V O Menuez & Son Inc: ODOT bid record
V O Menuez & Son Inc submitted 10 bids on Ohio DOT contracts in the data, from 01 OCT 2020 to 29 JAN 2026, and was the low bidder on 4 of them (40%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $3,159,763
- Latest bid
- 29 JAN 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 2 | 0 | 0% |
| 2021 | 4 | 1 | 25% |
| 2024 | 1 | 0 | 0% |
| 2025 | 1 | 1 | 100% |
| 2026 | 2 | 2 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| HOL | 5 | 2 | 40% |
| MED | 2 | 1 | 50% |
| ASD | 2 | 1 | 50% |
| COS | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 10 | 10 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 10 | 8 (80%) | $1.00 | $1.00 |
| Pavement removed | 202E23000 | SY | 9 | 6 (67%) | $5.50 | $17.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 5 | 5 (100%) | $5.00 | $23.50 |
| Aggregate drains | 605E31100 | FT | 5 | 5 (100%) | $8.47 | $20.00 |
| Excavation | 203E10000 | CY | 11 | 4 (36%) | $18.97 | $27.00 |
| Embankment | 203E20000 | CY | 10 | 3 (30%) | $21.88 | $25.00 |
| Aggregate base | 304E20000 | CY | 11 | 2 (18%) | $87.30 | $90.00 |
| Porous backfill with geotextile fabric | 518E21200 | CY | 7 | 2 (29%) | $100.00 | $125.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 6 | 2 (33%) | $26.86 | $34.00 |
| Soil analysis test | 659E00100 | EACH | 6 | 2 (33%) | $129.25 | $115.50 |
| 1" preformed expansion joint filler | 516E13600 | SF | 6 | 2 (33%) | $10.12 | $10.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Stanley Miller Construction Company | 7 | 1 of 7 |
| Black Horse Bridge Construction Inc | 6 | 2 of 6 |
| Shelly & Sands Inc | 6 | 3 of 6 |
| R C Construction Company and Son Inc | 4 | 0 of 4 |
| Rietschlin Construction Inc | 4 | 1 of 4 |
| Complete General Construction Company | 4 | 1 of 4 |
| Eclipse Co LLC | 3 | 1 of 3 |
| Adena Corporation | 3 | 1 of 3 |
| Ohio-West Virginia Excavating Co | 3 | 1 of 3 |
| Buds Inc | 3 | 1 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 JAN 2026 | 260074 | HOL | HOL-SR 179-03.89 (BRIDGE REPAIR) | 1 of 5 | $1,079,430 | Low, 26% under the second |
| 15 JAN 2026 | 264002 | HOL | HOL-SR 39-00.25 (CULVERT REPLACEMENT) | 1 of 7 | $355,966 | Low, 25% under the second |
| 04 DEC 2025 | 250563 | MED | MED-US 42-09.45 (BRIDGE REPAIR) | 1 of 8 | $796,377 | Low, 1.0% under the second |
| 26 SEP 2024 | 240433 | COS | COS-TR 252-00.00 (BRIDGE REPLACEMENT (1 BRIDGE)) | 7 of 11 | $734,365 | +33% |
| 30 SEP 2021 | 210511 | HOL | HOL-SR 520-11.80/12.91 (SLIDE REPAIR) | 9 of 14 | $1,453,982 | +17% |
| 27 MAY 2021 | 210328 | ASD | ASD-US 250-11.61 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 5 | $927,991 | Low, 5.0% under the second |
| 28 JAN 2021 | 210061 | HOL | HOL-US 62/VAR-05.06/VAR (CULVERT REPLACEMENT) | 2 of 12 | $399,964 | +12% |
| 14 JAN 2021 | 210003 | ASD | ASD-SR 302-09.34 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 12 | $773,963 | +9.0% |
| 19 NOV 2020 | 200549 | MED | MED-US 42-02.47 (BRIDGE REPLACEMENT (1 BRIDGE)) | 10 of 13 | $1,009,985 | +21% |
| 01 OCT 2020 | 200471 | HOL | HOL-SR 83-09.98 (CULVERT REPLACEMENT) | 4 of 11 | $253,879 | +8.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.