ROS-SR 138-17.28 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on November 13, 2025, ROS. 7 bids received; low bid $2,457,993 by Alan Stone Co Inc, -1.7% against the engineer's estimate of $2,500,000.
- Owner
- Ohio DOT
- Letting
- 13 NOV 2025
- Pay items
- 74
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Alan Stone Co Inc | $2,457,993 | Low | -2.0% |
| 2 | Shelly & Sands Inc | $2,574,069 | +5.0% | +3.0% |
| 3 | Sunesis Construction Co | $2,695,370 | +10% | +8.0% |
| 4 | Double Z Construction Company | $2,793,446 | +14% | +12% |
| 5 | Complete General Construction Company | $2,883,894 | +17% | +15% |
| 6 | George J Igel & Co Inc | $2,955,273 | +20% | +18% |
| 7 | D G M Inc | $3,309,765 | +35% | +32% |
Engineer's estimate: $2,500,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alan Stone Co Inc | 2. Shelly & Sands Inc | 3. Sunesis Construction Co | 4. Double Z Construction Company | 5. Complete General Construction Company | 6. George J Igel & Co Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $25,000 | $35,000 | $19,013 | $25,000 | $30,000 | $46,000 |
| 2 | Pavement removed (202E23000) | SY | 808 | $15.00 | $25.00 | $11.57 | $18.00 | $19.00 | $14.25 |
| 3 | Guardrail removed (202E38000) | FT | 558 | $4.00 | $3.00 | $2.80 | $3.00 | $2.60 | $3.25 |
| 4 | Excavation (203E10000) | CY | 2,688 | $20.00 | $30.00 | $26.56 | $40.00 | $27.00 | $17.50 |
| 5 | Embankment (203E20000) | CY | 1,753 | $10.00 | $22.00 | $14.66 | $15.00 | $31.00 | $6.15 |
| 6 | Granular material, type C (203E35120) | CY | 2,846 | $75.00 | $109.00 | $96.05 | $50.00 | $70.00 | $70.00 |
| 7 | Subgrade compaction (204E10000) | SY | 1,756 | $3.50 | $6.00 | $3.69 | $5.00 | $4.00 | $3.40 |
| 8 | Proof rolling (204E45000) | HR | 1 | $260.00 | $300.00 | $277.88 | $200.00 | $140.00 | $131.50 |
| 9 | Guardrail, type MGS (606E15050) | FT | 462.50 | $25.00 | $25.00 | $25.00 | $24.40 | $24.40 | $24.98 |
| 10 | Anchor assembly, MGS type E (606E26150) | EACH | 2 | $2,700.00 | $2,950.00 | $2,500.00 | $2,950.00 | $2,950.00 | $1,200.00 |
| 11 | Anchor assembly, type T (606E26500) | EACH | 2 | $1,400.00 | $940.00 | $1,250.00 | $940.00 | $940.00 | $2,400.00 |
| 12 | Special - mailbox support (690E50000) | EACH | 1 | $550.00 | $210.00 | $114.49 | $210.00 | $210.00 | $320.00 |
| 13 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 20 | $120.00 | $75.00 | $118.66 | $110.00 | $130.00 | $61.16 |
| 14 | Rock channel protection, type C with filter (601E32200) | CY | 116 | $130.00 | $120.00 | $216.11 | $215.00 | $135.00 | $120.00 |
| 15 | Soil analysis test (659E00100) | EACH | 2 | $220.00 | $150.00 | $125.00 | $150.00 | $150.00 | $150.00 |
| 16 | Topsoil (659E00300) | CY | 162 | $40.00 | $65.00 | $71.63 | $65.00 | $50.00 | $6.05 |
| 17 | Seeding and mulching (659E10000) | SY | 1,459 | $3.00 | $2.25 | $3.26 | $8.00 | $2.25 | $5.00 |
| 18 | Repair seeding and mulching (659E14000) | SY | 73 | $1.00 | $2.25 | $2.20 | $2.25 | $2.25 | $2.25 |
| 19 | Commercial fertilizer (659E20000) | TON | 0.20 | $1,600.00 | $1,250.00 | $1,400.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 20 | Lime (659E31000) | ACRE | 0.30 | $220.00 | $150.00 | $450.00 | $150.00 | $150.00 | $150.00 |
