ODOT contract 260441 bid tabulation

D02-CS FY2027 Crack Seal (CRACK SEALING). Let by Ohio DOT on October 1, 2026, District 2. 3 bids received; low bid $773,673 by Scodeller Construction Inc, -6.0% against the engineer's estimate of $823,000.

Owner
Ohio DOT
Letting
01 OCT 2026
Pay items
6
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Scodeller Construction Inc$773,673Low-6.0%
2The Aero-Mark Company LLC$876,000+13%+6.0%
3Russell Standard Corporation and Subsidiary$1,173,714+52%+43%
ODOT contract 260441: bids by rank

Engineer's estimate: $823,000.

Bid tabulation

LinePay itemUnitQuantity1. Scodeller Construction Inc2. The Aero-Mark Company LLC3. Russell Standard Corporation and Subsidiary
1Crack sealing, type IV (423E00250)SY1,879,927$0.37$0.41$0.49
2Law enforcement officer with patrol car for assistance (614E11110)HR80$95.00$55.00$85.00
3Portable changeable message sign, as per plan (614E18601)SNMT2$2,500.00$750.00$1,500.00
4Premium for contract performance bond and for payment bond (103E05000)LS1$2,500.00$3,329.93$3,250.00
5Maintaining traffic (614E11000)LS1$19,000$48,000$144,500
6Mobilization (624E10000)LS1$44,000$48,000$95,000
ODOT contract 260441: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of October 1, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy