ODOT contract 258021 bid tabulation
MAR-SR 231-03.42 (BRIDGE REPAIR). Let by Ohio DOT on September 11, 2025, MAR. 4 bids received; low bid $481,432 by Double Z Construction Company, -25% against the engineer's estimate of $640,000.
- Owner
- Ohio DOT
- Letting
- 11 SEP 2025
- Pay items
- 33
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Double Z Construction Company | $481,432 | Low | -25% |
| 2 | Suburban Maintenance & Construction Inc | $518,501 | +8.0% | -19% |
| 3 | Complete General Construction Company | $555,889 | +15% | -13% |
| 4 | Ohio Concrete Maintenance LLC | $602,434 | +25% | -6.0% |
Engineer's estimate: $640,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Double Z Construction Company | 2. Suburban Maintenance & Construction Inc | 3. Complete General Construction Company | 4. Ohio Concrete Maintenance LLC |
|---|---|---|---|---|---|---|---|
| 1 | Erosion control (832E30000) | EACH | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 2 | Ground mounted support, no. 3 post (630E03100) | FT | 16 | $70.00 | $68.74 | $69.00 | $75.00 |
| 3 | Sign, flat sheet, as per plan (630E80101) | SF | 16 | $40.00 | $37.93 | $38.00 | $42.00 |
| 4 | Signing, misc.:' structure mounted sign (630E97700) | EACH | 1 | $845.00 | $843.95 | $845.00 | $950.00 |
| 5 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 155 | $65.00 | $90.00 | $95.00 | $110.00 |
| 6 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 2 | $2,105.21 | $500.00 | $2,100.00 | $2,900.00 |
| 7 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $2,205.21 | $2,500.00 | $2,200.00 | $3,000.00 |
| 8 | Barrier reflector, type 1,one way (614E13310) | EACH | 19 | $12.00 | $2.00 | $12.00 | $13.00 |
| 9 | Object marker, one way (614E13350) | EACH | 13 | $15.00 | $2.00 | $22.00 | $25.00 |
| 10 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 0.08 | $26,665 | $28,000 | $26,700 | $30,000 |
| 11 | Work zone stop line, class III, 642 paint (614E26610) | FT | 24 | $5.00 | $10.00 | $5.00 | $7.00 |
| 12 | Portable barrier, unanchored (622E41100) | FT | 660 | $30.00 | $10.00 | $40.00 | $35.00 |
| 13 | Portable barrier, anchored (622E41110) | FT | 100 | $70.00 | $10.00 | $55.00 | $35.00 |
| 14 | Portions of structure removed, as per plan (202E11301) | CY | 14 | $1,600.00 | $2,100.00 | $1,260.00 | $1,800.00 |
| 15 | Portions of structure removed, as per plan (main M (202E11401) | LB | 6,410 | $3.20 | $9.00 | $4.04 | $3.50 |
| 16 | Portions of structure removed, as per plan (second (202E11401) | LB | 561 | $8.60 | $6.00 | $13.86 | $11.00 |
| 17 | Epoxy coated steel reinforcement (509E10000) | LB | 2,526 | $8.00 | $5.00 | $5.00 | $6.00 |
| 18 | Class QC2 concrete, superstructure (511E34410) | CY | 6 | $4,000.00 | $5,500.00 | $5,000.00 | $2,650.00 |
| 19 | Class QC2 concrete, bridge deck (parapet) (511E34448) | CY | 8 | $1,500.00 | $3,200.00 | $1,700.00 | $1,800.00 |
| 20 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 43 | $32.00 | $30.00 | $25.00 | $30.00 |
| 21 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 6 | $85.00 | $30.00 | $100.00 | $50.00 |
| 22 | Structural steel members, level UF, as per plan (513E10201) | LB | 561 | $52.00 | $12.00 | $62.44 | $60.00 |
| 23 | Structural steel members, level 2, as per plan (513E10241) | LB | 6,410 | $10.00 | $15.00 | $9.87 | $20.00 |
| 24 | Shop painting and field touch-UP of structural steel (514E80020) | SF | 486 | $82.00 | $38.00 | $100.00 | $110.00 |
| 25 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $25,000 | $2,500.00 | $30,000 | $28,000 |
| 26 | Special - structures, misc, as per plan.: existing (530E00200) | LS | 1 | $26,000 | $5,500.00 | $26,000 | $32,000 |
| 27 | Fence, misc.:, vandal protection fence removal and (607E98000) | FT | 55 | $120.00 | $150.00 | $75.00 | $150.00 |
| 28 | Damage assessment (849E10000) | LS | 1 | $4,000.00 | $15,000 | $4,000.00 | $5,500.00 |
| 29 | Surface preparation (849E10500) | LS | 1 | $5,000.00 | $8,500.00 | $3,000.00 | $15,000 |
| 30 | Straightening damaged members (849E10700) | LS | 1 | $25,000 | $48,000 | $25,000 | $37,000 |
| 31 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,000.00 | $8,500.00 | $5,000.00 | $14,000 |
| 32 | Maintaining traffic (614E11000) | LS | 1 | $65,000 | $85,000 | $122,000 | $35,000 |
| 33 | Mobilization (624E10000) | LS | 1 | $30,000 | $20,000 | $20,000 | $50,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.