ODOT contract 260060 bid tabulation
MOE-TR 2214-00.06 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on January 29, 2026, MOE. 5 bids received; low bid $921,024 by Shelly & Sands Inc, +0.1% against the engineer's estimate of $920,000.
- Owner
- Ohio DOT
- Letting
- 29 JAN 2026
- Pay items
- 48
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $921,024 | Low | 0.0% |
| 2 | J & J Bridge Company Inc | $965,863 | +5.0% | +5.0% |
| 3 | Black Horse Bridge Construction Inc | $1,012,581 | +10% | +10% |
| 4 | R C Construction Company and Son Inc | $1,114,385 | +21% | +21% |
| 5 | Ohio-West Virginia Excavating Co | $1,198,233 | +30% | +30% |
Engineer's estimate: $920,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. J & J Bridge Company Inc | 3. Black Horse Bridge Construction Inc | 4. R C Construction Company and Son Inc | 5. Ohio-West Virginia Excavating Co |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $15,700 | $25,000 | $14,400 | $10,000 | $15,000 |
| 2 | Excavation (203E10000) | CY | 79 | $15.00 | $22.00 | $20.00 | $20.00 | $60.00 |
| 3 | Embankment (203E20000) | CY | 985 | $40.00 | $30.00 | $55.00 | $30.00 | $45.00 |
| 4 | Subgrade compaction (204E10000) | SY | 409 | $6.00 | $6.00 | $7.00 | $2.00 | $6.00 |
| 5 | Guardrail, type MGS (606E15050) | FT | 112.50 | $26.00 | $25.00 | $40.00 | $40.00 | $42.00 |
| 6 | Anchor assembly, MGS type T (606E26550) | EACH | 4 | $1,300.00 | $1,250.00 | $1,080.00 | $1,500.00 | $1,200.00 |
| 7 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 4 | $2,800.00 | $2,650.00 | $2,090.00 | $2,500.00 | $3,500.00 |
| 8 | Topsoil (659E00300) | CY | 99 | $42.00 | $5.00 | $85.00 | $25.00 | $75.00 |
| 9 | Seeding and mulching (659E10000) | SY | 891 | $3.70 | $2.00 | $7.50 | $20.00 | $4.00 |
| 10 | Repair seeding and mulching (659E14000) | SY | 45 | $3.70 | $2.00 | $0.80 | $0.20 | $4.00 |
| 11 | Inter-seeding (659E15000) | SY | 45 | $3.70 | $2.00 | $0.80 | $0.20 | $4.00 |
| 12 | Commercial fertilizer (659E20000) | TON | 0.12 | $1,300.00 | $3,000.00 | $950.00 | $3,000.00 | $1,400.00 |
| 13 | Lime (659E31000) | ACRE | 0.18 | $160.00 | $2,000.00 | $158.33 | $3,000.00 | $175.00 |
| 14 | Water (659E35000) | MGAL | 16 | $1.00 | $10.00 | $1.00 | $1.00 | $1.00 |
| 15 | Aggregate base (304E20000) | CY | 150 | $125.00 | $120.00 | $130.00 | $175.00 | $150.00 |
| 16 | Aggregate base, as per plan (304E20001) | CY | 91 | $70.00 | $130.00 | $135.00 | $175.00 | $135.00 |
| 17 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $26.00 | $10.00 | $50.00 | $50.00 | $200.00 |
| 18 | Removal of ground mounted post support and disposal (630E86002) | EACH | 2 | $26.00 | $10.00 | $50.00 | $50.00 | $200.00 |
| 19 | Roads for maintaining traffic, as per plan (615E10001) | LS | 1 | $7,500.00 | $30,000 | $62,000 | $75,000 | $85,000 |
| 20 | Water (616E10000) | MGAL | 2 | $120.00 | $10.00 | $1.00 | $1.00 | $10.00 |
| 21 | Structure removed, over 20 foot span (202E11002) | LS | 1 | $15,000 | $20,000 | $23,700 | $20,000 | $18,000 |
| 22 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $35,000 | $100.00 | $1,000.00 | $15,000 | $25,000 |
| 23 | Unclassified excavation (503E21100) | CY | 70 | $145.00 | $75.00 | $20.00 | $25.00 | $65.00 |
| 24 | Epoxy coated steel reinforcement (509E10000) | LB | 20,987 | $2.00 | $2.00 | $2.00 | $3.00 | $2.50 |
| 25 | Semi-integral diaphragm guide (511E33500) | EACH | 4 | $3,500.00 | $4,500.00 | $4,332.50 | $3,500.00 | $5,000.00 |
| 26 | Class QC2 concrete, bridge deck (511E34444) | CY | 62 | $1,500.00 | $1,500.00 | $1,725.00 | $1,900.00 | $3,000.00 |
| 27 | Class QC1 concrete with QC/QA, abutment including footing (511E43512) | CY | 75 | $1,240.00 | $1,400.00 | $850.00 | $900.00 | $1,200.00 |
| 28 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 250 | $94.00 | $35.00 | $28.00 | $50.00 | $50.00 |
| 29 | Structural steel members, level UF, as per plan (513E10201) | LB | 4,817 | $4.00 | $7.00 | $4.00 | $10.00 | $3.75 |
| 30 | Draped strand prestressed concrete bridge I-beam members, level 3, type 4 (515E15020) | EACH | 3 | $70,500 | $62,600 | $75,000 | $75,000 | $89,000 |
| 31 | Intermediate diaphragms (515E20000) | EACH | 6 | $3,200.00 | $3,500.00 | $2,750.00 | $3,500.00 | $3,200.00 |
| 32 | 2" preformed expansion joint filler (516E13900) | SF | 121 | $17.00 | $6.00 | $14.00 | $50.00 | $10.00 |
| 33 | Semi-integral abutment expansion joint seal (516E14020) | FT | 68 | $49.00 | $43.00 | $53.00 | $100.00 | $45.00 |
| 34 | Elastomeric bearing with internal laminates and load plate (516E44300) | EACH | 6 | $2,600.00 | $2,000.00 | $2,000.00 | $3,000.00 | $2,600.00 |
| 35 | Railing (twin steel tube) (517E70000) | FT | 210 | $265.00 | $248.00 | $250.00 | $250.00 | $275.00 |
| 36 | Porous backfill with geotextile fabric (518E21200) | CY | 50 | $145.00 | $175.00 | $190.00 | $175.00 | $300.00 |
| 37 | 6" perforated corrugated plastic pipe (518E40000) | FT | 78 | $15.00 | $8.00 | $14.00 | $50.00 | $20.00 |
| 38 | 6" non-perforated corrugated plastic pipe (518E40012) | FT | 98 | $13.00 | $8.00 | $22.00 | $50.00 | $20.00 |
| 39 | Drilled shafts, 30" diameter, into bedrock (524E94604) | FT | 56 | $400.00 | $800.00 | $950.00 | $800.00 | $700.00 |
| 40 | Drilled shafts, 36" diameter, above bedrock (524E94702) | FT | 60 | $400.00 | $800.00 | $950.00 | $800.00 | $600.00 |
| 41 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 8 | $179.00 | $200.00 | $170.00 | $50.00 | $200.00 |
| 42 | Rock channel protection, type A with filter, as per plan (601E32001) | CY | 126 | $115.00 | $150.00 | $165.00 | $175.00 | $73.00 |
| 43 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $365.00 | $300.00 | $700.00 | $250.00 | $400.00 |
| 44 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,800.00 | $50,000 | $9,000.00 | $30,000 | $20,000 |
| 45 | Maintaining traffic (614E11000) | LS | 1 | $4,000.00 | $5,000.00 | $5,000.00 | $20,000 | $10,000 |
| 46 | Construction layout stakes and surveying (623E10000) | LS | 1 | $15,000 | $5,000.00 | $12,000 | $15,000 | $4,000.00 |
| 47 | Mobilization (624E10000) | LS | 1 | $45,000 | $33,000 | $40,000 | $20,000 | $40,000 |
| 100 | Erosion control (832E30000) | EACH | 5,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 29, 2026. Compiled by Mirage Metrics.