ODOT contract 250258 bid tabulation

PAU-SR 637-12.27 (SLIDE REPAIR). Let by Ohio DOT on May 8, 2025, PAU. 6 bids received; low bid $741,944 by Miller Contracting Group Inc, -28% against the engineer's estimate of $1,033,000.

Owner
Ohio DOT
Letting
08 MAY 2025
Pay items
54
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Miller Contracting Group Inc$741,944Low-28%
2Vernon Nagel Inc$770,273+4.0%-25%
3Fenson Contracting LLC$827,612+12%-20%
4VTF Excavation LLC$988,237+33%-4.0%
5Advanced Excavating & Demolition LLC$1,056,440+42%+2.0%
6Eclipse Co LLC$1,164,522+57%+13%
ODOT contract 250258: bids by rank

Engineer's estimate: $1,033,000.

Bid tabulation

LinePay itemUnitQuantity1. Miller Contracting Group Inc2. Vernon Nagel Inc3. Fenson Contracting LLC4. VTF Excavation LLC5. Advanced Excavating & Demolition LLC6. Eclipse Co LLC
1Clearing and grubbing (201E11000)LS1$10,000$10,000$25,000$9,891.31$20,000$1,500.00
2Pavement removed (202E23000)SY1,933$6.00$10.00$9.00$6.46$11.00$8.00
3Pipe removed, 24" and under (202E35100)FT294$13.00$6.00$10.00$16.55$20.00$28.00
4Guardrail removed (202E38000)FT1,212.50$2.25$4.00$2.10$2.69$2.00$2.00
5Anchor assembly removed, type A, as per plan (202E42001)EACH2$211.00$290.00$305.00$1,008.80$290.00$290.00
6Catch basin removed (202E58100)EACH4$454.00$250.00$350.00$557.77$780.00$450.00
7Removal misc.: wood pole (202E98100)EACH1$123.00$250.00$250.00$309.10$750.00$450.00
8Excavation (203E10000)CY7,185$8.00$10.00$17.25$15.75$25.00$30.00
9Embankment (203E20000)CY3,095$18.00$10.00$7.75$19.46$20.00$20.00
10Subgrade compaction (204E10000)SY2,164$1.25$1.00$1.50$1.13$2.00$1.00
11Granular material, type C (204E30020)CY721$88.00$44.00$47.50$46.17$56.00$117.00
12Proof rolling (204E45000)HR2$233.00$250.00$150.00$292.27$345.00$292.00
13Geotextile fabric (204E50000)SY5,705$1.25$1.75$1.75$4.36$3.50$4.00
14Guardrail, type MGS with long posts, as per plan (606E15101)FT1,400$25.00$23.40$25.50$31.52$23.50$23.00
15Anchor assembly, MGS type E (MASH 2016) (606E26150)EACH2$2,611.00$3,150.00$2,600.00$3,340.20$2,480.00$2,480.00
16Preconstruction survey monument verification and report (623E50000)LS1$2,950.00$3,000.00$1,800.00$3,367.14$2,000.00$2,500.00
17Post construction survey monument verification and report (623E51000)LS1$2,950.00$2,000.00$1,800.00$3,367.14$2,000.00$2,500.00
18Dumped rock fill, type D, as per plan (601E28001)CY3,506$47.00$72.00$62.00$78.03$76.00$98.00
19Rock channel protection, type C with geotextile fabric (601E32204)CY13$163.00$120.00$150.00$132.95$162.00$143.00
20Soil analysis test (659E00100)EACH2$55.00$60.00$60.00$67.35$60.00$70.00
21Topsoil (659E00300)CY510$31.00$30.00$50.00$20.44$30.00$68.00
22Seeding and mulching (659E10000)SY4,590$1.65$1.25$2.25$1.63$1.10$2.00
23Repair seeding and mulching (659E14000)SY230$0.80$1.10$1.10$0.67$1.10$1.00
24Commercial fertilizer (659E20000)TON0.62$800.00$850.00$850.00$942.81$850.00$820.00
25Lime (659E31000)ACRE0.95$5.00$35.00$35.00$6.74$35.00$35.00
26Water (659E35000)MGAL25$5.00$1.00$1.00$6.73$1.00$1.00
27Storm water pollution prevention plan (832E15000)LS1$2,448.00$1,500.00$2,500.00$3,131.44$750.00$2,325.00
28Storm water pollution prevention inspections (832E15002)LS1$4,300.00$7,000.00$3,500.00$5,959.84$8,750.00$3,150.00
29Storm water pollution prevention inspection software (832E15010)LS1$8,440.00$8,500.00$8,500.00$10,794$8,200.00$8,014.00
30Erosion control (832E30000)EACH15,000$1.00$1.00$1.00$1.00$1.00$1.00
31Aggregate drains (605E31100)FT272$33.00$15.00$18.50$18.42$25.00$22.00
3212" conduit, type C (611E04600)FT190$44.00$65.00$48.00$64.97$90.00$116.00
33Catch basin, no. 2-2B (611E98470)EACH2$2,050.00$2,800.00$2,400.00$3,462.09$3,000.00$4,955.00
34Asphalt concrete base, PG64-22, (449) (301E56000)CY220$222.00$225.00$225.00$333.29$240.00$210.00
35Aggregate base (304E20000)CY463$62.00$65.00$57.75$55.09$62.00$76.00
36Non-tracking tack coat (407E20000)GAL214$2.75$2.50$2.50$1.35$1.00$3.00
37Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY163$265.00$250.00$265.00$390.59$290.00$250.00
38Delineator, post ground mounted (620E00500)EACH2$79.00$180.00$190.00$242.44$180.00$180.00
39RPM (621E00100)EACH10$320.00$300.00$455.00$511.81$380.00$300.00
40Barrier reflector, type 2, bidirectional (626E00110)EACH16$13.25$12.00$15.00$16.84$12.50$13.00
41Removal of ground mounted sign and reerection (630E85100)EACH2$110.00$100.00$100.00$127.95$100.00$95.00
42Removal of ground mounted post support and reerection (630E86010)EACH3$160.00$150.00$150.00$329.98$150.00$245.00
43Edge line, 6", type 1 (642E00104)MI0.27$3,850.00$3,650.00$2,450.00$3,097.78$2,300.00$3,650.00
44Center line, type 1 (642E00300)MI0.14$3,850.00$3,650.00$4,850.00$6,195.50$4,600.00$3,650.00
45Pavement repair (253E02000)CY20$450.00$475.00$550.00$829.53$600.00$475.00
46Non-tracking tack coat (407E20000)GAL20$2.75$2.50$2.50$1.35$1.00$3.00
47Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY10$500.00$500.00$550.00$942.80$700.00$500.00
48Water (616E10000)MGAL21$1.00$1.00$25.00$1.35$1.00$35.00
49Compacted aggregate (617E10100)CY50$55.00$90.00$60.00$68.23$78.00$150.00
50Premium for contract performance bond and for payment bond (103E05000)LS1$9,800.00$7,500.00$9,000.00$6,818.31$20,000$12,981
51Maintaining traffic (614E11000)LS1$9,520.00$5,000.00$25,000$11,583$45,000$10,266
52Field office, type B (619E16010)MNTH3$950.00$2,200.00$4,500.00$3,367.14$2,000.00$857.00
53Construction layout stakes and surveying (623E10000)LS1$10,275$9,500.00$18,000$8,835.37$12,000$13,687
54Mobilization (624E10000)LS1$59,095$37,000$20,000$69,195$60,000$56,800
ODOT contract 250258: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy