ODOT contract 260247 bid tabulation
ROS-SR 207-08.31 (CULVERT REPLACEMENT). Let by Ohio DOT on May 7, 2026, ROS. 4 bids received; low bid $343,332 by Axis Civil Construction LLC, -25% against the engineer's estimate of $456,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 47
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Axis Civil Construction LLC | $343,332 | Low | -25% |
| 2 | Fillmore Construction | $416,797 | +21% | -9.0% |
| 3 | R C Construction Company and Son Inc | $433,745 | +26% | -5.0% |
| 4 | Sunesis Construction Co | $456,806 | +33% | 0.0% |
Engineer's estimate: $456,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Axis Civil Construction LLC | 2. Fillmore Construction | 3. R C Construction Company and Son Inc | 4. Sunesis Construction Co |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $3,000.00 | $5,000.00 | $4,500.00 | $5,678.82 |
| 2 | Pavement removed (202E23000) | SY | 478 | $15.00 | $10.00 | $20.00 | $23.32 |
| 3 | Guardrail removed (202E38000) | FT | 204 | $9.00 | $10.00 | $5.00 | $11.38 |
| 4 | Anchor assembly removed, type A (202E42000) | EACH | 4 | $450.00 | $500.00 | $500.00 | $284.85 |
| 5 | Fence removed (202E75000) | FT | 290 | $3.50 | $10.00 | $10.00 | $5.41 |
| 6 | Removal misc.:metal posts (202E98100) | EACH | 5 | $10.00 | $50.00 | $100.00 | $48.25 |
| 7 | Removal misc.:retaining wall (202E98200) | FT | 48 | $30.00 | $100.00 | $100.00 | $52.35 |
| 8 | Excavation (203E10000) | CY | 362 | $22.00 | $30.00 | $25.00 | $18.46 |
| 9 | Embankment (203E20000) | CY | 678 | $22.00 | $34.00 | $25.00 | $28.17 |
| 10 | Subgrade compaction (204E10000) | SY | 634 | $2.50 | $5.00 | $2.00 | $6.07 |
| 11 | Reference monument, type A (623E40500) | EACH | 6 | $750.00 | $1,000.00 | $1,000.00 | $770.79 |
| 12 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 124 | $56.00 | $80.00 | $25.00 | $142.07 |
| 13 | Seeding and mulching (659E10000) | SY | 1,481 | $2.20 | $2.00 | $10.00 | $2.90 |
| 14 | Repair seeding and mulching (659E14000) | SY | 74 | $2.20 | $2.20 | $0.20 | $2.51 |
| 15 | Commercial fertilizer (659E20000) | TON | 0.20 | $1,250.00 | $1,400.00 | $2,000.00 | $1,597.50 |
| 16 | Lime (659E31000) | ACRE | 0.31 | $150.00 | $450.00 | $1,800.00 | $513.48 |
| 17 | Water (659E35000) | MGAL | 9 | $1.00 | $10.00 | $1.00 | $1.39 |
| 18 | Erosion control (832E30000) | EACH | 13,700 | $1.00 | $1.00 | $1.00 | $1.00 |
| 19 | Structure removed (202E11000) | LS | 1 | $8,500.00 | $7,500.00 | $15,000 | $9,821.21 |
| 20 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $8,500.00 | $7,500.00 | $15,000 | $11,389 |
| 21 | Unclassified excavation (503E21300) | LS | 1 | $7,500.00 | $7,500.00 | $15,000 | $18,844 |
| 22 | Porous backfill with geotextile fabric (518E21200) | CY | 10 | $150.00 | $180.00 | $275.00 | $255.47 |
| 23 | Rock channel protection, type B with aggregate filter (601E32110) | CY | 30 | $120.00 | $180.00 | $250.00 | $206.11 |
| 24 | Concrete masonry (602E20000) | CY | 35 | $1,365.00 | $2,000.00 | $1,400.00 | $1,612.70 |
| 25 | Aggregate drains (605E31100) | FT | 63 | $20.00 | $30.00 | $40.00 | $25.94 |
| 26 | 72" conduit, type A, as per plan , see P.18 for AL (611E26001) | FT | 80 | $715.00 | $900.00 | $650.00 | $631.98 |
| 27 | Full depth pavement sawing (252E01500) | FT | 52 | $4.00 | $20.00 | $100.00 | $26.92 |
| 28 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 96 | $285.00 | $210.00 | $350.00 | $295.00 |
| 29 | Aggregate base (304E20000) | CY | 84 | $105.00 | $100.00 | $175.00 | $113.69 |
| 30 | Tack coat (407E10000) | GAL | 94 | $7.00 | $5.00 | $20.00 | $4.50 |
| 31 | Stabilized crushed aggregate (411E10000) | CY | 30 | $141.00 | $100.00 | $175.00 | $170.05 |
| 32 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 57 | $280.00 | $280.00 | $425.00 | $325.00 |
| 33 | RPM (621E00100) | EACH | 6 | $295.00 | $296.00 | $950.00 | $296.00 |
| 34 | Raised pavement marker removed (621E54000) | EACH | 6 | $50.00 | $10.00 | $100.00 | $48.83 |
| 35 | Edge line, 6", type 1 (642E00104) | MI | 0.12 | $12,070 | $12,070 | $18,500 | $12,070 |
| 36 | Center line, type 1 (642E00300) | MI | 0.06 | $18,100 | $18,100 | $35,000 | $18,100 |
| 37 | Pavement repair (253E02000) | CY | 50 | $180.00 | $400.00 | $25.00 | $687.71 |
| 38 | Tack coat (407E10000) | GAL | 110 | $6.00 | $5.00 | $1.00 | $4.50 |
| 39 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 50 | $185.00 | $400.00 | $25.00 | $375.00 |
| 40 | Detour signing (614E12420) | LS | 1 | $8,000.00 | $7,150.00 | $20,000 | $8,505.57 |
| 41 | Asphalt concrete for maintaining traffic (614E13000) | CY | 50 | $190.00 | $400.00 | $25.00 | $338.25 |
| 42 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,500.00 | $7,500.00 | $16,500 | $3,289.01 |
| 43 | Maintaining traffic (614E11000) | LS | 1 | $5,000.00 | $5,000.00 | $20,000 | $4,855.57 |
| 44 | Construction layout stakes and surveying (623E10000) | LS | 1 | $8,500.00 | $5,000.00 | $10,000 | $9,200.00 |
| 45 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $800.00 | $2,500.00 | $1,500.00 | $1,400.00 |
| 46 | Post construction survey monument verification and report (623E51000) | LS | 1 | $800.00 | $2,500.00 | $1,500.00 | $1,400.00 |
| 47 | Mobilization (624E10000) | LS | 1 | $20,000 | $7,500.00 | $15,000 | $37,108 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.