ODOT contract 250217 bid tabulation

DEF-US 24-01.61/02.89 (SLIDE REPAIR). Let by Ohio DOT on April 24, 2025, DEF. 5 bids received; low bid $2,611,765 by Miller Bros Const Inc, -20% against the engineer's estimate of $3,252,000.

Owner
Ohio DOT
Letting
24 APR 2025
Pay items
80
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Miller Bros Const Inc$2,611,765Low-20%
2Vernon Nagel Inc$2,906,213+11%-11%
3Geddis Paving & Excavating Inc$3,540,347+36%+9.0%
4Miller Contracting Group Inc$3,729,492+43%+15%
5Eclipse Co LLC$5,568,228+113%+71%
ODOT contract 250217: bids by rank

Engineer's estimate: $3,252,000.

Bid tabulation

LinePay itemUnitQuantity1. Miller Bros Const Inc2. Vernon Nagel Inc3. Geddis Paving & Excavating Inc4. Miller Contracting Group Inc5. Eclipse Co LLC
1Clearing and grubbing (201E11000)LS1$35,000$25,000$5,250.00$10,000$2,500.00
2Headwall removed (202E20010)EACH5$400.00$400.00$700.00$602.00$495.77
3Pavement removed (202E23000)SY136$50.00$80.00$32.00$66.00$24.86
4Pipe removed, 24" and under (202E35100)FT202$7.00$6.00$42.00$22.00$29.24
5Pipe removed, over 24" diameter (202E35200)FT20$40.00$22.00$78.00$49.00$120.48
6Guardrail removed for reuse (202E38200)FT2,637.50$3.00$3.00$3.35$4.00$2.42
7Catch basin removed (202E58100)EACH2$800.00$400.00$630.00$550.00$538.30
8Fence removed (202E75000)FT2,418$3.50$4.00$3.90$4.00$2.32
9Excavation (203E10000)CY52,395$11.70$10.00$10.00$18.75$20.47
10Embankment (203E20000)CY91,088$11.70$14.50$18.00$14.25$33.53
11Subgrade compaction (204E10000)SY872$1.00$1.00$0.50$3.00$0.94
12Ditch cleanout (209E10000)FT478$11.00$15.00$18.50$8.00$42.64
13Guardrail rebuilt, type MGS (606E16050)FT2,587.50$12.00$12.00$13.50$13.25$15.35
14MGS bridge terminal assembly rebuilt, type 1 (606E35012)EACH2$850.00$850.00$950.00$926.00$2,363.40
15MGS bridge terminal assembly rebuilt, type 2 (606E35112)EACH2$450.00$450.00$505.00$490.00$454.50
16Fence, type 47 (607E15000)FT2,507$17.00$17.00$19.00$19.00$1.82
17Right-of-way monument, type B (623E40520)EACH8$500.00$450.00$685.00$1,317.00$625.31
18Preconstruction survey monument verification and report (623E50000)LS1$4,500.00$2,680.00$6,700.00$3,049.00$2,525.00
19Post construction survey monument verification and report (623E51000)LS1$4,500.00$2,450.00$6,700.00$3,049.00$2,525.00
20Topsoil stockpiled (651E10000)CY4,137$6.00$6.50$3.85$18.00$22.62
21Placing stockpiled topsoil (652E10000)CY4,137$6.00$5.00$4.50$11.00$27.14
22Tied concrete block mat with type 2 underlayment (601E21060)SY236$57.00$55.00$110.00$79.00$112.25
23Dumped rock fill, type D (601E28000)CY1,824$42.00$92.00$100.00$85.00$119.04
24Rock channel protection, type C with filter (601E32200)CY53$100.00$125.00$260.00$123.00$137.15
25Soil analysis test (659E00100)EACH2$60.00$60.00$67.00$131.00$151.50
26Seeding and mulching (659E10000)SY37,267$0.90$1.30$1.00$1.65$1.46
27Repair seeding and mulching (659E14000)SY1,863$0.90$0.90$1.00$1.00$0.96
28Commercial fertilizer (659E20000)TON5.10$850.00$850.00$850.00$926.00$585.80
29Lime (659E31000)ACRE7.70$35.00$35.00$35.00$39.00$40.40
30Water (659E35000)MGAL202$1.00$1.00$1.00$2.00$1.01
31Storm water pollution prevention plan (832E15000)LS1$1,025.00$2,500.00$1,150.00$1,116.00$1,035.25
32Storm water pollution prevention inspections (832E15002)LS1$6,150.00$7,500.00$6,900.00$7,812.00$11,363
33Storm water pollution prevention inspection software (832E15010)LS1$14,500$15,000$19,300$15,751$14,613
34Erosion control (832E30000)EACH25,000$1.00$1.00$1.00$1.00$1.00
35Concrete masonry (602E20000)CY3.50$2,400.00$2,600.00$2,900.00$4,172.00$2,787.46
364" conduit, type F for underdrain outlet (611E00410)FT60$35.00$30.00$41.50$45.00$37.13
376" conduit, type F (611E01500)FT20$28.00$12.00$320.00$53.00$45.79
3812" conduit, type F (611E05200)FT493$70.00$70.00$120.00$67.00$85.35
3915" conduit, type F (611E06700)FT317$76.00$100.00$120.00$73.00$96.30
4048" conduit, type A, 706.02 (611E20700)FT60$380.00$350.00$455.00$262.00$565.40
41Catch basin, no. 3A (611E98180)EACH8$2,800.00$3,500.00$3,000.00$2,922.00$4,708.59
42Low strength mortar backfill (613E41200)CY10$300.00$200.00$255.00$154.00$358.20
43Asphalt concrete base, PG64-22, (449) (301E56000)CY3$1,925.00$1,925.00$3,050.00$2,096.00$1,944.25
44Aggregate base (304E20000)CY146$95.00$100.00$89.00$84.00$86.03
45Combination curb and gutter, type 4, as per plan (609E23001)FT2,240$24.00$30.00$40.50$27.00$45.45
46Connection, fused pull apart (625E00450)EACH2$125.00$214.25$140.00$137.00$216.40
47Connection, unfused permanent (625E00480)EACH3$125.00$197.00$140.00$137.00$198.97
48Light pole anchor bolts, headed (625E10604)EACH4$75.00$238.25$84.00$82.00$240.63
49Light pole foundation, 24" X 10' deep (625E14200)EACH1$2,900.00$3,102.50$3,250.00$3,158.00$3,133.53
501-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320)FT113$13.00$20.35$14.50$15.00$20.55
51Trench, 24" deep (625E29002)FT103$20.00$17.95$22.50$22.00$18.13
52Pull box, 725.08, 24" (625E30706)EACH1$1,650.00$2,040.00$1,850.00$1,797.00$2,060.40
53Ground rod (625E32000)EACH1$300.00$481.25$335.00$327.00$486.06
54Remove and reerect existing light pole (625E35010)EACH1$2,850.00$2,017.50$3,200.00$3,103.00$2,037.68
55Light pole foundation removed (625E75500)EACH1$400.00$1,206.25$450.00$436.00$1,218.31
56Disconnect circuit, as per plan (625E75801)EACH1$346.00$592.50$390.00$376.00$598.43
57Ground mounted structural beam support, W8X18 (630E07000)FT42$65.00$65.00$73.00$71.00$68.18
58Ground mounted structural beam support, W10X12 (630E07600)FT41.30$50.00$50.00$56.00$55.00$50.50
59Ground mounted structural beam support foundation (630E84500)EACH4$1,425.00$1,425.00$1,600.00$1,552.00$1,565.50
60Removal of ground mounted sign and reerection (630E85100)EACH5$75.00$75.00$84.00$82.00$80.80
61Removal of ground mounted major sign and reerection (630E85600)EACH1$425.00$425.00$475.00$463.00$555.50
62Removal of ground mounted post support and reerection (630E86010)EACH3$110.00$110.00$125.00$120.00$101.00
63Removal of ground mounted structural beam support (630E86102)EACH4$225.00$225.00$250.00$245.00$247.45
64Law enforcement officer with patrol car for assistance (614E11110)HR40$75.00$90.00$175.00$101.00$75.75
65Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH2$2,046.68$2,050.00$2,300.00$2,229.00$2,067.15
66Work zone increased penalties sign (614E12484)EACH4$249.72$250.00$410.00$272.00$252.22
67Replacement drum (614E12600)EACH10$55.21$56.00$235.00$61.00$55.76
68Barrier reflector, type 1, one way (614E13310)EACH72$13.39$13.50$19.00$15.00$13.52
69Object marker, one way (614E13350)EACH72$20.89$21.00$24.50$23.00$21.10
70Portable changeable message sign (614E18600)SNMT6$965.04$965.00$1,750.00$1,051.00$974.69
71Work zone edge line, class I, 6", 740.06, type I (614E22210)MI1.32$9,545.72$9,550.00$10,700$10,393$9,641.17
72Work zone dotted line, class I, 6", 740.06, type I (614E24402)FT1,560$1.38$1.38$1.55$2.00$1.39
73Water (616E10000)MGAL287$5.00$1.00$10.00$68.00$27.36
74Portable barrier, unanchored (622E41100)FT3,600$21.00$14.00$78.00$44.00$49.73
75Digital speed limit (DSL) sign assembly (808E18700)SNMT24$421.68$425.00$425.00$460.00$425.90
76Premium for contract performance bond and for payment bond (103E05000)LS1$15,500$28,000$29,300$38,400$50,000
77Maintaining traffic (614E11000)LS1$35,000$21,500$50,000$56,073$56,353
78Field office, type B (619E16010)MNTH6$2,150.00$1,800.00$2,000.00$1,615.00$809.29
79Construction layout stakes and surveying (623E10000)LS1$12,400$28,000$25,000$20,386$29,018
80Mobilization (624E10000)LS1$130,500$145,000$100,000$302,000$82,491
ODOT contract 250217: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of April 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy