ODOT contract 250112 bid tabulation
WOO-IR 75-08.58 Weigh Station (PARKING AREAS). Let by Ohio DOT on February 13, 2025, WOO. 4 bids received; low bid $693,840 by Geddis Paving & Excavating Inc, -28% against the engineer's estimate of $963,000.
- Owner
- Ohio DOT
- Letting
- 13 FEB 2025
- Pay items
- 77
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Geddis Paving & Excavating Inc | $693,840 | Low | -28% |
| 2 | Great Lakes Demolition Company | $694,981 | 0.0% | -28% |
| 3 | Advanced Excavating & Demolition LLC | $742,651 | +7.0% | -23% |
| 4 | Ebony Construction Co | $769,385 | +11% | -20% |
Engineer's estimate: $963,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Geddis Paving & Excavating Inc | 2. Great Lakes Demolition Company | 3. Advanced Excavating & Demolition LLC | 4. Ebony Construction Co |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $1,000.00 | $100.00 | $5,000.00 | $21,000 |
| 2 | Pavement removed (202E23000) | SY | 483 | $30.00 | $20.00 | $17.00 | $26.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 72 | $60.00 | $20.00 | $12.00 | $44.00 |
| 4 | Catch basin removed (202E58100) | EACH | 1 | $500.00 | $450.00 | $650.00 | $518.00 |
| 5 | Special - fill and plug existing conduit (202E70000) | FT | 45 | $60.00 | $25.00 | $35.00 | $74.50 |
| 6 | Excavation, as per plan (203E10001) | CY | 635 | $15.00 | $20.00 | $24.00 | $18.50 |
| 7 | Embankment (203E20000) | CY | 14 | $15.00 | $20.00 | $25.00 | $25.00 |
| 8 | Granular material, type B (203E35110) | CY | 555 | $52.00 | $60.00 | $64.00 | $58.00 |
| 9 | Granular material, type D (203E35130) | CY | 443 | $45.50 | $60.00 | $60.00 | $57.00 |
| 10 | Excavation of subgrade, as per plan (204E13001) | CY | 997 | $16.00 | $20.00 | $18.00 | $21.50 |
| 11 | Linear grading (209E60200) | STA | 21 | $115.00 | $150.00 | $90.00 | $465.00 |
| 12 | Topsoil stockpiled (651E10000) | CY | 220 | $5.00 | $15.00 | $27.00 | $25.35 |
| 13 | Placing stockpiled topsoil (652E10000) | CY | 220 | $9.00 | $20.00 | $27.00 | $51.75 |
| 14 | Special - soil sterilant (203E01890) | SY | 6,000 | $0.35 | $0.80 | $0.55 | $0.75 |
| 15 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 2 | $755.00 | $80.00 | $180.00 | $143.00 |
| 16 | Soil analysis test (659E00100) | EACH | 2 | $67.00 | $200.00 | $60.00 | $61.00 |
| 17 | Topsoil (659E00300) | CY | 350 | $55.00 | $50.00 | $85.00 | $85.00 |
| 18 | Seeding and mulching (659E10000) | SY | 5,115 | $0.95 | $2.50 | $0.92 | $0.95 |
| 19 | Commercial fertilizer (659E20000) | TON | 0.70 | $950.00 | $800.00 | $850.00 | $852.50 |
| 20 | Lime (659E31000) | ACRE | 1.10 | $39.00 | $50.00 | $35.00 | $35.11 |
| 21 | Water (659E35000) | MGAL | 27.60 | $1.00 | $1.00 | $1.00 | $1.00 |
| 22 | Erosion control (832E30000) | EACH | 32,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | 6" unclassified pipe underdrains (605E13300) | FT | 62 | $45.00 | $15.00 | $36.00 | $14.00 |
| 24 | 6" conduit, type F (611E01500) | FT | 28 | $45.00 | $15.00 | $40.00 | $16.50 |
| 25 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $1,300.00 | $250.00 | $800.00 | $597.00 |
| 26 | Pavement repair (253E01000) | SY | 54 | $86.00 | $85.00 | $105.00 | $85.00 |
| 27 | Pavement planing, asphalt concrete, 3.25" (254E01000) | SY | 2,123 | $6.00 | $7.00 | $7.00 | $3.50 |
| 28 | Aggregate base (304E20000) | CY | 334 | $61.00 | $60.00 | $73.00 | $89.00 |
| 29 | Tack coat (407E10000) | GAL | 298 | $3.00 | $4.00 | $3.00 | $2.75 |
| 30 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 89 | $265.00 | $350.00 | $310.00 | $490.00 |
| 31 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300) | CY | 104 | $265.00 | $325.00 | $310.00 | $440.00 |
| 32 | 12" non-reinforced concrete pavement, class QC 1P (452E15010) | SY | 1,995 | $115.00 | $82.00 | $103.00 | $100.00 |
| 33 | Compacted aggregate (617E10100) | CY | 38 | $76.50 | $75.00 | $90.00 | $130.00 |
| 34 | Connection, fused pull apart (625E00450) | EACH | 12 | $188.00 | $125.00 | $164.00 | $195.00 |
| 35 | Connection, unfused pull apart (625E00460) | EACH | 21 | $188.00 | $125.00 | $158.25 | $195.00 |
| 36 | Light pole, conventional, design A20B32.5 (625E10490) | EACH | 6 | $2,924.00 | $3,000.00 | $3,397.00 | $3,000.00 |
| 37 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 6 | $1,750.00 | $1,500.00 | $2,046.25 | $1,800.00 |
| 38 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 258 | $4.00 | $4.00 | $5.00 | $4.00 |
| 39 | No. 12 AWG pole and bracket cable (625E23410) | FT | 990 | $1.50 | $2.00 | $2.25 | $1.55 |
| 40 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 902 | $14.50 | $17.00 | $17.25 | $18.00 |
| 41 | Conduit, 3", 725.04 (625E25500) | FT | 18 | $14.50 | $25.00 | $33.00 | $14.50 |
| 42 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 48 | $91.00 | $60.00 | $69.50 | $95.00 |
| 43 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 6 | $528.00 | $450.00 | $512.75 | $550.00 |
| 44 | Trench, 24" deep (625E29002) | FT | 902 | $8.25 | $10.00 | $11.00 | $8.35 |
| 45 | Pull box, 725.08, 18" (625E30700) | EACH | 3 | $1,550.00 | $950.00 | $1,325.00 | $1,600.00 |
| 46 | Ground rod (625E32000) | EACH | 7 | $475.00 | $250.00 | $326.25 | $490.00 |
| 47 | Power service, as per plan (625E34001) | EACH | 1 | $3,246.00 | $7,500.00 | $7,500.00 | $3,450.00 |
| 48 | Underground warning marking tape (625E36010) | FT | 920 | $2.50 | $2.00 | $2.00 | $2.30 |
| 49 | Luminaire support removed (625E75520) | EACH | 9 | $308.00 | $300.00 | $587.00 | $320.00 |
| 50 | Luminaire support foundation removed (625E75522) | EACH | 9 | $617.00 | $450.00 | $807.50 | $650.00 |
| 51 | Distribution cable removed (625E75550) | FT | 6 | $308.00 | $2.00 | $7.00 | $320.00 |
| 52 | RPM (621E00100) | EACH | 12 | $360.00 | $370.00 | $400.00 | $78.00 |
| 53 | Raised pavement marker removed (621E54000) | EACH | 12 | $42.00 | $60.00 | $40.00 | $20.00 |
| 54 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 388 | $17.00 | $15.00 | $15.00 | $30.00 |
| 55 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 84 | $53.00 | $48.00 | $47.50 | $31.00 |
| 56 | Ground mounted wooden box beam support, type M beam (630E08302) | FT | 18 | $130.00 | $115.00 | $115.00 | $260.00 |
| 57 | Sign post reflector (630E08600) | EACH | 4 | $50.50 | $45.00 | $45.00 | $26.00 |
| 58 | Breakaway structural beam connection (630E09000) | EACH | 4 | $945.00 | $820.00 | $820.00 | $452.00 |
| 59 | Sign, flat sheet (630E80100) | SF | 142 | $19.50 | $18.00 | $17.50 | $31.00 |
| 60 | Sign, ground mounted extrusheet (630E80200) | SF | 180 | $26.50 | $24.00 | $23.50 | $21.00 |
| 61 | Ground mounted structural beam support foundation (630E84500) | EACH | 4 | $1,550.00 | $1,500.00 | $1,120.00 | $925.00 |
| 62 | Removal of ground mounted sign and disposal (630E84900) | EACH | 8 | $11.00 | $10.00 | $10.00 | $285.00 |
| 63 | Removal of ground mounted post support and disposal (630E86002) | EACH | 13 | $22.50 | $20.00 | $20.00 | $290.00 |
| 64 | Edge line, 6" (646E10010) | MI | 0.22 | $14,000 | $15,000 | $15,000 | $15,500 |
| 65 | Edge line, 6" (646E10010) | MI | 0.24 | $14,000 | $15,000 | $15,000 | $15,500 |
| 66 | Channelizing line, 12" (646E10310) | FT | 257 | $5.05 | $2.00 | $2.00 | $2.10 |
| 67 | Transverse/diagonal line (646E10600) | FT | 278 | $13.50 | $10.00 | $10.00 | $10.50 |
| 68 | Parking lot stall marking (646E20200) | FT | 1,846 | $4.95 | $3.00 | $3.00 | $3.10 |
| 69 | Wrong way arrow (646E20320) | EACH | 2 | $280.00 | $500.00 | $500.00 | $510.00 |
| 70 | Removal of pavement marking (646E50000) | EACH | 8 | $95.00 | $50.00 | $50.00 | $52.00 |
| 71 | Removal of pavement marking (646E50100) | FT | 1,472 | $1.70 | $2.50 | $2.50 | $3.00 |
| 72 | Replacement sign (614E12500) | EACH | 5 | $130.00 | $200.00 | $192.00 | $195.00 |
| 73 | Replacement drum (614E12600) | EACH | 5 | $75.00 | $60.00 | $56.00 | $57.25 |
| 74 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,000.00 | $8,500.00 | $16,000 | $10,500 |
| 75 | Maintaining traffic (614E11000) | LS | 1 | $15,000 | $10,500 | $15,000 | $7,400.00 |
| 76 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $6,500.00 | $15,000 | $5,200.00 |
| 77 | Mobilization (624E10000) | LS | 1 | $20,000 | $70,000 | $25,000 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.