AUG-US 33 Rest Areas TP (PARKING AREAS). Let by Ohio DOT on October 1, 2026, AUG. 5 bids received; low bid $6,473,049 by Helms and Sons Excavating, -0.3% against the engineer's estimate of $6,492,000.

Owner
Ohio DOT
Letting
01 OCT 2026
Pay items
113
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Helms and Sons Excavating$6,473,049Low0.0%
2Eagle Bridge Co$6,610,153+2.0%+2.0%
3R D Jones Excavating Inc$6,831,811+6.0%+5.0%
4R B Jergens Contractors Inc$7,145,700+10%+10%
5Integrity Contractors LLC$7,623,387+18%+17%
ODOT contract 260440: bids by rank

Engineer's estimate: $6,492,000.

Bid tabulation

LinePay itemUnitQuantity1. Helms and Sons Excavating2. Eagle Bridge Co3. R D Jones Excavating Inc4. R B Jergens Contractors Inc5. Integrity Contractors LLC
1Clearing and grubbing (201E11000)LS1$85,000$25,000$25,850$29,401$44,723
2Headwall removed (202E20010)EACH2$350.00$300.00$500.00$727.72$2,205.42
3Pavement removed (202E23000)SY22,357$11.00$12.00$6.45$11.18$10.27
4Curb removed (202E32000)FT1,595$5.00$3.50$5.00$25.65$12.54
5Pipe removed, 24" and under (202E35100)FT840$10.00$12.00$16.50$21.83$29.81
6Removal misc.: slotted drain (202E98200)FT483$25.00$35.00$10.50$10.75$20.45
7Excavation (203E10000)CY12,512$9.00$20.00$15.25$16.73$24.11
8Embankment (203E20000)CY8,253$9.00$10.00$3.75$11.89$22.96
9Subgrade compaction (204E10000)SY261$10.00$7.00$4.50$4.78$3.28
10Proof rolling (204E45000)HR15$120.00$300.00$175.00$315.38$261.37
11Lime stabilized subgrade, 12 inches deep (206E10010)SY41,806$5.25$6.25$6.28$5.56$4.96
12Lime (206E10300)TON1,085$215.00$215.00$225.00$227.66$250.86
13Curing coat (206E11000)SY41,806$1.25$1.25$1.35$1.32$1.46
14Mixture design for chemically stabilized soils (206E30000)LS1$16,500$20,000$16,500$17,471$19,252
15Fence, misc.: wooden slat fence (607E98000)FT116$210.00$210.00$130.00$105.50$159.35
16Preconstruction survey monument verification and report (623E50000)LS1$3,500.00$4,000.00$3,780.00$1,994.00$37,054
17Post construction survey monument verification and report (623E51000)LS1$3,500.00$4,000.00$3,780.00$1,994.00$3,970.05
18Special - bollard (690E50600)EACH10$1,250.00$1,025.00$950.00$501.14$596.13
19Tied concrete block mat with type 1 underlayment (601E21050)SY547$95.00$80.00$69.15$91.25$104.15
20Topsoil (659E00300)CY5,322$15.00$7.00$18.50$44.05$72.52
21Seeding and mulching (659E10000)SY43,134$1.00$1.25$1.50$0.97$1.18
22Repair seeding and mulching (659E14000)SY2,160$1.00$1.50$1.50$0.79$0.86
23Inter-seeding (659E15000)SY2,160$0.60$0.50$1.50$0.01$0.86
24Commercial fertilizer (659E20000)TON6.10$850.00$1,500.00$1,200.00$1,582.54$787.71
25Lime (659E31000)ACRE9$35.00$1.00$925.00$211.01$10.50
26Water (659E35000)MGAL245$1.00$8.00$10.00$1.06$1.05
27Slope erosion protection (670E00500)SY4,773$2.00$2.50$4.00$2.48$1.94
28Storm water pollution prevention plan (832E15000)LS1$1,500.00$4,000.00$3,250.00$3,270.59$3,255.86
29Storm water pollution prevention inspections (832E15002)LS1$15,000$15,000$14,980$10,550$10,503
30Storm water pollution prevention inspection software (832E15010)LS1$15,000$15,000$1,500.00$14,770$14,704
31Erosion control (832E30000)EACH50,000$1.00$1.00$1.00$1.00$1.00
32Concrete masonry (602E20000)CY4$3,000.00$2,750.00$2,000.00$2,021.30$1,913.32
336" shallow pipe underdrains (605E11100)FT18,856$14.00$10.50$20.00$11.53$11.38
346" unclassified pipe underdrains (605E13300)FT124$14.00$15.00$21.10$33.29$16.21
356" conduit, type F for underdrain outlets (611E00510)FT1,051$18.00$25.00$23.45$27.28$17.38
366" conduit, type B (611E00900)FT8$75.00$120.00$35.00$102.96$17.72
376" conduit, type C (611E01100)FT500$14.00$6.00$21.10$22.76$15.62
3812" conduit, type B (611E04400)FT400$95.00$75.00$75.45$70.82$99.41
3915" conduit, type B (611E05900)FT75$120.00$85.00$82.65$95.51$105.79
4018" conduit, type B (611E07400)FT100$145.00$100.00$90.65$111.86$116.62
4121" conduit, type B (611E08900)FT200$150.00$120.00$109.85$132.02$120.29
4219" X 30" conduit, type B, 706.04 (611E52302)FT851$188.00$175.00$185.85$199.04$208.32
4322" X 34" conduit, type A, 706.04 (611E52400)FT132$205.00$220.00$218.65$177.82$223.99
4422" X 34" conduit, type B, 706.04 (611E52402)FT909$205.00$215.00$214.75$185.56$200.46
45Catch basin, no. 6, as per plan (611E98371)EACH26$2,750.00$3,100.00$2,850.00$2,072.27$3,372.06
46Catch basin reconstructed to grade (611E98634)EACH1$1,500.00$1,000.00$2,550.00$1,317.97$2,830.10
47Manhole, no. 3 (611E99574)EACH2$10,000$10,000$10,250$13,442$9,176.05
48Precast reinforced concrete outlet (611E99710)EACH5$350.00$400.00$650.00$501.32$958.80
49Drainage structure, misc.: curb cut (611E99900)EACH71$700.00$375.00$500.00$723.97$949.23
50Full depth pavement sawing (255E20000)FT878$3.00$3.00$3.15$4.92$2.31
51Asphalt concrete base, PG64-22, (449) (301E56000)CY6,293$208.00$197.00$213.00$208.74$207.80
52Aggregate base (304E20000)CY6,547$56.00$48.00$38.00$65.31$65.36
53Non-tracking tack coat (407E20000)GAL4,519$3.00$3.00$3.25$3.18$3.16
54Stabilized crushed aggregate (411E10000)CY134$90.00$150.00$56.75$78.67$75.35
55Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000)CY1,568$275.00$289.00$300.00$306.22$304.84
56Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100)CY2,610$230.00$232.00$244.00$245.83$244.72
578" non-reinforced concrete pavement, class QC 1P (452E12010)SY209$95.00$90.00$146.75$95.23$155.34
58Curb, type 7 (609E28000)FT6,156$25.00$22.00$34.50$20.91$24.16
594" concrete median (609E70000)SY762$85.00$50.00$111.75$10.30$99.93
60Connection, fused pull apart (625E00450)EACH46$142.00$200.00$137.00$236.59$236.80
61Connection, unfused permanent (625E00480)EACH39$135.00$200.00$137.00$224.46$224.65
62Light pole, conventional, AT20B40 (625E10490)EACH23$5,225.00$5,000.00$5,380.00$5,665.51$5,670.44
63Light tower, misc.: light tower, BB45 (625E13500)EACH10$24,000$20,000$25,025$22,926$22,946
64Light pole foundation, 24" X 8' deep (625E14100)EACH23$1,700.00$2,500.00$2,945.00$2,537.34$2,539.55
65Light tower foundation, misc.: 36" X 10' deep (625E15700)EACH10$6,200.00$7,700.00$6,515.00$11,410$11,420
66No. 4 AWG 2400 volt distribution cable (625E23200)FT3,324$4.25$5.00$6.30$5.64$5.65
67No. 10 AWG pole and bracket cable (625E23400)FT4,830$2.00$2.00$3.15$2.48$2.48
681-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320)FT9,773$14.50$17.00$16.25$16.51$16.53
69Conduit, 3", 725.04 (625E25500)FT600$47.00$28.00$40.00$37.19$37.22
70Conduit, 3", 725.051 (625E25504)FT294$10.00$7.00$19.00$10.29$10.30
71Conduit, jacked or drilled, 725.04, 3" (625E25902)FT124$82.00$65.00$71.50$131.88$131.99
72Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH7$525.00$425.00$550.00$570.77$571.27
73Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH6$525.00$425.00$550.00$570.77$571.27
74Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH10$580.00$470.00$600.00$630.91$631.46
75Luminaire, high mast, solid state (LED), as per plan (625E26263)EACH20$1,400.00$1,250.00$1,500.00$1,358.88$1,360.06
76Trench (625E29000)FT9,959$8.00$6.00$16.25$16.35$16.37
77Pull box, 725.08, 18" (625E30700)EACH21$1,115.00$1,500.00$1,400.00$1,139.43$1,140.42
78Ground rod (625E32000)EACH43$390.00$300.00$400.00$313.87$314.14
79Power service, as per plan (625E34001)EACH2$13,500$15,500$17,500$26,376$26,399
80Underground warning marking tape (625E36010)FT9,964$0.25$1.50$4.15$4.33$4.33
81Light pole removed (625E75400)EACH27$500.00$500.00$500.00$290.13$290.39
82Light pole foundation removed (625E75500)EACH27$455.00$500.00$325.00$611.92$612.45
83Luminaire removed (625E75506)EACH27$110.00$75.00$85.00$145.59$145.72
84Arc flash calculations and label, at control cente (625E76000)EACH2$3,675.00$4,000.00$3,700.00$2,954.08$2,956.65
85Ground mounted support, no. 3 post (630E03100)FT690$17.00$17.00$19.00$16.88$16.90
86Ground mounted structural beam support, W6X9 (630E06500)FT35$45.00$45.00$49.00$42.20$42.24
87Ground mounted structural beam support, W8X18 (630E07000)FT44$75.00$73.00$76.00$65.41$65.47
88Sign post reflector (630E08600)EACH20$45.00$45.00$50.00$48.80$59.12
89Breakaway structural beam connection (630E09000)EACH4$790.00$785.00$800.00$685.77$830.90
90Sign, flat sheet (630E80100)SF268$20.00$19.50$23.00$26.51$32.12
91Sign, ground mounted extrusheet (630E80200)SF141$28.00$27.00$30.00$40.19$48.69
92Sign backing assembly (630E82000)EACH4$330.00$330.00$350.00$290.13$351.53
93Ground mounted structural beam support foundation (630E84500)EACH4$1,500.00$1,475.00$1,600.00$1,846.30$2,237.04
94Removal of ground mounted sign and disposal (630E84900)EACH16$15.00$15.00$20.00$26.38$31.96
95Removal of ground mounted sign and reerection (630E85100)EACH4$75.00$75.00$80.00$131.88$159.79
96Removal of ground mounted major sign and disposal (630E85400)EACH2$250.00$240.00$265.00$158.25$191.75
97Removal of ground mounted post support and disposal (630E86002)EACH31$20.00$20.00$25.00$31.65$38.35
98Removal of ground mounted structural beam support (630E86102)EACH4$300.00$285.00$300.00$369.26$447.41
99Removal of pole mounted sign and reerection (630E87520)EACH3$200.00$195.00$215.00$131.88$159.79
100Edge line, 6" (644E00104)MI2$4,050.00$4,010.00$4,400.00$4,230.67$8,502.64
101Channelizing line, 12" (644E00404)FT506$1.75$1.70$2.00$1.79$3.19
102Stop line (644E00500)FT71$9.00$9.00$9.50$9.50$10.63
103Transverse/diagonal line (644E00700)FT332$9.25$9.00$9.50$9.50$10.63
104Parking lot stall marking (644E01200)FT7,846$2.00$1.85$2.00$1.95$2.13
105Lane arrow (644E01300)EACH24$110.00$100.00$125.00$105.50$159.42
106Handicap symbol marking (644E01600)EACH4$300.00$300.00$325.00$316.51$265.71
107Law enforcement officer with patrol car for assistance (614E11110)HR80$100.00$75.00$250.00$158.25$180.25
108Water (616E10000)MGAL76$10.00$20.00$15.00$148.81$3.83
109Premium for contract performance bond and for payment bond (103E05000)LS1$40,000$90,000$35,250$25,321$69,318
110Maintaining traffic (614E11000)LS1$30,000$10,000$30,000$85,223$16,279
111Field office, type C (619E16020)MNTH6$1,000.00$3,500.00$7,000.00$2,637.57$4,936.30
112Construction layout stakes and surveying (623E10000)LS1$40,000$25,000$50,000$37,221$3,970.05
113Mobilization (624E10000)LS1$90,000$300,000$55,500$172,065$150,525
ODOT contract 260440: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of October 1, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy