ODOT contract 260356 bid tabulation

MIA-Exp Farm RSF 00.00 (TWO LANE RESURFACING). Let by Ohio DOT on July 30, 2026, MIA. 2 bids received; low bid $587,727 by Walls Bros Asphalt Co Inc, +7.2% against the engineer's estimate of $548,000.

Owner
Ohio DOT
Letting
30 JUL 2026
Pay items
26
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Walls Bros Asphalt Co Inc$587,727Low+7.0%
2Barrett Paving Materials Inc$828,556+41%+51%
ODOT contract 260356: bids by rank

Engineer's estimate: $548,000.

Bid tabulation

LinePay itemUnitQuantity1. Walls Bros Asphalt Co Inc2. Barrett Paving Materials Inc
1Pavement removed (202E23000)SY14$90.00$112.15
2Curb and gutter removed (202E32500)FT63$25.00$28.00
3Manhole adjusted to grade (611E99654)EACH21$1,500.00$1,960.00
4Pavement repair (253E01000)SY240$157.25$245.00
5Pavement planing, asphalt concrete, as per plan, 2 (254E01001)SY23,526$2.10$3.50
6Patching planed surface (254E01600)SY475$12.00$10.00
7Asphalt concrete base, PG64-22, (449) (301E56000)CY2$500.00$1,385.00
8Aggregate base (304E20000)CY4$250.00$1,105.00
9Non-tracking tack coat (407E20000)GAL2,120$4.20$4.50
10Asphalt concrete intermediate course, type 1, (449) (441E70200)CY1$500.00$2,575.00
11Combination curb and gutter, type 2, as per plan (609E12001)FT63$125.00$135.00
12Asphalt concrete surface course, type 1, (449), fiber type C (826E30040)CY1,308$280.00$350.00
13Valve box adjusted to grade (638E10800)EACH24$800.00$590.00
14Edge line, 4" (644E00100)MI0.03$10,233$10,233
15Center line (644E00300)MI1.42$5,500.00$5,500.00
16Channelizing line, 8" (644E00400)FT467$3.50$3.50
17Transverse/diagonal line (644E00700)FT23$15.00$15.00
18Lane arrow (644E01300)EACH23$150.00$150.00
19Shared lane marking (644E19000)EACH10$345.00$345.00
20Work zone center line, class III, 642 paint (614E21550)MI2.84$3,407.00$3,407.00
21Work zone edge line, class III, 4", 642 paint (614E22350)MI0.06$1,000.00$1,000.00
22Work zone channelizing line, class III, 8", 642 paint (614E23680)FT934$1.00$1.00
23Premium for contract performance bond and for payment bond (103E05000)LS1$1,661.94$1,620.00
24Maintaining traffic (614E11000)LS1$15,000$80,000
25Construction layout stakes and surveying, as per plan (623E10001)LS1$1,500.00$10,000
26Mobilization (624E10000)LS1$10,000$19,115
ODOT contract 260356: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of July 30, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy