ODOT contract 254006 bid tabulation
ALL-SR 117-03.47/04.64 (CULVERT REPLACEMENT). Let by Ohio DOT on February 13, 2025, ALL. 4 bids received; low bid $876,165 by Advanced Excavating & Demolition LLC, -17% against the engineer's estimate of $1,060,000.
- Owner
- Ohio DOT
- Letting
- 13 FEB 2025
- Pay items
- 90
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Advanced Excavating & Demolition LLC | $876,165 | Low | -17% |
| 2 | Sand Ridge Excavating | $917,863 | +5.0% | -13% |
| 3 | Fenson Contracting LLC | $918,215 | +5.0% | -13% |
| 4 | Crawford Construction Company Inc | $1,067,676 | +22% | +1.0% |
Engineer's estimate: $1,060,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Advanced Excavating & Demolition LLC | 2. Sand Ridge Excavating | 3. Fenson Contracting LLC | 4. Crawford Construction Company Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $4,500.00 | $16,000 | $10,000 | $6,700.00 |
| 2 | Pavement removed (202E23000) | SY | 1,382 | $12.00 | $30.00 | $10.75 | $15.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 1,308 | $12.00 | $15.00 | $24.00 | $12.00 |
| 4 | Pipe removed, over 24" diameter (202E35200) | FT | 83 | $90.00 | $100.00 | $60.00 | $63.00 |
| 5 | Catch basin removed (202E58100) | EACH | 3 | $550.00 | $400.00 | $645.00 | $925.00 |
| 6 | Removal misc.: landscape blocks (202E98000) | LS | 1 | $500.00 | $400.00 | $300.00 | $860.00 |
| 7 | Removal misc.: spencerville friends church sign (202E98100) | EACH | 1 | $300.00 | $700.00 | $300.00 | $370.00 |
| 8 | Removal misc.: welcome to spencerville monument (202E98100) | EACH | 1 | $300.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 9 | Excavation (203E10000) | CY | 905 | $25.00 | $8.00 | $52.00 | $35.00 |
| 10 | Embankment (203E20000) | CY | 607 | $20.00 | $15.00 | $10.00 | $30.00 |
| 11 | Subgrade compaction (204E10000) | SY | 1,794 | $2.25 | $2.00 | $3.00 | $2.50 |
| 12 | Monument assembly, type C (623E38500) | EACH | 1 | $1,800.00 | $2,419.75 | $1,850.00 | $2,300.00 |
| 13 | Monument assembly removed and reset (623E40000) | EACH | 1 | $1,500.00 | $2,000.00 | $2,100.00 | $3,200.00 |
| 14 | Right-of-way monument, type B (623E40520) | EACH | 12 | $350.00 | $3,850.00 | $237.00 | $350.00 |
| 15 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $2,750.00 | $1,000.00 | $2,750.00 | $1,500.00 |
| 16 | Post construction survey monument verification and report (623E51000) | LS | 1 | $2,750.00 | $1,000.00 | $2,750.00 | $1,500.00 |
| 17 | Special - mailbox support (690E50000) | EACH | 2 | $750.00 | $454.25 | $200.00 | $800.00 |
| 18 | Special - mailbox removed and reset (690E50350) | EACH | 2 | $800.00 | $675.00 | $325.00 | $480.00 |
| 19 | Rock channel protection, type B with aggregate filter (601E32110) | CY | 91 | $90.00 | $98.10 | $98.00 | $132.00 |
| 20 | Rock channel protection, type B with aggregate filter, as per plan (601E32111) | CY | 28 | $87.00 | $98.10 | $105.00 | $147.00 |
| 21 | Rock channel protection, type C with aggregate filter (601E32210) | CY | 19 | $93.00 | $74.50 | $95.00 | $190.00 |
| 22 | Soil analysis test (659E00100) | EACH | 2 | $60.00 | $50.00 | $60.00 | $145.00 |
| 23 | Topsoil (659E00300) | CY | 573 | $45.00 | $15.00 | $32.00 | $35.00 |
| 24 | Seeding and mulching (659E10000) | SY | 5,158 | $1.60 | $5.00 | $3.50 | $3.00 |
| 25 | Commercial fertilizer (659E20000) | TON | 0.70 | $850.00 | $532.00 | $892.50 | $620.00 |
| 26 | Lime (659E31000) | ACRE | 0.12 | $35.00 | $80.00 | $36.00 | $93.00 |
| 27 | Water (659E35000) | MGAL | 28 | $1.00 | $7.00 | $1.00 | $0.30 |
| 28 | Slope erosion protection (670E00500) | SY | 1,142 | $2.30 | $3.00 | $2.25 | $3.50 |
| 29 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,425.00 | $862.50 | $2,600.00 | $2,900.00 |
| 30 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $6,120.00 | $6,382.50 | $3,000.00 | $2,400.00 |
| 31 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $9,650.00 | $13,024 | $9,650.00 | $3,000.00 |
| 32 | Erosion control (832E30000) | EACH | 15,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 33 | Concrete masonry (602E20000) | CY | 35.70 | $1,100.00 | $380.00 | $1,200.00 | $1,400.00 |
| 34 | Aggregate drains (605E31100) | FT | 127 | $25.00 | $8.00 | $17.00 | $26.00 |
| 35 | 6" conduit, type C (611E01100) | FT | 51 | $30.00 | $16.90 | $31.00 | $35.00 |
| 36 | 6" conduit, type F (611E01500) | FT | 10 | $50.00 | $12.75 | $32.00 | $35.00 |
| 37 | 8" conduit, type E (611E02500) | FT | 10 | $60.00 | $15.00 | $39.00 | $43.00 |
| 38 | 8" conduit, type F (611E02600) | FT | 272 | $60.00 | $14.00 | $31.00 | $43.00 |
| 39 | 10" conduit, type C (611E03300) | FT | 20 | $50.00 | $19.00 | $35.00 | $58.00 |
| 40 | 10" conduit, type F (611E03700) | FT | 137 | $60.00 | $15.00 | $33.00 | $58.00 |
| 41 | 12" conduit, type B (611E04400) | FT | 10 | $86.00 | $25.00 | $70.00 | $200.00 |
| 42 | 12" conduit, type C (611E04600) | FT | 194 | $75.00 | $22.00 | $38.00 | $70.00 |
| 43 | 12" conduit, type F (611E05200) | FT | 111 | $75.00 | $21.00 | $38.00 | $74.00 |
| 44 | 18" conduit, type B (611E07400) | FT | 62 | $90.00 | $36.00 | $48.00 | $140.00 |
| 45 | 18" conduit, type C (611E07600) | FT | 160 | $75.00 | $27.00 | $41.00 | $120.00 |
| 46 | 66" conduit, type A, 706.02, 707.35, 707.85 or 72" (611E25000) | FT | 84 | $450.00 | $500.00 | $515.00 | $750.00 |
| 47 | 9' X 6' conduit, type A, 706.05 (611E94940) | FT | 60 | $1,250.00 | $1,020.50 | $1,100.00 | $1,800.00 |
| 48 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $2,000.00 | $1,375.00 | $2,200.00 | $3,400.00 |
| 49 | Catch basin, no. 2-2B, as per plan (611E98471) | EACH | 1 | $2,500.00 | $1,484.00 | $2,500.00 | $3,400.00 |
| 50 | Manhole, no. 3 (611E99574) | EACH | 1 | $3,000.00 | $2,573.00 | $4,900.00 | $6,500.00 |
| 51 | Manhole, no. 3, as per plan (611E99575) | EACH | 1 | $3,500.00 | $3,030.00 | $5,600.00 | $6,500.00 |
| 52 | Low strength mortar backfill (613E41200) | CY | 259 | $176.00 | $200.00 | $175.00 | $93.00 |
| 53 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 586 | $18.00 | $19.55 | $19.15 | $20.00 |
| 54 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 376 | $275.00 | $292.10 | $267.00 | $300.00 |
| 55 | Asphalt concrete base, PG64-22, (449), (driveways) (301E56100) | CY | 7 | $350.00 | $292.10 | $267.00 | $720.00 |
| 56 | Aggregate base (304E20000) | CY | 368 | $63.00 | $56.31 | $58.00 | $120.00 |
| 57 | Non-tracking tack coat (407E20000) | GAL | 304 | $3.00 | $5.75 | $5.25 | $11.60 |
| 58 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 147 | $350.00 | $408.25 | $372.75 | $415.00 |
| 59 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 2 | $450.00 | $408.25 | $372.75 | $412.00 |
| 60 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 28 | $125.00 | $63.58 | $190.00 | $330.00 |
| 61 | RPM (621E00100) | EACH | 6 | $850.00 | $776.25 | $650.00 | $772.00 |
| 62 | Raised pavement marker removed (621E54000) | EACH | 6 | $65.00 | $15.00 | $10.00 | $62.00 |
| 63 | Ground mounted support, no. 3 post (630E03100) | FT | 82 | $25.00 | $16.10 | $14.70 | $29.00 |
| 64 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $15.00 | $23.00 | $21.00 | $185.00 |
| 65 | Removal of ground mounted sign and reerection (630E85100) | EACH | 8 | $65.00 | $86.25 | $78.78 | $87.00 |
| 66 | Removal of ground mounted post support and disposal (630E86002) | EACH | 6 | $20.00 | $23.00 | $21.00 | $24.00 |
| 67 | Edge line, 6", type 1 (642E00104) | MI | 0.15 | $5,000.00 | $5,750.00 | $5,250.00 | $27,000 |
| 68 | Center line, type 1 (642E00300) | MI | 0.10 | $10,000 | $11,500 | $10,500 | $31,500 |
| 69 | Pavement repair (253E02000) | CY | 20 | $900.00 | $115.00 | $350.00 | $240.00 |
| 70 | Non-tracking tack coat (407E20000) | GAL | 20 | $3.00 | $11.50 | $10.50 | $11.60 |
| 71 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 10 | $400.00 | $552.00 | $504.00 | $560.00 |
| 72 | Portable changeable message sign, as per plan (614E18601) | SNMT | 4 | $1,000.00 | $3,450.00 | $1,050.00 | $1,750.00 |
| 73 | Work zone center line, class II, 642 paint (614E21500) | MI | 0.10 | $9,000.00 | $10,350 | $9,450.00 | $10.00 |
| 74 | Water (616E10000) | MGAL | 10 | $1.00 | $7.00 | $10.00 | $6.00 |
| 75 | Compacted aggregate (617E10100) | CY | 50 | $69.00 | $56.51 | $52.00 | $103.00 |
| 76 | Structure removed (202E11000) | LS | 1 | $13,500 | $30,000 | $15,000 | $9,000.00 |
| 77 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $12,000 | $20,000 | $20,000 | $10,000 |
| 78 | Unclassified excavation (503E21300) | LS | 1 | $13,500 | $20,000 | $20,125 | $20,000 |
| 79 | Epoxy coated steel reinforcement (509E10000) | LB | 4,984 | $2.75 | $0.81 | $2.55 | $2.70 |
| 80 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 16 | $1,100.00 | $370.00 | $2,000.00 | $1,600.00 |
| 81 | Class QC1 concrete, footing (511E46510) | CY | 39 | $600.00 | $350.00 | $500.00 | $811.00 |
| 82 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 50 | $30.00 | $33.00 | $92.00 | $58.00 |
| 83 | Type 2 waterproofing (512E33000) | SY | 184 | $30.00 | $20.00 | $25.00 | $40.00 |
| 84 | 1" preformed expansion joint filler (516E13600) | SF | 40 | $25.00 | $4.00 | $8.25 | $17.00 |
| 85 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $7,000.00 | $4,100.00 | $5,500.00 | $5,100.00 |
| 86 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,000 | $10,000 | $12,000 | $12,330 |
| 87 | Maintaining traffic (614E11000) | LS | 1 | $10,000 | $15,000 | $20,000 | $7,000.00 |
| 88 | Field office, type B (619E16010) | MNTH | 3 | $1,500.00 | $15,000 | $3,950.00 | $1,550.00 |
| 89 | Construction layout stakes and surveying (623E10000) | LS | 1 | $15,000 | $35,000 | $22,000 | $14,200 |
| 90 | Mobilization (624E10000) | LS | 1 | $20,000 | $17,325 | $20,000 | $67,312 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.