Miller Contracting Group Inc: ODOT bid record

Miller Contracting Group Inc submitted 18 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 01 OCT 2026, and was the low bidder on 6 of them (33%). When it was not low, its total sat a median +14% above the low bid.

Owner
Ohio DOT
Low bid volume
$6,173,824
Latest bid
01 OCT 2026
Data through
12 NOV 2026
18Bids
6Low bids
33Win rate, percent
+14%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
20202150%
20215240%
2022100%
2023100%
20242150%
20254125%
20263133%
Miller Contracting Group Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
PAU4250%
DEF4125%
AUG2150%
PUT2150%
ALL200%
HAN100%
MER100%
VAN11100%
HAR100%
Miller Contracting Group Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1818 (100%)$1.00$1.00
Water659E35000MGAL189 (50%)$1.00$1.00
Aggregate base304E20000CY179 (53%)$55.10$90.00
Excavation203E10000CY188 (44%)$17.25$27.00
Compacted aggregate617E10100CY107 (70%)$53.00$100.00
Catch basin, no. 2-2B611E98470EACH87 (88%)$1,777.50$2,350.00
Pavement removed202E23000SY136 (46%)$12.20$17.00
Embankment203E20000CY165 (31%)$16.50$25.00
Subgrade compaction204E10000SY165 (31%)$1.35$3.00
Lime659E31000ACRE95 (56%)$35.00$150.00
Pipe removed, 24" and under202E35100FT95 (56%)$7.50$20.00
12" conduit, type B611E04400FT65 (83%)$59.00$98.00
Miller Contracting Group Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Miller Contracting Group Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
01 OCT 2026260433PUTPUT-SR 115-05.23 AND VARIOUS (CULVERT REPLACEMENT)4 of 6$2,221,500+9.0%
21 MAY 2026260265DEFDEF-SR 66-04.24 (SLIDE REPAIR)5 of 6$1,753,227+12%
26 MAR 2026260143AUGAUG-SR 501/SR 198-02.32/02.36 (INTERSECTION)1 of 2$1,699,234Low, 28% under the second
08 MAY 2025250258PAUPAU-SR 637-12.27 (SLIDE REPAIR)1 of 6$741,944Low, 4.0% under the second
24 APR 2025250209ALLALL-Harrod Improvements (MINOR RECONSTRUCTION)4 of 6$2,073,041+35%
24 APR 2025250217DEFDEF-US 24-01.61/02.89 (SLIDE REPAIR)4 of 5$3,729,492+43%
27 MAR 2025250159HARHAR-Detroit St. Reconstruction (MINOR RECONSTRUCTION)2 of 2$4,389,550+1.0%
21 MAR 2024240176DEFDEF-US 24-04.73 (SLIDE REPAIR)3 of 3$1,095,115+28%
11 JAN 2024240028VANVAN-SR 81-02.55 (MINOR RECONSTRUCTION)1 of 3$1,410,690Low, 0.0% under the second
26 JAN 2023230040ALLALL-SR 66-11.22 (MINOR RECONSTRUCTION)2 of 3$3,539,031+5.0%
16 JUN 2022220377PAUPAU-US 24-13.52 (SLIDE REPAIR)4 of 4$3,392,351+58%
14 OCT 2021210537DEFDEF-US 24-03.20 (SLIDE REPAIR)1 of 6$711,471Low, 3.0% under the second
01 JUL 2021210405PUTPUT-SR 109-02.63 (MISCELLANEOUS)1 of 5$222,593Low, 20% under the second
29 APR 2021210260AUGAUG-US 33-16.72 (INTERSECTION)2 of 3$1,350,482+16%
29 APR 2021210272MERMER-SR 117/SR 707-07.21/06.37 (CULVERT REPLACEMENT)2 of 3$386,858+13%
01 APR 2021210209PAUPAU-SR 111-23.69 (SLIDE REPAIR)4 of 5$407,670+37%
13 FEB 2020200070PAUPAU-US 24-05.42/11.52 (SLIDE REPAIR)1 of 6$1,387,892Low, 22% under the second
23 JAN 2020200015HANHAN-US 68-05.37 Arlington Phase 3 (MINOR RECONSTRUCTION)2 of 4$923,704+8.0%
Miller Contracting Group Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy