$5,000.00$8,625.00$5,000.00
36Portable changeable message sign, as per plan (614E18601)SNMT2$1,010.00$1,120.00$2,070.00$2,000.00
37Structure removed, as per plan (202E11001)LS1$7,000.00$12,300$13,520$12,000
38Cofferdams and excavation bracing (503E11100)LS1$15,000$18,000$3,250.00$5,000.00
39Unclassified excavation (503E21300)LS1$10,000$13,500$28,000$7,500.00
40Epoxy coated steel reinforcement (509E10000)LB4,931$2.75$2.50$4.29$1.65
41Class QC1 concrete, retaining/wingwall not including footing (511E46010)CY11$1,100.00$1,400.00$1,729.00$2,200.00
42Class QC1 concrete, footing (511E46510)CY31$575.00$725.00$965.00$905.00
43Class QC1 concrete, headwall (511E46610)CY2$2,665.00$1,250.00$1,448.00$1,800.00
44Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY20$65.00$94.00$104.00$25.00
45Type 2 waterproofing (512E33000)SY86$55.00$36.00$52.00$20.00
46Type 3 waterproofing (512E33010)SY98$62.00$51.00$80.00$35.00
471" preformed expansion joint filler (516E13600)SF32$30.00$13.00$15.00$15.00
48Porous backfill with geotextile fabric (518E21230)LS1$7,500.00$2,700.00$4,811.00$4,500.00
49Concrete masonry (602E20000)CY0.33$4,500.00$3,300.00$7,940.00$3,500.00
5012' X 4' conduit, type A, 706.05 (611E95600)FT60$1,450.00$1,725.00$1,500.00$2,448.00
5112' X 4' conduit, type A, 706.05, as per plan (611E95601)FT15$2,000.00$3,575.00$3,448.00$4,000.00
52Premium for contract performance bond and for payment bond (103E05000)LS1$10,000$7,200.00$4,350.00$8,000.00
53Maintaining traffic (614E11000)LS1$15,000$2,200.00$8,325.00$5,000.00
54Field office, type B (619E16010)MNTH4$1,250.00$1,790.00$500.00$200.00
55Construction layout stakes and surveying (623E10000)LS1$11,500$5,500.00$4,312.00$6,200.00
56Mobilization (624E10000)LS1$45,000$30,000$33,000$20,000
ODOT contract 254023: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way