ODOT contract 260196 bid tabulation
BEL-SR 7-00.94 (CULVERT REPLACEMENT). Let by Ohio DOT on April 23, 2026, BEL. 4 bids received; low bid $199,388 by Double B Excavating LLC, -9.4% against the engineer's estimate of $220,000.
- Owner
- Ohio DOT
- Letting
- 23 APR 2026
- Pay items
- 34
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Double B Excavating LLC | $199,388 | Low | -9.0% |
| 2 | Ohio-West Virginia Excavating Co | $219,167 | +10% | 0.0% |
| 3 | Mason Dixon Energy Services LLC | $256,559 | +29% | +17% |
| 4 | R C Construction Company and Son Inc | $381,990 | +92% | +74% |
Engineer's estimate: $220,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Double B Excavating LLC | 2. Ohio-West Virginia Excavating Co | 3. Mason Dixon Energy Services LLC | 4. R C Construction Company and Son Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,625.00 | $1,500.00 | $5,000.00 | $7,500.00 |
| 2 | Pipe removed, 24" and under (202E35100) | FT | 294 | $10.71 | $30.00 | $50.00 | $50.00 |
| 3 | Catch basin removed (202E58100) | EACH | 2 | $131.25 | $1,225.00 | $450.00 | $1,500.00 |
| 4 | Removal misc.: private sign removed (202E98100) | EACH | 1 | $262.50 | $300.00 | $100.00 | $500.00 |
| 5 | Removal misc.: sign foundation removed (202E98100) | EACH | 1 | $262.50 | $300.00 | $450.00 | $500.00 |
| 6 | Embankment (203E20000) | CY | 254 | $31.00 | $35.00 | $70.00 | $75.00 |
| 7 | Subgrade compaction (204E10000) | SY | 266 | $31.58 | $3.00 | $50.00 | $2.00 |
| 8 | Rock channel protection, type C with aggregate filter (601E32210) | CY | 3 | $525.00 | $500.00 | $250.00 | $500.00 |
| 9 | Soil analysis test (659E00100) | EACH | 2 | $315.00 | $150.00 | $100.00 | $20.00 |
| 10 | Topsoil (659E00300) | CY | 58 | $99.57 | $40.00 | $70.00 | $75.00 |
| 11 | Seeding and mulching (659E10000) | SY | 522 | $9.05 | $6.00 | $6.00 | $20.00 |
| 12 | Repair seeding and mulching (659E14000) | SY | 26 | $18.17 | $6.00 | $2.00 | $0.20 |
| 13 | Commercial fertilizer (659E20000) | TON | 0.07 | $15,000 | $1,250.00 | $650.00 | $1,900.00 |
| 14 | Lime (659E31000) | ACRE | 0.11 | $4,772.73 | $150.00 | $600.00 | $1,500.00 |
| 15 | Water (659E35000) | MGAL | 5 | $21.00 | $1.00 | $30.00 | $1.00 |
| 16 | Erosion control (832E30000) | EACH | 6,300 | $1.00 | $1.00 | $1.00 | $1.00 |
| 17 | Concrete masonry (602E20000) | CY | 0.60 | $2,100.00 | $4,200.00 | $2,500.00 | $4,500.00 |
| 18 | 12" conduit, type B (611E04400) | FT | 33 | $63.64 | $160.00 | $105.00 | $250.00 |
| 19 | 18" conduit, type C, as per plan (611E07601) | FT | 284 | $96.50 | $142.00 | $160.00 | $300.00 |
| 20 | 24" conduit, type B, as per plan (611E10401) | FT | 163 | $112.73 | $272.00 | $170.00 | $350.00 |
| 21 | 30" conduit, type B (611E13400) | FT | 126 | $150.00 | $222.00 | $210.00 | $400.00 |
| 22 | Catch basin, no. 2-2C (611E98504) | EACH | 1 | $1,575.00 | $3,400.00 | $4,500.00 | $4,000.00 |
| 23 | Manhole, no. 3, as per plan (611E99575) | EACH | 2 | $2,126.25 | $5,000.00 | $4,500.00 | $7,500.00 |
| 24 | Aggregate base (304E20000) | CY | 59 | $92.54 | $95.00 | $180.00 | $200.00 |
| 25 | Ground mounted support, no. 3 post (630E03100) | FT | 25.60 | $51.27 | $35.00 | $30.00 | $25.00 |
| 26 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $525.00 | $260.00 | $80.00 | $275.00 |
| 27 | Removal of ground mounted post support and disposal (630E86002) | EACH | 4 | $262.50 | $130.00 | $80.00 | $100.00 |
| 28 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $262.50 | $300.00 | $200.00 | $100.00 |
| 29 | Water (616E10000) | MGAL | 5 | $21.00 | $1.00 | $30.00 | $1.00 |
| 30 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,300.00 | $5,000.00 | $4,000.00 | $16,500 |
| 31 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $15,750 | $9,000.00 | $28,000 | $25,000 |
| 32 | Field office, type A (619E16000) | MNTH | 2 | $1,050.00 | $1,200.00 | $3,000.00 | $500.00 |
| 33 | Construction layout stakes and surveying (623E10000) | LS | 1 | $5,250.00 | $6,500.00 | $6,500.00 | $18,500 |
| 34 | Mobilization (624E10000) | LS | 1 | $40,000 | $14,750 | $12,900 | $15,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.