ODOT contract 250589 bid tabulation
LAW-SR 243-04.38 (CULVERT REPLACEMENT). Let by Ohio DOT on December 18, 2025, LAW. 4 bids received; low bid $289,778 by Axis Civil Construction LLC, +11% against the engineer's estimate of $262,000.
- Owner
- Ohio DOT
- Letting
- 18 DEC 2025
- Pay items
- 48
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Axis Civil Construction LLC | $289,778 | Low | +11% |
| 2 | D G M Inc | $327,549 | +13% | +25% |
| 3 | Scioto Valley Paving LLC | $331,473 | +14% | +27% |
| 4 | R C Construction Company and Son Inc | $424,654 | +47% | +62% |
Engineer's estimate: $262,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Axis Civil Construction LLC | 2. D G M Inc | 3. Scioto Valley Paving LLC | 4. R C Construction Company and Son Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $8,000.00 | $12,000 | $4,500.00 | $2,500.00 |
| 2 | Headwall removed (202E20010) | EACH | 1 | $850.00 | $500.00 | $250.00 | $1,500.00 |
| 3 | Pavement removed (202E23000) | SY | 592 | $15.00 | $15.00 | $18.00 | $45.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 50 | $25.00 | $25.00 | $125.00 | $100.00 |
| 5 | Removal misc.: metal post removed (202E98100) | EACH | 5 | $65.00 | $20.00 | $100.00 | $500.00 |
| 6 | Embankment (203E20000) | CY | 90 | $40.00 | $40.00 | $100.00 | $50.00 |
| 7 | Subgrade compaction (204E10000) | SY | 592 | $2.50 | $8.00 | $6.00 | $2.00 |
| 8 | Special - mailbox support system, single (690E50100) | EACH | 1 | $355.00 | $250.00 | $300.00 | $400.00 |
| 9 | Special - mailbox support system, double (690E50200) | EACH | 1 | $355.00 | $350.00 | $300.00 | $650.00 |
| 10 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 8 | $160.00 | $200.00 | $500.00 | $250.00 |
| 11 | Seeding and mulching (659E10000) | SY | 425 | $5.00 | $7.00 | $4.50 | $10.00 |
| 12 | Repair seeding and mulching (659E14000) | SY | 22 | $5.00 | $0.05 | $4.50 | $0.20 |
| 13 | Commercial fertilizer (659E20000) | TON | 0.06 | $1,250.00 | $2,000.00 | $1,200.00 | $2,500.00 |
| 14 | Lime (659E31000) | ACRE | 0.10 | $650.00 | $300.00 | $1,200.00 | $2,000.00 |
| 15 | Water (659E35000) | MGAL | 2 | $1.00 | $1.00 | $1.00 | $1.00 |
| 16 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 17 | Structure removed (202E11000) | LS | 1 | $10,000 | $16,000 | $20,000 | $10,000 |
| 18 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $5,000.00 | $500.00 | $10,000 | $15,000 |
| 19 | Concrete masonry (602E20000) | CY | 1.29 | $6,400.00 | $2,500.00 | $3,500.00 | $3,200.00 |
| 20 | 4" conduit, type F (611E00406) | FT | 20 | $45.00 | $10.00 | $40.00 | $25.00 |
| 21 | 12" conduit, type C (611E04600) | FT | 58 | $90.00 | $130.00 | $150.00 | $200.00 |
| 22 | 15" conduit, type B (611E05900) | FT | 41 | $145.00 | $160.00 | $300.00 | $300.00 |
| 23 | 15" conduit, type C (611E06100) | FT | 31 | $145.00 | $170.00 | $350.00 | $300.00 |
| 24 | 18" conduit, type C (611E07600) | FT | 6 | $250.00 | $325.00 | $400.00 | $375.00 |
| 25 | 48" conduit, type B (611E20900) | FT | 76 | $590.00 | $975.00 | $700.00 | $500.00 |
| 26 | Catch basin, no. 2-5 (611E98570) | EACH | 1 | $8,400.00 | $5,000.00 | $7,500.00 | $7,500.00 |
| 27 | Manhole, no. 3 (611E99574) | EACH | 1 | $8,000.00 | $2,200.00 | $7,500.00 | $8,500.00 |
| 28 | Pavement repair (253E02000) | CY | 15 | $250.00 | $625.00 | $100.00 | $25.00 |
| 29 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 116 | $350.00 | $330.00 | $375.00 | $600.00 |
| 30 | Aggregate base (304E20000) | CY | 102 | $130.00 | $90.00 | $130.00 | $175.00 |
| 31 | Tack coat (407E10000) | GAL | 47 | $6.00 | $2.50 | $1.00 | $10.00 |
| 32 | Stabilized crushed aggregate (411E10000) | CY | 16 | $220.00 | $150.00 | $200.00 | $150.00 |
| 33 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 59 | $400.00 | $325.00 | $450.00 | $650.00 |
| 34 | RPM (621E00100) | EACH | 1 | $2,500.00 | $2,500.00 | $1,200.00 | $2,500.00 |
| 35 | Raised pavement marker removed (621E54000) | EACH | 1 | $65.00 | $1.00 | $35.00 | $50.00 |
| 36 | Ground mounted support, no. 2 post (630E02100) | FT | 10 | $75.00 | $45.00 | $15.00 | $50.00 |
| 37 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $95.00 | $350.00 | $250.00 | $250.00 |
| 38 | Edge line, 6", type 1 (642E00104) | MI | 0.03 | $24,500 | $26,000 | $53,366 | $65,000 |
| 39 | Center line, type 1 (642E00300) | MI | 0.02 | $36,000 | $38,000 | $80,049 | $85,000 |
| 40 | Stop line, type 1 (642E00500) | FT | 16 | $12.00 | $15.00 | $50.00 | $100.00 |
| 41 | Detour signing (614E12420) | LS | 1 | $3,800.00 | $10,000 | $6,500.00 | $35,000 |
| 42 | Water (616E10000) | MGAL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 43 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,000.00 | $18,000 | $10,000 | $16,500 |
| 44 | Maintaining traffic (614E11000) | LS | 1 | $20,000 | $36,000 | $6,500.00 | $25,000 |
| 45 | Construction layout stakes and surveying (623E10000) | LS | 1 | $8,000.00 | $4,000.00 | $6,500.00 | $15,000 |
| 46 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $800.00 | $1,000.00 | $2,000.00 | $2,500.00 |
| 47 | Post construction survey monument verification and report (623E51000) | LS | 1 | $800.00 | $1,000.00 | $2,000.00 | $2,500.00 |
| 48 | Mobilization (624E10000) | LS | 1 | $25,000 | $10,000 | $20,000 | $15,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.