ODOT contract 260432 bid tabulation
POR-US 224/VAR-18.67/VAR (TWO LANE RESURFACING). Let by Ohio DOT on October 1, 2026, POR. 4 bids received; low bid $4,318,587 by Shelly & Sands Inc, +6.7% against the engineer's estimate of $4,046,000.
- Owner
- Ohio DOT
- Letting
- 01 OCT 2026
- Pay items
- 113
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $4,318,587 | Low | +7.0% |
| 2 | Shelly Company | $4,367,714 | +1.0% | +8.0% |
| 3 | Karvo Companies Inc | $4,445,249 | +3.0% | +10% |
| 4 | Kokosing Construction Company Inc | $4,861,447 | +13% | +20% |
Engineer's estimate: $4,046,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Shelly Company | 3. Karvo Companies Inc | 4. Kokosing Construction Company Inc |
|---|---|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 3,848 | $13.00 | $12.55 | $10.00 | $23.00 |
| 2 | Walk removed (202E30000) | SF | 64 | $15.00 | $15.00 | $15.00 | $4.00 |
| 3 | Curb removed (202E32000) | FT | 4 | $25.00 | $20.00 | $100.00 | $25.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 40 | $40.00 | $25.00 | $125.00 | $2.00 |
| 5 | Guardrail removed (202E38000) | FT | 236 | $2.40 | $2.40 | $2.40 | $2.40 |
| 7 | Catch basin removed (202E58100) | EACH | 4 | $1,000.00 | $500.00 | $1,250.00 | $1,000.00 |
| 8 | Removal misc.: barrier reflector (202E98100) | EACH | 124 | $5.00 | $5.00 | $5.00 | $5.00 |
| 9 | Excavation (203E10000) | CY | 389 | $36.00 | $45.00 | $30.00 | $50.00 |
| 10 | Excavation (203E10000) | CY | 58 | $350.00 | $20.00 | $25.00 | $145.00 |
| 11 | Subgrade compaction (204E10000) | SY | 502 | $10.00 | $1.00 | $0.25 | $10.00 |
| 12 | Proof rolling (204E45000) | HR | 1 | $200.00 | $125.00 | $250.00 | $290.00 |
| 13 | Linear grading (209E60200) | STA | 619 | $50.00 | $55.00 | $50.00 | $80.00 |
| 14 | Guardrail, type MGS (606E15050) | FT | 236 | $35.60 | $35.60 | $37.60 | $35.60 |
| 16 | 4" concrete walk (608E10000) | SF | 44 | $25.00 | $75.00 | $25.00 | $22.00 |
| 17 | Curb ramp (608E52000) | SF | 20 | $65.00 | $150.00 | $75.00 | $75.00 |
| 18 | Portable barrier, anchored (622E41110) | FT | 1,170 | $24.00 | $12.00 | $12.00 | $12.00 |
| 19 | Special - as-built construction plans (690E91000) | LS | 1 | $2,400.00 | $10,000 | $2,000.00 | $4,500.00 |
| 20 | Special - vertical clearance (690E98000) | EACH | 2 | $1,200.00 | $780.00 | $780.00 | $2,700.00 |
| 21 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 22 | Aggregate drains (605E31100) | FT | 66 | $25.00 | $70.00 | $25.00 | $26.00 |
| 23 | 4" conduit, type B (611E00100) | FT | 15 | $75.00 | $100.00 | $25.00 | $85.00 |
| 24 | 12" conduit, type B (611E04400) | FT | 25 | $225.00 | $100.00 | $225.00 | $200.00 |
| 25 | Catch basin, no. 6 (611E98370) | EACH | 2 | $7,000.00 | $3,000.00 | $3,000.00 | $6,500.00 |
| 26 | Catch basin, no. 2-2C (611E98504) | EACH | 2 | $6,500.00 | $2,600.00 | $2,500.00 | $4,250.00 |
| 27 | Partial depth pavement repair (441) (251E01000) | SY | 2,000 | $55.00 | $75.00 | $35.00 | $100.00 |
| 28 | Full depth pavement sawing (252E01500) | FT | 192 | $10.00 | $5.00 | $5.00 | $3.44 |
| 29 | Pavement repair (253E01000) | SY | 30 | $780.00 | $525.00 | $425.00 | $625.00 |
| 30 | Pavement repair (253E01000) | SY | 35 | $690.00 | $445.00 | $425.00 | $650.00 |
| 31 | Pavement repair (253E01000) | SY | 140 | $400.00 | $235.00 | $425.00 | $700.00 |
| 32 | Pavement repair (253E01000) | SY | 100 | $520.00 | $320.00 | $425.00 | $710.00 |
| 33 | Pavement repair (253E01000) | SY | 45 | $570.00 | $385.00 | $450.00 | $880.00 |
| 34 | Pavement planing, asphalt concrete (T = 1.5") (254E01000) | SY | 47,760 | $1.00 | $1.75 | $3.25 | $1.35 |
| 35 | Patching planed surface (254E01600) | SY | 5,000 | $5.00 | $0.75 | $0.25 | $1.25 |
| 36 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 215 | $300.00 | $215.00 | $265.00 | $345.00 |
| 37 | Aggregate base (304E20000) | CY | 172 | $110.00 | $120.00 | $100.00 | $130.00 |
| 38 | Aggregate base (304E20000) | CY | 58 | $150.00 | $65.00 | $25.00 | $140.00 |
| 39 | Tack coat, 702.13 (407E13900) | GAL | 3 | $3.50 | $25.00 | $3.50 | $6.00 |
| 40 | Non-tracking tack coat (407E20000) | GAL | 19,368 | $3.05 | $3.00 | $3.50 | $2.90 |
| 41 | Prime coat, as per plan (408E10001) | GAL | 10,998 | $3.50 | $4.50 | $5.50 | $6.50 |
| 42 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 4,975 | $285.00 | $245.00 | $275.00 | $295.00 |
| 43 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 1,974 | $230.00 | $220.00 | $250.00 | $265.00 |
| 44 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 17 | $650.00 | $515.00 | $350.00 | $625.00 |
| 45 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 35 | $825.00 | $470.00 | $350.00 | $335.00 |
| 46 | Curb, type 6 (609E26000) | FT | 4 | $100.00 | $200.00 | $100.00 | $100.00 |
| 47 | Compacted aggregate (617E10100) | CY | 766 | $125.00 | $100.00 | $100.00 | $40.00 |
| 48 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 18.66 | $915.00 | $1,800.00 | $715.00 | $915.00 |
| 49 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 11.71 | $915.00 | $1,940.00 | $715.00 | $915.00 |
| 50 | Pavement planing, asphalt concrete, class A (T = 0 (897E01010) | SY | 109,303 | $1.00 | $1.00 | $1.50 | $0.90 |
| 51 | Pavement planing, asphalt concrete, class A (T = 1 (897E01010) | SY | 56,642 | $1.00 | $1.40 | $2.00 | $1.00 |
| 52 | Delineator, misc.:longitudinal channelizing device (620E70010) | FT | 222 | $45.00 | $45.00 | $45.00 | $45.00 |
| 53 | RPM (621E00100) | EACH | 887 | $39.00 | $39.00 | $39.00 | $39.00 |
| 54 | Raised pavement marker removed (621E54000) | EACH | 710 | $5.00 | $4.00 | $1.00 | $3.00 |
| 55 | Barrier reflector, type 2, BI-directional (626E00110) | EACH | 155 | $14.40 | $28.50 | $28.50 | $14.40 |
| 56 | Ground mounted support, no. 2 post (630E02100) | FT | 89 | $17.50 | $17.50 | $17.50 | $17.50 |
| 57 | Ground mounted support, no. 3 post (630E03100) | FT | 43 | $18.50 | $18.50 | $18.50 | $18.50 |
| 58 | Sign post reflector (630E08600) | EACH | 1 | $55.00 | $55.00 | $55.00 | $55.00 |
| 59 | Sign, flat sheet (630E80100) | SF | 54.50 | $35.00 | $35.00 | $35.00 | $35.00 |
| 60 | Sign, flat sheet (630E80100) | SF | 8 | $35.00 | $35.00 | $35.00 | $35.00 |
| 61 | Removal of ground mounted sign and disposal (630E84900) | EACH | 12 | $25.00 | $25.00 | $25.00 | $25.00 |
| 62 | Removal of ground mounted post support and disposal (630E86002) | EACH | 10 | $25.00 | $25.00 | $25.00 | $25.00 |
| 63 | Edge line, 6" (646E10010) | MI | 23.50 | $3,100.00 | $3,100.00 | $3,100.00 | $3,100.00 |
| 64 | Center line (646E10200) | MI | 11.71 | $3,250.00 | $3,250.00 | $3,250.00 | $3,250.00 |
| 65 | Channelizing line, 8" (646E10300) | FT | 842 | $1.55 | $1.55 | $1.55 | $1.55 |
| 66 | Stop line (646E10400) | FT | 102 | $11.50 | $11.50 | $11.50 | $11.50 |
| 67 | Transverse/diagonal line (646E10600) | FT | 108 | $8.50 | $8.50 | $8.50 | $8.50 |
| 68 | Parking lot stall marking (646E20200) | FT | 138 | $4.50 | $4.50 | $4.50 | $4.50 |
| 69 | Lane arrow (646E20300) | EACH | 9 | $167.00 | $167.00 | $167.00 | $167.00 |
| 70 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 50 | $95.00 | $100.00 | $150.00 | $120.00 |
| 71 | Work zone marking sign (614E12460) | EACH | 14 | $85.00 | $85.00 | $85.00 | $85.00 |
| 72 | Asphalt concrete for maintaining traffic (614E13000) | CY | 20 | $500.00 | $125.00 | $200.00 | $850.00 |
| 73 | Barrier reflector, type 1, BI-directional (614E13310) | EACH | 14 | $5.00 | $20.00 | $5.00 | $40.00 |
| 74 | Object marker, one way (614E13350) | EACH | 8 | $5.00 | $20.00 | $8.00 | $50.00 |
| 75 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 76 | Work zone center line, class I (614E21000) | MI | 11.71 | $950.00 | $950.00 | $950.00 | $950.00 |
| 77 | Work zone center line, class III, 642 paint (614E21550) | MI | 12.09 | $900.00 | $900.00 | $900.00 | $900.00 |
| 78 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 23.81 | $635.00 | $635.00 | $635.00 | $635.00 |
| 79 | Work zone channelizing line, class I, 8" (614E23000) | FT | 725 | $0.70 | $0.70 | $0.70 | $0.70 |
| 80 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 725 | $0.60 | $0.60 | $0.60 | $0.60 |
| 81 | Work zone stop line, class I (614E26000) | FT | 102 | $2.95 | $2.95 | $2.95 | $2.95 |
| 82 | Work zone stop line, class III, 642 paint (614E26610) | FT | 180 | $2.95 | $2.95 | $2.95 | $2.95 |
| 83 | Pavement for maintaining traffic, class A (615E20000) | SY | 3,790 | $65.00 | $50.00 | $40.00 | $85.00 |
| 84 | Removal of existing pavement marking (512E74500) | FT | 425 | $8.00 | $3.00 | $0.50 | $6.90 |
| 85 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 |
| 86 | Approach slab removed (202E22900) | SY | 224 | $132.00 | $132.00 | $132.00 | $132.00 |
| 87 | Embankment (203E20000) | CY | 10 | $100.00 | $100.00 | $100.00 | $100.00 |
| 88 | Granular material, type B (203E35110) | CY | 10 | $110.00 | $110.00 | $110.00 | $110.00 |
| 89 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $11,500 | $11,500 | $11,500 | $11,500 |
| 90 | Unclassified excavation (503E21100) | CY | 66 | $215.00 | $215.00 | $215.00 | $215.00 |
| 91 | Epoxy coated steel reinforcement (509E10000) | LB | 428 | $21.00 | $21.00 | $21.00 | $21.00 |
| 92 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 64 | $19.00 | $19.00 | $19.00 | $19.00 |
| 93 | Class QC1 concrete, abutment (511E45710) | CY | 6 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 |
| 94 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 402 | $125.00 | $125.00 | $125.00 | $125.00 |
| 95 | Type 2 waterproofing (512E33000) | SY | 10 | $35.00 | $35.00 | $35.00 | $35.00 |
| 96 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 380 | $20.00 | $20.00 | $20.00 | $20.00 |
| 97 | 2" preformed expansion joint filler (516E13900) | SF | 11 | $15.00 | $15.00 | $15.00 | $15.00 |
| 98 | Integral abutment expansion joint seal (516E14014) | FT | 86 | $62.00 | $62.00 | $62.00 | $62.00 |
| 99 | Porous backfill with geotextile fabric (518E21200) | CY | 52 | $200.00 | $200.00 | $200.00 | $200.00 |
| 100 | 6" perforated corrugated plastic pipe (518E40000) | FT | 117 | $19.00 | $19.00 | $19.00 | $19.00 |
| 101 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 30 | $19.00 | $19.00 | $19.00 | $19.00 |
| 102 | Patching concrete structure, as per plan (519E11101) | SF | 135 | $200.00 | $200.00 | $200.00 | $200.00 |
| 103 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 224 | $505.00 | $505.00 | $505.00 | $505.00 |
| 104 | Type A installation (526E90010) | FT | 86 | $270.00 | $270.00 | $270.00 | $270.00 |
| 105 | Special - structures: concrete spall removal with (530E00800) | SY | 80 | $1,300.00 | $1,300.00 | $1,300.00 | $1,300.00 |
| 106 | Removal misc.: channel cleanout (202E98000) | LS | 1 | $6,500.00 | $6,500.00 | $6,500.00 | $6,500.00 |
| 107 | Removal misc.: channel cleanout (202E98000) | LS | 1 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 |
| 108 | Removal misc.: channel cleanout (202E98000) | LS | 1 | $6,500.00 | $6,500.00 | $6,500.00 | $6,500.00 |
| 109 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,000 | $40,000 | $44,800 | $19,460 |
| 110 | Maintaining traffic (614E11000) | LS | 1 | $221,435 | $500,000 | $222,002 | $232,086 |
| 111 | Field office, type B (619E16010) | MNTH | 6 | $4,000.00 | $4,000.00 | $4,000.00 | $3,200.00 |
| 112 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $5,500.00 | $5,000.00 | $2,150.00 |
| 113 | Mobilization (624E10000) | LS | 1 | $100,000 | $100,000 | $249,250 | $243,220 |
| 200 | Asphalt concrete surface course, type 1, (449), (driveways), as per plan (441E70501) | CY | 56 | $645.00 | $850.00 | $500.00 | $310.00 |
| 201 | Longitudinal joint preparation (874E21000) | MI | 11.71 | $700.00 | $6,500.00 | $4,500.00 | $7,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 1, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.