ODOT contract 254006 bid tabulation

ALL-SR 117-03.47/04.64 (CULVERT REPLACEMENT). Let by Ohio DOT on February 13, 2025, ALL. 4 bids received; low bid $876,165 by Advanced Excavating & Demolition LLC, -17% against the engineer's estimate of $1,060,000.

Owner
Ohio DOT
Letting
13 FEB 2025
Pay items
90
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Advanced Excavating & Demolition LLC$876,165Low-17%
2Sand Ridge Excavating$917,863+5.0%-13%
3Fenson Contracting LLC$918,215+5.0%-13%
4Crawford Construction Company Inc$1,067,676+22%+1.0%
ODOT contract 254006: bids by rank

Engineer's estimate: $1,060,000.

Bid tabulation

LinePay itemUnitQuantity1. Advanced Excavating & Demolition LLC2. Sand Ridge Excavating3. Fenson Contracting LLC4. Crawford Construction Company Inc
1Clearing and grubbing (201E11000)LS1$4,500.00$16,000$10,000$6,700.00
2Pavement removed (202E23000)SY1,382$12.00$30.00$10.75$15.00
3Pipe removed, 24" and under (202E35100)FT1,308$12.00$15.00$24.00$12.00
4Pipe removed, over 24" diameter (202E35200)FT83$90.00$100.00$60.00$63.00
5Catch basin removed (202E58100)EACH3$550.00$400.00$645.00$925.00
6Removal misc.: landscape blocks (202E98000)LS1$500.00$400.00$300.00$860.00
7Removal misc.: spencerville friends church sign (202E98100)EACH1$300.00$700.00$300.00$370.00
8Removal misc.: welcome to spencerville monument (202E98100)EACH1$300.00$1,000.00$1,000.00$1,000.00
9Excavation (203E10000)CY905$25.00$8.00$52.00$35.00
10Embankment (203E20000)CY607$20.00$15.00$10.00$30.00
11Subgrade compaction (204E10000)SY1,794$2.25$2.00$3.00$2.50
12Monument assembly, type C (623E38500)EACH1$1,800.00$2,419.75$1,850.00$2,300.00
13Monument assembly removed and reset (623E40000)EACH1$1,500.00$2,000.00$2,100.00$3,200.00
14Right-of-way monument, type B (623E40520)EACH12$350.00$3,850.00$237.00$350.00
15Preconstruction survey monument verification and report (623E50000)LS1$2,750.00$1,000.00$2,750.00$1,500.00
16Post construction survey monument verification and report (623E51000)LS1$2,750.00$1,000.00$2,750.00$1,500.00
17Special - mailbox support (690E50000)EACH2$750.00$454.25$200.00$800.00
18Special - mailbox removed and reset (690E50350)EACH2$800.00$675.00$325.00$480.00
19Rock channel protection, type B with aggregate filter (601E32110)CY91$90.00$98.10$98.00$132.00
20Rock channel protection, type B with aggregate filter, as per plan (601E32111)CY28$87.00$98.10$105.00$147.00
21Rock channel protection, type C with aggregate filter (601E32210)CY19$93.00$74.50$95.00$190.00
22Soil analysis test (659E00100)EACH2$60.00$50.00$60.00$145.00
23Topsoil (659E00300)CY573$45.00$15.00$32.00$35.00
24Seeding and mulching (659E10000)SY5,158$1.60$5.00$3.50$3.00
25Commercial fertilizer (659E20000)TON0.70$850.00$532.00$892.50$620.00
26Lime (659E31000)ACRE0.12$35.00$80.00$36.00$93.00
27Water (659E35000)MGAL28$1.00$7.00$1.00$0.30
28Slope erosion protection (670E00500)SY1,142$2.30$3.00$2.25$3.50
29Storm water pollution prevention plan (832E15000)LS1$2,425.00$862.50$2,600.00$2,900.00
30Storm water pollution prevention inspections (832E15002)LS1$6,120.00$6,382.50$3,000.00$2,400.00
31Storm water pollution prevention inspection software (832E15010)LS1$9,650.00$13,024$9,650.00$3,000.00
32Erosion control (832E30000)EACH15,000$1.00$1.00$1.00$1.00
33Concrete masonry (602E20000)CY35.70$1,100.00$380.00$1,200.00$1,400.00
34Aggregate drains (605E31100)FT127$25.00$8.00$17.00$26.00
356" conduit, type C (611E01100)FT51$30.00$16.90$31.00$35.00
366" conduit, type F (611E01500)FT10$50.00$12.75$32.00$35.00
378" conduit, type E (611E02500)FT10$60.00$15.00$39.00$43.00
388" conduit, type F (611E02600)FT272$60.00$14.00$31.00$43.00
3910" conduit, type C (611E03300)FT20$50.00$19.00$35.00$58.00
4010" conduit, type F (611E03700)FT137$60.00$15.00$33.00$58.00
4112" conduit, type B (611E04400)FT10$86.00$25.00$70.00$200.00
4212" conduit, type C (611E04600)FT194$75.00$22.00$38.00$70.00
4312" conduit, type F (611E05200)FT111$75.00$21.00$38.00$74.00
4418" conduit, type B (611E07400)FT62$90.00$36.00$48.00$140.00
4518" conduit, type C (611E07600)FT160$75.00$27.00$41.00$120.00
4666" conduit, type A, 706.02, 707.35, 707.85 or 72" (611E25000)FT84$450.00$500.00$515.00$750.00
479' X 6' conduit, type A, 706.05 (611E94940)FT60$1,250.00$1,020.50$1,100.00$1,800.00
48Catch basin, no. 2-2B (611E98470)EACH1$2,000.00$1,375.00$2,200.00$3,400.00
49Catch basin, no. 2-2B, as per plan (611E98471)EACH1$2,500.00$1,484.00$2,500.00$3,400.00
50Manhole, no. 3 (611E99574)EACH1$3,000.00$2,573.00$4,900.00$6,500.00
51Manhole, no. 3, as per plan (611E99575)EACH1$3,500.00$3,030.00$5,600.00$6,500.00
52Low strength mortar backfill (613E41200)CY259$176.00$200.00$175.00$93.00
53Pavement planing, asphalt concrete, 1.5" (254E01000)SY586$18.00$19.55$19.15$20.00
54Asphalt concrete base, PG64-22, (449) (301E56000)CY376$275.00$292.10$267.00$300.00
55Asphalt concrete base, PG64-22, (449), (driveways) (301E56100)CY7$350.00$292.10$267.00$720.00
56Aggregate base (304E20000)CY368$63.00$56.31$58.00$120.00
57Non-tracking tack coat (407E20000)GAL304$3.00$5.75$5.25$11.60
58Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY147$350.00$408.25$372.75$415.00
59Asphalt concrete surface course, type 1, (449), (driveways) (441E70500)CY2$450.00$408.25$372.75$412.00
606" non-reinforced concrete pavement, class QC 1P (452E10010)SY28$125.00$63.58$190.00$330.00
61RPM (621E00100)EACH6$850.00$776.25$650.00$772.00
62Raised pavement marker removed (621E54000)EACH6$65.00$15.00$10.00$62.00
63Ground mounted support, no. 3 post (630E03100)FT82$25.00$16.10$14.70$29.00
64Removal of ground mounted sign and disposal (630E84900)EACH2$15.00$23.00$21.00$185.00
65Removal of ground mounted sign and reerection (630E85100)EACH8$65.00$86.25$78.78$87.00
66Removal of ground mounted post support and disposal (630E86002)EACH6$20.00$23.00$21.00$24.00
67Edge line, 6", type 1 (642E00104)MI0.15$5,000.00$5,750.00$5,250.00$27,000
68Center line, type 1 (642E00300)MI0.10$10,000$11,500$10,500$31,500
69Pavement repair (253E02000)CY20$900.00$115.00$350.00$240.00
70Non-tracking tack coat (407E20000)GAL20$3.00$11.50$10.50$11.60
71Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY10$400.00$552.00$504.00$560.00
72Portable changeable message sign, as per plan (614E18601)SNMT4$1,000.00$3,450.00$1,050.00$1,750.00
73Work zone center line, class II, 642 paint (614E21500)MI0.10$9,000.00$10,350$9,450.00$10.00
74Water (616E10000)MGAL10$1.00$7.00$10.00$6.00
75Compacted aggregate (617E10100)CY50$69.00$56.51$52.00$103.00
76Structure removed (202E11000)LS1$13,500$30,000$15,000$9,000.00
77Cofferdams and excavation bracing (503E11100)LS1$12,000$20,000$20,000$10,000
78Unclassified excavation (503E21300)LS1$13,500$20,000$20,125$20,000
79Epoxy coated steel reinforcement (509E10000)LB4,984$2.75$0.81$2.55$2.70
80Class QC1 concrete, retaining/wingwall not including footing (511E46010)CY16$1,100.00$370.00$2,000.00$1,600.00
81Class QC1 concrete, footing (511E46510)CY39$600.00$350.00$500.00$811.00
82Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY50$30.00$33.00$92.00$58.00
83Type 2 waterproofing (512E33000)SY184$30.00$20.00$25.00$40.00
841" preformed expansion joint filler (516E13600)SF40$25.00$4.00$8.25$17.00
85Porous backfill with geotextile fabric (518E21230)LS1$7,000.00$4,100.00$5,500.00$5,100.00
86Premium for contract performance bond and for payment bond (103E05000)LS1$15,000$10,000$12,000$12,330
87Maintaining traffic (614E11000)LS1$10,000$15,000$20,000$7,000.00
88Field office, type B (619E16010)MNTH3$1,500.00$15,000$3,950.00$1,550.00
89Construction layout stakes and surveying (623E10000)LS1$15,000$35,000$22,000$14,200
90Mobilization (624E10000)LS1$20,000$17,325$20,000$67,312
ODOT contract 254006: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy