ODOT contract 260438 bid tabulation
VIN-SR 278-02.79 (CULVERT REPLACEMENT). Let by Ohio DOT on October 1, 2026, VIN. 7 bids received; low bid $646,674 by Fillmore Construction, +14% against the engineer's estimate of $567,000.
- Owner
- Ohio DOT
- Letting
- 01 OCT 2026
- Pay items
- 60
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Fillmore Construction | $646,674 | Low | +14% |
| 2 | Alan Stone Co Inc | $654,706 | +1.0% | +15% |
| 3 | Sunesis Construction Co | $665,710 | +3.0% | +17% |
| 4 | Eclipse Co LLC | $687,931 | +6.0% | +21% |
| 5 | Axis Civil Construction LLC | $740,490 | +15% | +31% |
| 6 | Complete General Construction Company | $859,016 | +33% | +52% |
| 7 | Parker Corporation | $906,198 | +40% | +60% |
Engineer's estimate: $567,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fillmore Construction | 2. Alan Stone Co Inc | 3. Sunesis Construction Co | 4. Eclipse Co LLC | 5. Axis Civil Construction LLC | 6. Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $15,000 | $29,000 | $15,595 | $13,000 | $18,000 | $19,000 |
| 2 | Structure removed (202E11000) | LS | 1 | $5,000.00 | $20,000 | $2,949.00 | $22,290 | $35,000 | $20,000 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 115 | $100.00 | $15.00 | $17.00 | $30.85 | $42.00 | $50.00 |
| 4 | Catch basin removed (202E58100) | EACH | 1 | $1,000.00 | $490.00 | $761.00 | $233.90 | $1,500.00 | $1,000.00 |
| 5 | Excavation (203E10000) | CY | 224 | $50.00 | $40.00 | $49.00 | $17.75 | $38.00 | $75.00 |
| 6 | Embankment (203E20000) | CY | 222 | $80.00 | $55.00 | $27.00 | $16.85 | $38.00 | $35.00 |
| 7 | Subgrade compaction (204E10000) | SY | 347 | $5.00 | $7.50 | $6.00 | $1.65 | $2.80 | $9.00 |
| 8 | Preparing subgrade for shoulder paving (209E72000) | STA | 9 | $1,000.00 | $180.00 | $391.00 | $700.25 | $1,905.00 | $250.00 |
| 9 | Guardrail, type MGS (606E15050) | FT | 112.50 | $100.00 | $50.00 | $43.00 | $36.80 | $43.00 | $36.80 |
| 10 | Anchor assembly, MGS type A (606E25550) | EACH | 1 | $2,500.00 | $2,300.00 | $2,000.00 | $2,280.00 | $2,000.00 | $2,280.00 |
| 11 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,500.00 | $1,400.00 | $1,200.00 | $1,760.00 | $1,200.00 | $1,760.00 |
| 12 | Rock channel protection, type B with filter (601E32100) | CY | 122 | $200.00 | $120.00 | $254.00 | $119.60 | $140.00 | $125.00 |
| 13 | Seeding and mulching (659E10000) | SY | 1,354 | $2.25 | $3.00 | $5.00 | $3.80 | $2.50 | $2.50 |
| 14 | Commercial fertilizer (659E20000) | TON | 0.12 | $1,400.00 | $630.00 | $750.00 | $890.00 | $1,250.00 | $1,250.00 |
| 15 | Lime (659E31000) | ACRE | 0.28 | $450.00 | $910.00 | $100.00 | $50.00 | $150.00 | $150.00 |
| 16 | Water (659E35000) | MGAL | 4 | $1.00 | $110.00 | $10.00 | $1.00 | $1.00 | $1.00 |
| 17 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 18 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $10,000 | $58,000 | $35,608 | $36,478 | $75,000 | $133,000 |
| 19 | Unclassified excavation, including rock (503E21320) | LS | 1 | $20,000 | $20,000 | $87,257 | $5,378.45 | $25,000 | $15,000 |
| 20 | Aggregate drains (605E31100) | FT | 35 | $30.00 | $55.00 | $34.00 | $15.95 | $30.00 | $30.00 |
| 21 | 15" conduit, type C (611E06100) | FT | 20 | $150.00 | $100.00 | $180.00 | $70.45 | $35.00 | $300.00 |
| 22 | 15" conduit, type D (611E06400) | FT | 20 | $100.00 | $230.00 | $147.00 | $71.40 | $35.00 | $400.00 |
| 23 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $5,000.00 | $6,000.00 | $2,251.00 | $4,063.65 | $3,600.00 | $3,500.00 |
| 24 | Manhole, no. 3 (611E99574) | EACH | 1 | $20,000 | $26,000 | $22,934 | $28,140 | $29,000 | $15,000 |
| 25 | Porous backfill with geotextile fabric (518E21200) | CY | 10 | $300.00 | |||||
| 26 | Concrete masonry (602E20000) | CY | 20.80 | $1,800.00 | |||||
| 27 | 72" conduit, type B, as per plan, 706.02 (611E26201) | FT | 73 | $1,100.00 | |||||
| 28 | 72" conduit, type C (611E26400) | FT | 53 | $1,000.00 | |||||
| 29 | Low strength mortar backfill (type 2) (613E41300) | CY | 205 | $300.00 | |||||
| 30 | Porous backfill with geotextile fabric (518E21200) | CY | 10 | $330.00 | $199.00 | $176.50 | $225.00 | $175.00 | |
| 31 | Concrete masonry (602E20000) | CY | 20.90 | $920.00 | $1,162.00 | $1,673.40 | $1,650.00 | $1,500.00 | |
| 32 | 72" conduit, type B, as per plan, 707.85 (611E26201) | FT | 73 | $590.00 | $566.00 | $766.20 | $900.00 | $1,400.00 | |
| 33 | 72" conduit, type C (611E26400) | FT | 53 | $600.00 | $742.00 | $785.90 | $900.00 | $1,300.00 | |
| 34 | Low strength mortar backfill (type 2) (613E41300) | CY | 185 | $220.00 | $214.00 | $263.70 | $215.00 | $200.00 | |
| 35 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 53 | $400.00 | $510.00 | $590.00 | $680.00 | $430.00 | $590.00 |
| 36 | Aggregate base (304E20000) | CY | 56 | $160.00 | $170.00 | $153.00 | $147.90 | $190.00 | $125.00 |
| 37 | Non-tracking tack coat (407E20000) | GAL | 142 | $10.00 | $6.00 | $4.00 | $4.50 | $10.00 | $4.30 |
| 38 | Prime coat (408E10000) | GAL | 78 | $20.00 | $25.00 | $6.00 | $10.00 | $7.00 | $10.00 |
| 39 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 70 | $420.00 | $410.00 | $456.00 | $455.00 | $490.00 | $456.00 |
| 40 | Compacted aggregate (617E10100) | CY | 14 | $200.00 | $290.00 | $353.00 | $174.30 | $190.00 | $125.00 |
| 41 | Raised pavement marker removed (621E54000) | EACH | 10 | $10.00 | $40.00 | $30.00 | $100.00 | $52.00 | $50.00 |
| 42 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 3 | $10.57 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 43 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $200.00 | $230.00 | $200.00 | $95.00 | $200.00 | $95.00 |
| 44 | Removal of ground mounted post support and reerection (630E86010) | EACH | 2 | $400.00 | $340.00 | $300.00 | $220.00 | $300.00 | $220.00 |
| 45 | Edge line, 6", type 1 (642E00104) | MI | 0.18 | $5,100.00 | $5,800.00 | $5,100.00 | $5,100.00 | $4,275.00 | $4,275.00 |
| 46 | Center line, type 1 (642E00300) | MI | 0.09 | $5,100.00 | $5,800.00 | $5,100.00 | $5,100.00 | $8,050.00 | $8,050.00 |
| 47 | Stop line, type 1 (642E00500) | FT | 10 | $9.00 | $10.00 | $9.00 | $9.00 | $16.00 | $16.00 |
| 48 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 4 | $2,257.91 | $2,600.00 | $2,258.00 | $2,257.90 | $2,550.00 | $3,120.00 |
| 49 | Work zone lighting system (614E12740) | EACH | 1 | $50,000 | $45,000 | $1,000.00 | $50,000 | $750.00 | $15,000 |
| 50 | Barrier reflector, type 1 (bidirectional) (614E13310) | EACH | 14 | $10.57 | $50.00 | $11.00 | $10.55 | $18.00 | $44.00 |
| 51 | Object marker, two way (614E13360) | EACH | 14 | $19.97 | $55.00 | $20.00 | $19.95 | $18.00 | $48.00 |
| 52 | Work zone edge line, class I, 4" (614E22000) | MI | 0.25 | $6,000.00 | $5,100.00 | $6,000.00 | $6,000.00 | $4,550.00 | $4,550.00 |
| 53 | Work zone stop line, class I (614E26000) | FT | 20 | $10.00 | $15.00 | $10.00 | $10.00 | $14.00 | $14.00 |
| 54 | Roads for maintaining traffic (615E10000) | LS | 1 | $7,500.00 | $9,400.00 | $6,436.00 | $13,176 | $13,500 | $15,000 |
| 55 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 174 | $200.00 | $140.00 | $178.00 | $140.00 | $145.00 | $135.00 |
| 56 | Portable barrier, unanchored (622E41100) | FT | 264 | $62.11 | $45.00 | $70.00 | $68.95 | $40.00 | $63.00 |
| 57 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,500.00 | $10,000 | $4,512.00 | $8,834.85 | $6,500.00 | $7,000.00 |
| 58 | Maintaining traffic (614E11000) | LS | 1 | $16,500 | $33,000 | $9,185.00 | $19,287 | $90,000 | $110,000 |
| 59 | Construction layout stakes and surveying (623E10000) | LS | 1 | $5,000.00 | $25,000 | $12,850 | $15,272 | $15,000 | $9,000.00 |
| 60 | Mobilization (624E10000) | LS | 1 | $15,000 | $42,000 | $95,286 | $99,102 | $40,000 | $43,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 1, 2026. Compiled by Mirage Metrics.