ODOT contract 260451 bid tabulation
WYA-Killdeer Plains WLF (PARKING AREAS). Let by Ohio DOT on October 1, 2026, WYA. 8 bids received; low bid $327,079 by Advanced Excavating & Demolition LLC, -15% against the engineer's estimate of $383,000.
- Owner
- Ohio DOT
- Letting
- 01 OCT 2026
- Pay items
- 21
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Advanced Excavating & Demolition LLC | $327,079 | Low | -15% |
| 2 | Great Lakes Demolition Company | $347,930 | +6.0% | -9.0% |
| 3 | Park Enterprise Construction Co Inc | $383,293 | +17% | 0.0% |
| 4 | Grassbaugh LLC | $391,331 | +20% | +2.0% |
| 5 | D2 Excavating LLC | $392,500 | +20% | +2.0% |
| 6 | Buckeye Excavating & Construction Inc | $417,317 | +28% | +9.0% |
| 7 | Crawford Construction Company Inc | $438,607 | +34% | +15% |
| 8 | Kokosing Construction Company Inc | $443,772 | +36% | +16% |
Engineer's estimate: $383,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Advanced Excavating & Demolition LLC | 2. Great Lakes Demolition Company | 3. Park Enterprise Construction Co Inc | 4. Grassbaugh LLC | 5. D2 Excavating LLC | 6. Buckeye Excavating & Construction Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Excavation, as per plan (203E10001) | CY | 2,228 | $19.00 | $31.00 | $45.00 | $36.00 | $34.00 | $32.00 |
| 2 | Embankment (203E20000) | CY | 714 | $27.00 | $20.00 | $46.00 | $36.00 | $22.00 | $30.00 |
| 3 | Subgrade compaction (204E10000) | SY | 3,674 | $1.25 | $1.00 | $2.00 | $2.00 | $4.25 | $1.50 |
| 4 | Soil analysis test (659E00100) | EACH | 2 | $40.00 | $200.00 | $100.00 | $150.00 | $500.00 | $200.00 |
| 5 | Topsoil (659E00300) | CY | 489 | $75.00 | $30.00 | $60.00 | $80.00 | $48.00 | $70.00 |
| 6 | Seeding and mulching (659E10000) | SY | 4,392 | $1.15 | $2.00 | $2.00 | $2.00 | $1.40 | $4.00 |
| 7 | Repair seeding and mulching (659E14000) | SY | 220 | $1.15 | $1.00 | $2.00 | $1.50 | $2.00 | $1.50 |
| 8 | Inter-seeding (659E15000) | SY | 220 | $0.45 | $1.00 | $2.00 | $1.50 | $1.50 | $1.50 |
| 9 | Commercial fertilizer (659E20000) | TON | 0.59 | $700.00 | $800.00 | $822.03 | $1,500.00 | $1,000.00 | $500.00 |
| 10 | Lime (659E31000) | ACRE | 0.91 | $0.51 | $500.00 | $900.00 | $800.00 | $800.00 | $800.00 |
| 11 | Water (659E35000) | MGAL | 13 | $0.10 | $1.00 | $1.00 | $1.00 | $100.00 | $60.00 |
| 12 | Erosion control, as per plan (832E30001) | EACH | 20,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 13 | Full depth pavement sawing (252E01500) | FT | 200 | $4.75 | $2.00 | $5.00 | $3.00 | $8.00 | $5.00 |
| 14 | Aggregate base (304E20000) | CY | 613 | $75.00 | $70.00 | $62.00 | $78.00 | $83.00 | $90.00 |
| 15 | Tack coat (407E10000) | GAL | 183 | $3.00 | $4.00 | $8.00 | $3.10 | $4.25 | $3.00 |
| 16 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 154 | $325.00 | $353.00 | $325.00 | $320.85 | $390.00 | $375.00 |
| 17 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 256 | $255.00 | $320.00 | $275.00 | $289.80 | $328.00 | $310.00 |
| 18 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $10,000 | $3,500.00 | $5,000.00 | $7,500.00 | $5,150.00 | $5,600.00 |
| 19 | Maintaining traffic (614E11000) | LS | 1 | $5,000.00 | $2,000.00 | $3,200.00 | $7,500.00 | $8,000.00 | $4,000.00 |
| 20 | Construction layout stakes and surveying (623E10000) | LS | 1 | $5,500.00 | $6,500.00 | $3,200.00 | $7,500.00 | $3,500.00 | $3,000.00 |
| 21 | Mobilization (624E10000) | LS | 1 | $15,000 | $23,350 | $10,000 | $12,500 | $17,482 | $38,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 1, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.