ODOT contract 260436 bid tabulation
SCI-SR 125-00.00 (CHIP SEAL). Let by Ohio DOT on October 1, 2026, SCI. 5 bids received; low bid $503,222 by Runway Incorporated, -12% against the engineer's estimate of $571,000.
- Owner
- Ohio DOT
- Letting
- 01 OCT 2026
- Pay items
- 24
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Runway Incorporated | $503,222 | Low | -12% |
| 2 | SC Construction & Materials LLC | $535,844 | +6.0% | -6.0% |
| 3 | Henry W Bergman Inc | $547,766 | +9.0% | -4.0% |
| 4 | Shelly Company | $561,782 | +12% | -2.0% |
| 5 | Strawser Construction Inc | $756,455 | +50% | +32% |
Engineer's estimate: $571,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Runway Incorporated | 2. SC Construction & Materials LLC | 3. Henry W Bergman Inc | 4. Shelly Company | 5. Strawser Construction Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 1,000 | $80.34 | $79.25 | $72.00 | $62.50 | $80.00 |
| 2 | Aggregate, single chip seal, type A (422E11000) | SY | 99,174 | $0.93 | $0.65 | $0.40 | $1.20 | $1.75 |
| 3 | Emulsion, chip seal (422E25000) | GAL | 36,694 | $3.43 | $3.65 | $5.00 | $3.45 | $3.70 |
| 4 | Fog seal (886E11000) | GAL | 14,840 | $3.21 | $3.30 | $3.50 | $3.50 | $6.75 |
| 5 | RPM (621E00100) | EACH | 633 | $30.33 | $29.00 | $38.00 | $28.39 | $30.00 |
| 6 | Raised pavement marker removed (621E54000) | EACH | 633 | $14.38 | $35.00 | $25.00 | $16.50 | $25.00 |
| 7 | Edge line, 6", type 1 (642E00104) | MI | 12.44 | $844.60 | $820.00 | $900.00 | $820.00 | $875.00 |
| 8 | Center line, type 1 (642E00300) | MI | 6.28 | $1,133.00 | $1,310.00 | $1,200.00 | $1,310.00 | $1,200.00 |
| 9 | Channelizing line, 12", type 1 (642E00404) | FT | 420 | $1.24 | $1.15 | $2.00 | $1.15 | $1.30 |
| 10 | Stop line, type 1 (642E00500) | FT | 93 | $9.27 | $6.00 | $10.00 | $6.00 | $10.00 |
| 11 | Transverse/diagonal line, type 1 (642E00700) | FT | 75 | $9.27 | $6.00 | $10.00 | $6.00 | $9.50 |
| 12 | Lane arrow, type 1 (642E01300) | EACH | 8 | $61.80 | $85.00 | $66.00 | $85.00 | $65.00 |
| 13 | Removal of pavement marking (644E30000) | FT | 588 | $3.09 | $3.00 | $3.30 | $3.00 | $3.25 |
| 14 | Removal of pavement marking (644E30020) | EACH | 8 | $51.50 | $110.00 | $55.00 | $110.00 | $55.00 |
| 15 | Removal of pavement marking (644E30030) | MI | 18.61 | $1,081.50 | $1,385.00 | $1,100.00 | $1,385.00 | $1,200.00 |
| 16 | Work zone marking sign (614E12460) | EACH | 27 | $108.37 | $150.00 | $115.00 | $95.00 | $115.00 |
| 17 | Work zone center line, class III, 642 paint (614E21550) | MI | 18.84 | $767.35 | $880.00 | $800.00 | $880.00 | $800.00 |
| 18 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 37.32 | $597.40 | $400.00 | $640.00 | $565.00 | $625.00 |
| 19 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 1,260 | $0.52 | $1.00 | $0.70 | $0.95 | $0.50 |
| 20 | Work zone stop line, class III, 642 paint (614E26610) | FT | 279 | $7.21 | $3.15 | $8.00 | $3.15 | $7.00 |
| 21 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,000 | $5,000.00 | $4,000.00 | $3,500.00 | $4,500.00 |
| 22 | Maintaining traffic (614E11000) | LS | 1 | $13,457 | $35,000 | $25,000 | $56,250 | $67,625 |
| 23 | Construction layout stakes and surveying (623E10000) | LS | 1 | $14,500 | $1,000.00 | $2,000.00 | $2,250.00 | $2,500.00 |
| 24 | Mobilization (624E10000) | LS | 1 | $3,000.00 | $41,000 | $40,000 | $20,000 | $67,625 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 1, 2026. Compiled by Mirage Metrics.