ODOT contract 250415 bid tabulation
PIC-SR 56-20.77 (SLIDE REPAIR). Let by Ohio DOT on September 11, 2025, PIC. 10 bids received; low bid $468,522 by Sunesis Construction Co, -47% against the engineer's estimate of $881,000.
- Owner
- Ohio DOT
- Letting
- 11 SEP 2025
- Pay items
- 26
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Sunesis Construction Co | $468,522 | Low | -47% |
| 2 | Complete General Construction Company | $486,768 | +4.0% | -45% |
| 3 | Shelly & Sands Inc | $511,186 | +9.0% | -42% |
| 4 | Beaver Excavating Company | $537,960 | +15% | -39% |
| 5 | Miller Bros Const Inc | $549,884 | +17% | -38% |
| 6 | Alan Stone Co Inc | $662,751 | +41% | -25% |
| 7 | Beaty Construction Inc | $721,936 | +54% | -18% |
| 8 | Axis Civil Construction LLC | $743,713 | +59% | -16% |
| 9 | Double Z Construction Company | $759,985 | +62% | -14% |
| 10 | Craig Edward Susany Inc | $789,838 | +69% | -10% |
Engineer's estimate: $881,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sunesis Construction Co | 2. Complete General Construction Company | 3. Shelly & Sands Inc | 4. Beaver Excavating Company | 5. Miller Bros Const Inc | 6. Alan Stone Co Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Guardrail removed, as per plan (202E38001) | FT | 462.50 | $5.00 | $2.00 | $5.00 | $6.00 | $5.00 | $6.00 |
| 2 | Anchor assembly removed, type E, as per plan (202E42011) | EACH | 2 | $498.34 | $145.00 | $275.00 | $300.00 | $275.00 | $530.00 |
| 3 | Special - pipe cleanout, 24" and under (202E70110) | FT | 45 | $67.57 | $30.00 | $99.00 | $100.00 | $65.01 | $45.00 |
| 4 | Excavation (203E10000) | CY | 24 | $35.69 | $55.00 | $29.00 | $35.00 | $70.80 | $30.00 |
| 5 | Embankment, as per plan (203E20001) | CY | 96 | $22.06 | $59.00 | $68.00 | $60.00 | $40.35 | $75.00 |
| 6 | Granular material, type B, as per plan (203E35111) | CY | 364 | $106.70 | $98.00 | $115.00 | $100.00 | $48.94 | $95.00 |
| 7 | Guardrail, type MGS (606E15050) | FT | 612.50 | $23.00 | $21.20 | $23.00 | $19.54 | $19.54 | $25.00 |
| 8 | Anchor assembly, MGS type E, as per plan, (MASH 20 (606E26151) | EACH | 1 | $2,400.00 | $2,750.00 | $2,400.00 | $2,200.00 | $2,200.00 | $2,800.00 |
| 9 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,250.00 | $1,420.00 | $1,250.00 | $1,000.00 | $1,000.00 | $1,300.00 |
| 10 | Topsoil (659E00300) | CY | 33 | $146.12 | $55.00 | $95.00 | $60.00 | $97.46 | $85.00 |
| 11 | Seeding and mulching (659E10000) | SY | 288 | $16.89 | $10.00 | $10.00 | $10.00 | $10.00 | $5.50 |
| 12 | Commercial fertilizer (659E20000) | TON | 0.04 | $900.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $710.00 |
| 13 | Lime (659E31000) | ACRE | 0.06 | $100.00 | $150.00 | $150.00 | $150.00 | $150.00 | $1,000.00 |
| 14 | Water (659E35000) | MGAL | 2 | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 | $130.00 |
| 15 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 16 | Barrier reflector, type 2, 2 bidirectional (626E00110) | EACH | 8 | $11.50 | $12.00 | $11.50 | $11.00 | $11.00 | $15.00 |
| 17 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 32 | $85.00 | $95.00 | $110.00 | $75.00 | $108.74 | $140.00 |
| 18 | Detour signing (614E12420) | LS | 1 | $7,490.00 | $10,000 | $7,490.00 | $7,490.00 | $7,490.00 | $9,500.00 |
| 19 | Asphalt concrete for maintaining traffic (614E13000) | CY | 100 | $150.00 | $325.00 | $300.00 | $325.00 | $325.00 | $250.00 |
| 20 | Portable changeable message sign, as per plan (614E18601) | SNMT | 4 | $1,050.00 | $1,050.00 | $1,050.00 | $1,050.00 | $1,050.00 | $1,300.00 |
| 21 | Water (617E25000) | MGAL | 1 | $2,482.00 | $160.00 | $80.00 | $100.00 | $282.04 | $1.00 |
| 22 | Steel sheet piling left in place, minimum section (504E11100) | SF | 11,880 | $25.32 | $28.00 | $28.75 | $31.50 | $33.03 | $38.00 |
| 23 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $3,373.36 | $4,000.00 | $3,000.00 | $3,500.00 | $2,740.95 | $7,000.00 |
| 24 | Maintaining traffic (614E11000) | LS | 1 | $3,685.86 | $3,000.00 | $8,500.00 | $9,000.00 | $22,112 | $15,000 |
| 25 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $6,100.00 | $8,000.00 | $5,000.00 | $4,600.00 | $4,600.00 | $7,500.00 |
| 26 | Mobilization (624E10000) | LS | 1 | $44,929 | $20,000 | $25,539 | $26,898 | $27,494 | $63,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.