ODOT contract 250217 bid tabulation
DEF-US 24-01.61/02.89 (SLIDE REPAIR). Let by Ohio DOT on April 24, 2025, DEF. 5 bids received; low bid $2,611,765 by Miller Bros Const Inc, -20% against the engineer's estimate of $3,252,000.
- Owner
- Ohio DOT
- Letting
- 24 APR 2025
- Pay items
- 80
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Miller Bros Const Inc | $2,611,765 | Low | -20% |
| 2 | Vernon Nagel Inc | $2,906,213 | +11% | -11% |
| 3 | Geddis Paving & Excavating Inc | $3,540,347 | +36% | +9.0% |
| 4 | Miller Contracting Group Inc | $3,729,492 | +43% | +15% |
| 5 | Eclipse Co LLC | $5,568,228 | +113% | +71% |
Engineer's estimate: $3,252,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Miller Bros Const Inc | 2. Vernon Nagel Inc | 3. Geddis Paving & Excavating Inc | 4. Miller Contracting Group Inc | 5. Eclipse Co LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $35,000 | $25,000 | $5,250.00 | $10,000 | $2,500.00 |
| 2 | Headwall removed (202E20010) | EACH | 5 | $400.00 | $400.00 | $700.00 | $602.00 | $495.77 |
| 3 | Pavement removed (202E23000) | SY | 136 | $50.00 | $80.00 | $32.00 | $66.00 | $24.86 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 202 | $7.00 | $6.00 | $42.00 | $22.00 | $29.24 |
| 5 | Pipe removed, over 24" diameter (202E35200) | FT | 20 | $40.00 | $22.00 | $78.00 | $49.00 | $120.48 |
| 6 | Guardrail removed for reuse (202E38200) | FT | 2,637.50 | $3.00 | $3.00 | $3.35 | $4.00 | $2.42 |
| 7 | Catch basin removed (202E58100) | EACH | 2 | $800.00 | $400.00 | $630.00 | $550.00 | $538.30 |
| 8 | Fence removed (202E75000) | FT | 2,418 | $3.50 | $4.00 | $3.90 | $4.00 | $2.32 |
| 9 | Excavation (203E10000) | CY | 52,395 | $11.70 | $10.00 | $10.00 | $18.75 | $20.47 |
| 10 | Embankment (203E20000) | CY | 91,088 | $11.70 | $14.50 | $18.00 | $14.25 | $33.53 |
| 11 | Subgrade compaction (204E10000) | SY | 872 | $1.00 | $1.00 | $0.50 | $3.00 | $0.94 |
| 12 | Ditch cleanout (209E10000) | FT | 478 | $11.00 | $15.00 | $18.50 | $8.00 | $42.64 |
| 13 | Guardrail rebuilt, type MGS (606E16050) | FT | 2,587.50 | $12.00 | $12.00 | $13.50 | $13.25 | $15.35 |
| 14 | MGS bridge terminal assembly rebuilt, type 1 (606E35012) | EACH | 2 | $850.00 | $850.00 | $950.00 | $926.00 | $2,363.40 |
| 15 | MGS bridge terminal assembly rebuilt, type 2 (606E35112) | EACH | 2 | $450.00 | $450.00 | $505.00 | $490.00 | $454.50 |
| 16 | Fence, type 47 (607E15000) | FT | 2,507 | $17.00 | $17.00 | $19.00 | $19.00 | $1.82 |
| 17 | Right-of-way monument, type B (623E40520) | EACH | 8 | $500.00 | $450.00 | $685.00 | $1,317.00 | $625.31 |
| 18 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $4,500.00 | $2,680.00 | $6,700.00 | $3,049.00 | $2,525.00 |
| 19 | Post construction survey monument verification and report (623E51000) | LS | 1 | $4,500.00 | $2,450.00 | $6,700.00 | $3,049.00 | $2,525.00 |
| 20 | Topsoil stockpiled (651E10000) | CY | 4,137 | $6.00 | $6.50 | $3.85 | $18.00 | $22.62 |
| 21 | Placing stockpiled topsoil (652E10000) | CY | 4,137 | $6.00 | $5.00 | $4.50 | $11.00 | $27.14 |
| 22 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 236 | $57.00 | $55.00 | $110.00 | $79.00 | $112.25 |
| 23 | Dumped rock fill, type D (601E28000) | CY | 1,824 | $42.00 | $92.00 | $100.00 | $85.00 | $119.04 |
| 24 | Rock channel protection, type C with filter (601E32200) | CY | 53 | $100.00 | $125.00 | $260.00 | $123.00 | $137.15 |
| 25 | Soil analysis test (659E00100) | EACH | 2 | $60.00 | $60.00 | $67.00 | $131.00 | $151.50 |
| 26 | Seeding and mulching (659E10000) | SY | 37,267 | $0.90 | $1.30 | $1.00 | $1.65 | $1.46 |
| 27 | Repair seeding and mulching (659E14000) | SY | 1,863 | $0.90 | $0.90 | $1.00 | $1.00 | $0.96 |
| 28 | Commercial fertilizer (659E20000) | TON | 5.10 | $850.00 | $850.00 | $850.00 | $926.00 | $585.80 |
| 29 | Lime (659E31000) | ACRE | 7.70 | $35.00 | $35.00 | $35.00 | $39.00 | $40.40 |
| 30 | Water (659E35000) | MGAL | 202 | $1.00 | $1.00 | $1.00 | $2.00 | $1.01 |
| 31 | Storm water pollution prevention plan (832E15000) | LS | 1 | $1,025.00 | $2,500.00 | $1,150.00 | $1,116.00 | $1,035.25 |
| 32 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $6,150.00 | $7,500.00 | $6,900.00 | $7,812.00 | $11,363 |
| 33 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $14,500 | $15,000 | $19,300 | $15,751 | $14,613 |
| 34 | Erosion control (832E30000) | EACH | 25,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 35 | Concrete masonry (602E20000) | CY | 3.50 | $2,400.00 | $2,600.00 | $2,900.00 | $4,172.00 | $2,787.46 |
| 36 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 60 | $35.00 | $30.00 | $41.50 | $45.00 | $37.13 |
| 37 | 6" conduit, type F (611E01500) | FT | 20 | $28.00 | $12.00 | $320.00 | $53.00 | $45.79 |
| 38 | 12" conduit, type F (611E05200) | FT | 493 | $70.00 | $70.00 | $120.00 | $67.00 | $85.35 |
| 39 | 15" conduit, type F (611E06700) | FT | 317 | $76.00 | $100.00 | $120.00 | $73.00 | $96.30 |
| 40 | 48" conduit, type A, 706.02 (611E20700) | FT | 60 | $380.00 | $350.00 | $455.00 | $262.00 | $565.40 |
| 41 | Catch basin, no. 3A (611E98180) | EACH | 8 | $2,800.00 | $3,500.00 | $3,000.00 | $2,922.00 | $4,708.59 |
| 42 | Low strength mortar backfill (613E41200) | CY | 10 | $300.00 | $200.00 | $255.00 | $154.00 | $358.20 |
| 43 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 3 | $1,925.00 | $1,925.00 | $3,050.00 | $2,096.00 | $1,944.25 |
| 44 | Aggregate base (304E20000) | CY | 146 | $95.00 | $100.00 | $89.00 | $84.00 | $86.03 |
| 45 | Combination curb and gutter, type 4, as per plan (609E23001) | FT | 2,240 | $24.00 | $30.00 | $40.50 | $27.00 | $45.45 |
| 46 | Connection, fused pull apart (625E00450) | EACH | 2 | $125.00 | $214.25 | $140.00 | $137.00 | $216.40 |
| 47 | Connection, unfused permanent (625E00480) | EACH | 3 | $125.00 | $197.00 | $140.00 | $137.00 | $198.97 |
| 48 | Light pole anchor bolts, headed (625E10604) | EACH | 4 | $75.00 | $238.25 | $84.00 | $82.00 | $240.63 |
| 49 | Light pole foundation, 24" X 10' deep (625E14200) | EACH | 1 | $2,900.00 | $3,102.50 | $3,250.00 | $3,158.00 | $3,133.53 |
| 50 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 113 | $13.00 | $20.35 | $14.50 | $15.00 | $20.55 |
| 51 | Trench, 24" deep (625E29002) | FT | 103 | $20.00 | $17.95 | $22.50 | $22.00 | $18.13 |
| 52 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $1,650.00 | $2,040.00 | $1,850.00 | $1,797.00 | $2,060.40 |
| 53 | Ground rod (625E32000) | EACH | 1 | $300.00 | $481.25 | $335.00 | $327.00 | $486.06 |
| 54 | Remove and reerect existing light pole (625E35010) | EACH | 1 | $2,850.00 | $2,017.50 | $3,200.00 | $3,103.00 | $2,037.68 |
| 55 | Light pole foundation removed (625E75500) | EACH | 1 | $400.00 | $1,206.25 | $450.00 | $436.00 | $1,218.31 |
| 56 | Disconnect circuit, as per plan (625E75801) | EACH | 1 | $346.00 | $592.50 | $390.00 | $376.00 | $598.43 |
| 57 | Ground mounted structural beam support, W8X18 (630E07000) | FT | 42 | $65.00 | $65.00 | $73.00 | $71.00 | $68.18 |
| 58 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 41.30 | $50.00 | $50.00 | $56.00 | $55.00 | $50.50 |
| 59 | Ground mounted structural beam support foundation (630E84500) | EACH | 4 | $1,425.00 | $1,425.00 | $1,600.00 | $1,552.00 | $1,565.50 |
| 60 | Removal of ground mounted sign and reerection (630E85100) | EACH | 5 | $75.00 | $75.00 | $84.00 | $82.00 | $80.80 |
| 61 | Removal of ground mounted major sign and reerection (630E85600) | EACH | 1 | $425.00 | $425.00 | $475.00 | $463.00 | $555.50 |
| 62 | Removal of ground mounted post support and reerection (630E86010) | EACH | 3 | $110.00 | $110.00 | $125.00 | $120.00 | $101.00 |
| 63 | Removal of ground mounted structural beam support (630E86102) | EACH | 4 | $225.00 | $225.00 | $250.00 | $245.00 | $247.45 |
| 64 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $75.00 | $90.00 | $175.00 | $101.00 | $75.75 |
| 65 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 2 | $2,046.68 | $2,050.00 | $2,300.00 | $2,229.00 | $2,067.15 |
| 66 | Work zone increased penalties sign (614E12484) | EACH | 4 | $249.72 | $250.00 | $410.00 | $272.00 | $252.22 |
| 67 | Replacement drum (614E12600) | EACH | 10 | $55.21 | $56.00 | $235.00 | $61.00 | $55.76 |
| 68 | Barrier reflector, type 1, one way (614E13310) | EACH | 72 | $13.39 | $13.50 | $19.00 | $15.00 | $13.52 |
| 69 | Object marker, one way (614E13350) | EACH | 72 | $20.89 | $21.00 | $24.50 | $23.00 | $21.10 |
| 70 | Portable changeable message sign (614E18600) | SNMT | 6 | $965.04 | $965.00 | $1,750.00 | $1,051.00 | $974.69 |
| 71 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 1.32 | $9,545.72 | $9,550.00 | $10,700 | $10,393 | $9,641.17 |
| 72 | Work zone dotted line, class I, 6", 740.06, type I (614E24402) | FT | 1,560 | $1.38 | $1.38 | $1.55 | $2.00 | $1.39 |
| 73 | Water (616E10000) | MGAL | 287 | $5.00 | $1.00 | $10.00 | $68.00 | $27.36 |
| 74 | Portable barrier, unanchored (622E41100) | FT | 3,600 | $21.00 | $14.00 | $78.00 | $44.00 | $49.73 |
| 75 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 24 | $421.68 | $425.00 | $425.00 | $460.00 | $425.90 |
| 76 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,500 | $28,000 | $29,300 | $38,400 | $50,000 |
| 77 | Maintaining traffic (614E11000) | LS | 1 | $35,000 | $21,500 | $50,000 | $56,073 | $56,353 |
| 78 | Field office, type B (619E16010) | MNTH | 6 | $2,150.00 | $1,800.00 | $2,000.00 | $1,615.00 | $809.29 |
| 79 | Construction layout stakes and surveying (623E10000) | LS | 1 | $12,400 | $28,000 | $25,000 | $20,386 | $29,018 |
| 80 | Mobilization (624E10000) | LS | 1 | $130,500 | $145,000 | $100,000 | $302,000 | $82,491 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 24, 2025. Compiled by Mirage Metrics.