ODOT contract 260422 bid tabulation
D03-BH FY2027 (A) (BRIDGE REPAIR). Let by Ohio DOT on October 1, 2026, District 3. 5 bids received; low bid $715,231 by BCC Ohio Inc, -8.3% against the engineer's estimate of $780,000.
- Owner
- Ohio DOT
- Letting
- 01 OCT 2026
- Pay items
- 52
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | BCC Ohio Inc | $715,231 | Low | -8.0% |
| 2 | Ohio Concrete Maintenance LLC | $758,972 | +6.0% | -3.0% |
| 3 | Catts Construction Inc | $935,076 | +31% | +20% |
| 4 | Ram Construction Services of Michigan, Inc | $1,137,063 | +59% | +46% |
| 5 | S E T Inc | $1,186,695 | +66% | +52% |
Engineer's estimate: $780,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. BCC Ohio Inc | 2. Ohio Concrete Maintenance LLC | 3. Catts Construction Inc | 4. Ram Construction Services of Michigan, Inc | 5. S E T Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Erosion control (832E30000) | EACH | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 2 | Raised pavement marker removed, as per plan (621E54001) | EACH | 18 | $19.42 | $50.00 | $44.00 | $120.00 | $135.00 |
| 3 | Edge line, 6" (646E10010) | MI | 1.05 | $13,409 | $14,500 | $15,297 | $12,770 | $13,500 |
| 4 | Edge line, 6" (646E10010) | MI | 1.05 | $13,409 | $14,500 | $15,297 | $12,770 | $13,500 |
| 5 | Lane line, 6" (646E10110) | MI | 1.52 | $5,339.25 | $5,600.00 | $6,091.00 | $5,085.00 | $5,400.00 |
| 6 | Channelizing line, 12" (646E10310) | FT | 995 | $4.15 | $4.50 | $4.75 | $3.95 | $4.15 |
| 7 | Transverse/diagonal line (646E10600) | FT | 31 | $18.64 | $20.00 | $21.00 | $17.75 | $18.75 |
| 8 | Removal of pavement marking (646E50100) | FT | 1,026 | $2.07 | $5.00 | $23.00 | $3.00 | $4.75 |
| 9 | Removal of pavement marking (646E50300) | MI | 3.62 | $4,561.33 | $15,000 | $6,618.00 | $13,425 | $5,800.00 |
| 10 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 960 | $91.35 | $90.00 | $27.00 | $60.00 | $95.00 |
| 11 | Detour signing (614E12420) | LS | 1 | $29,112 | $42,000 | $33,214 | $27,726 | $50,000 |
| 12 | Work zone increased penalties sign (614E12484) | EACH | 54 | $264.02 | $225.00 | $301.00 | $251.50 | $265.00 |
| 13 | Portable changeable message sign (614E18600) | SNMT | 8 | $1,291.22 | $1,150.00 | $1,473.00 | $1,230.00 | $2,500.00 |
| 14 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 1.52 | $9,308.25 | $2,500.00 | $10,619 | $8,865.00 | $9,750.00 |
| 15 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 1.05 | $14,868 | $4,200.00 | $16,962 | $14,160 | $15,500 |
| 16 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 1.05 | $14,868 | $4,200.00 | $16,962 | $14,160 | $15,500 |
| 17 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 995 | $1.05 | $4.00 | $1.00 | $1.00 | $1.10 |
| 18 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 626 | $9.57 | $10.00 | $10.00 | $14.25 | $10.00 |
| 19 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 819 | $9.57 | $10.00 | $10.00 | $14.25 | $10.00 |
| 20 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 957 | $9.57 | $10.00 | $10.00 | $14.25 | $10.00 |
| 21 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,938 | $14.73 | $9.00 | $10.00 | $14.25 | $10.50 |
| 22 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 3,848 | $14.73 | $10.00 | $10.00 | $14.25 | $12.00 |
| 23 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 473 | $9.57 | $11.00 | $10.00 | $14.25 | $16.00 |
| 24 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 473 | $9.57 | $11.00 | $10.00 | $14.25 | $16.00 |
| 25 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 516 | $14.73 | $10.00 | $10.00 | $14.25 | $11.25 |
| 26 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 516 | $14.73 | $10.00 | $10.00 | $14.25 | $11.25 |
| 27 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 435 | $9.57 | $11.00 | $10.00 | $14.25 | $13.00 |
| 28 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 379 | $9.57 | $11.00 | $10.00 | $14.25 | $12.50 |
| 29 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,316 | $9.57 | $9.00 | $10.00 | $14.25 | $11.50 |
| 30 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,316 | $9.57 | $9.00 | $10.00 | $14.25 | $11.50 |
| 31 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,714 | $14.73 | $9.00 | $10.00 | $14.25 | $10.25 |
| 32 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,714 | $14.73 | $10.00 | $10.00 | $14.25 | $14.50 |
| 33 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 664 | $9.57 | $10.00 | $10.00 | $14.25 | $10.25 |
| 34 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 663 | $9.57 | $11.00 | $10.00 | $14.25 | $14.25 |
| 35 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,183 | $14.73 | $11.00 | $10.00 | $14.25 | $15.25 |
| 36 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 656 | $9.57 | $10.00 | $10.00 | $14.25 | $10.00 |
| 37 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 656 | $9.57 | $10.00 | $10.00 | $14.25 | $10.00 |
| 38 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 674 | $9.57 | $10.00 | $10.00 | $14.25 | $11.00 |
| 39 | Removal misc.: joint sealer (202E98200) | FT | 16 | $38.70 | $75.00 | $34.00 | $10.00 | $10.50 |
| 40 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 675 | $9.57 | $10.00 | $10.00 | $14.25 | $11.00 |
| 41 | Special - sawing and sealing concrete joints (516E31250) | FT | 16 | $41.52 | $110.00 | $62.00 | $70.00 | $25.00 |
| 42 | Patching concrete bridge deck - type B (519E12300) | SY | 7.60 | $908.70 | $500.00 | $1,020.00 | $1,160.00 | $800.00 |
| 43 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 608 | $9.57 | $10.00 | $10.00 | $14.25 | $10.00 |
| 44 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 608 | $9.57 | $10.00 | $10.00 | $14.25 | $10.00 |
| 45 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,169 | $9.57 | $10.00 | $10.00 | $14.25 | $11.00 |
| 46 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 1,169 | $9.57 | $10.00 | $10.00 | $14.25 | $11.00 |
| 47 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $5,000.00 | $10,000 | $5,000.00 | $5,000.00 | $2,000.00 |
| 48 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,767.48 | $15,000 | $11,006 | $14,000 | $15,000 |
| 49 | Maintaining traffic (614E11000) | LS | 1 | $79,180 | $130,000 | $322,000 | $371,500 | $400,000 |
| 50 | Field office, type B (619E16010) | MNTH | 3 | $3,755.00 | $2,000.00 | $3,000.00 | $1,000.00 | $3,500.00 |
| 51 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,390.00 | $5,000.00 | $597.00 | $1,000.00 | $3,000.00 |
| 52 | Mobilization (624E10000) | LS | 1 | $45,617 | $60,000 | $85,000 | $119,000 | $155,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 1, 2026. Compiled by Mirage Metrics.