| 21 | Water (659E35000) | MGAL | 8 | $1.00 | $1.00 | $1.39 | $1.00 | $1.00 | $1.00 |
| 22 | Erosion control (832E30000) | EACH | 1,530 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | Aggregate drains (605E31100) | FT | 99 | $40.00 | $20.00 | $23.26 | $25.00 | $38.00 | $41.50 |
| 24 | 6" conduit, type E (611E01400) | FT | 50 | $25.00 | $14.00 | $15.33 | $8.00 | $25.00 | $24.50 |
| 25 | 6" conduit, type F (611E01500) | FT | 50 | $30.00 | $14.00 | $15.33 | $8.00 | $30.00 | $24.50 |
| 26 | 8" conduit, type B (611E01800) | FT | 50 | $30.00 | $25.00 | $37.79 | $16.00 | $35.00 | $32.90 |
| 27 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 273 | $260.00 | $225.00 | $225.00 | $265.00 | $265.00 | $225.00 |
| 28 | Aggregate base (304E20000) | CY | 284 | $90.00 | $110.00 | $87.41 | $98.00 | $120.00 | $78.15 |
| 29 | Tack coat (407E10000) | GAL | 177 | $5.00 | $3.50 | $3.50 | $4.50 | $4.50 | $3.50 |
| 30 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 134 | $310.00 | $350.00 | $350.00 | $290.00 | $290.00 | $350.00 |
| 31 | Pipe removed, 24" and under (202E35100) | FT | 201 | $25.00 | $12.00 | $19.27 | $55.00 | $35.20 | $3.00 |
| 32 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $45,000 | $50,000 | $14,730 | $85,000 | $200,000 | $25,000 |
| 33 | 6" water main ductile iron pipe ansi class 52, boltless-restrained joints and fittings, as per plan (638E00801) | FT | 208 | $260.00 | $210.00 | $250.72 | $425.00 | $225.00 | $975.00 |
| 34 | 16" steel pipe encasement, open cut (638E06700) | FT | 30 | $95.00 | $625.00 | $237.93 | $200.00 | $350.00 | $400.00 |
| 35 | 16" steel pipe encasement, bored or jacked, as per plan (638E07301) | FT | 53 | $1,300.00 | $1,400.00 | $1,109.26 | $1,650.00 | $2,000.00 | $1,500.00 |
| 36 | 6" inserting valve and valve box (638E08400) | EACH | 1 | $8,300.00 | $17,500 | $11,156 | $16,000 | $7,500.00 | $16,000 |
| 37 | Barrier reflector, type 3, bidirectional (626E00112) | EACH | 9 | $15.00 | $13.00 | $12.50 | $13.80 | $13.80 | $15.00 |
| 38 | Removal of ground mounted sign and reerection (630E85100) | EACH | 4 | $110.00 | $268.00 | $100.00 | $300.00 | $75.00 | $50.00 |
| 39 | Removal of ground mounted post support and reerection (630E86010) | EACH | 4 | $220.00 | $241.00 | $200.00 | $300.00 | $225.00 | $50.00 |
| 40 | Edge line, 6", type 1 (642E00104) | MI | 0.16 | $7,900.00 | $7,200.00 | $4,200.00 | $6,750.00 | $4,200.00 | $6,750.00 |
| 41 | Center line, type 1 (642E00300) | MI | 0.12 | $10,000 | $9,000.00 | $4,200.00 | $9,000.00 | $4,200.00 | $9,000.00 |
| 42 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 8 | $2,300.00 | $2,580.00 | $1,846.75 | $1,850.00 | $1,900.00 | $2,200.00 |
| 43 | Barrier reflector, type 1 (two way) (614E13310) | EACH | 24 | $55.00 | $7.00 | $10.76 | $19.00 | $11.00 | $45.00 |
| 44 | Object marker, two way (614E13360) | EACH | 24 | $55.00 | $15.00 | $19.88 | $20.00 | $20.00 | $45.00 |
| 45 | Work zone edge line, class I, 6" (614E22010) | MI | 0.42 | $6,200.00 | $5,250.00 | $9,500.00 | $5,250.00 | $9,500.00 | $5,250.00 |
| 46 | Work zone stop line, class I (614E26000) | FT | 50 | $15.00 | $14.00 | $10.00 | $14.00 | $10.00 | $14.00 |
| 47 | Roads for maintaining traffic (615E10000) | LS | 1 | $20,000 | $15,000 | $11,569 | $45,000 | $30,000 | $16,500 |
| 48 | Pavement for maintaining traffic, class A (615E20000) | SY | 370 | $95.00 | $110.00 | $92.16 | $100.00 | $80.00 | $85.00 |
| 49 | Water (616E10000) | MGAL | 9 | $0.10 | $50.00 | $15.09 | $40.00 | $160.00 | $57.25 |
| 50 | Portable barrier, unanchored (622E41100) | FT | 420 | $35.00 | $35.00 | $21.02 | $28.00 | $44.00 | $35.00 |
| 51 | Structure removed, over 20 foot span, as per plan (202E11003) | LS | 1 | $75,000 | $110,000 | $79,083 | $120,000 | $100,000 | $136,000 |
| 52 | Approach slab removed (202E22900) | SY | 112 | $110.00 | $50.00 | $36.12 | $60.00 | $60.00 | $55.00 |
| 53 | Wearing course removed (202E23500) | SY | 586 | $2.50 | $23.00 | $8.96 | $20.00 | $20.00 | $23.00 |
| 54 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $200,000 | $165,000 | $214,590 | $300,000 | $275,000 | $236,500 |
| 55 | Unclassified excavation (503E21300) | LS | 1 | $50,000 | $12,000 | $11,407 | $50,000 | $42,000 | $135,000 |
| 56 | Pile driving equipment mobilization (505E11100) | LS | 1 | $35,600 | $25,000 | $21,282 | $40,500 | $25,000 | $75,000 |
| 57 | 14" cast-in-place reinforced concrete piles, driven (507E00600) | FT | 2,100 | $35.00 | $58.00 | $43.47 | $19.00 | $10.00 | $55.00 |
| 58 | 14" cast-in-place reinforced concrete piles, furnished (507E00650) | FT | 2,400 | $45.00 | $42.00 | $58.97 | $70.00 | $75.00 | $45.00 |
| 59 | Epoxy coated steel reinforcement (509E10000) | LB | 29,500 | $1.50 | $2.00 | $2.12 | $2.40 | $2.75 | $2.15 |
| 60 | Class QC1 concrete with QC/QA, retaining/wingwall not including footing (511E46012) | CY | 102 | $950.00 | $1,000.00 | $1,623.77 | $1,300.00 | $1,500.00 | $1,000.00 |
| 61 | Class QC1 concrete, footing (511E46510) | CY | 141 | $650.00 | $600.00 | $872.93 | $800.00 | $700.00 | $915.00 |
| 62 | Class QC1 concrete with QC/QA, headwall (511E46612) | CY | 44 | $1,300.00 | $1,500.00 | $1,826.17 | $1,750.00 | $1,800.00 | $1,500.00 |
| 63 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 204 | $35.00 | $32.00 | $35.49 | $48.00 | $32.00 | $30.00 |
| 64 | Type 2 waterproofing (512E33000) | SY | 502 | $30.00 | $28.00 | $28.50 | $19.00 | $28.50 | $29.00 |
| 65 | 1" preformed expansion joint filler (516E13600) | SF | 15 | $2.00 | $12.00 | $4.74 | $10.00 | $15.00 | $9.50 |
| 66 | Porous backfill with geotextile fabric (518E21200) | CY | 115 | $60.00 | $130.00 | $121.90 | $160.00 | $145.00 | $125.00 |
| 68 | Conduit, type A, precast reinforced concrete arch sections (611E71000) | FT | 56 | $10,000 | $7,500.00 | $10,151 | $7,750.00 | $7,000.00 | $9,250.00 |
| 69 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,000 | $15,000 | $14,524 | $18,000 | $18,000 | $14,000 |
| 70 | Maintaining traffic (614E11000) | LS | 1 | $78,000 | $50,000 | $73,074 | $80,000 | $90,000 | $83,000 |
| 71 | Field office, type A (619E16000) | MNTH | 4 | $2,500.00 | $4,000.00 | $3,497.50 | $2,000.00 | $3,300.00 | $1,505.00 |
| 72 | Construction layout stakes and surveying (623E10000) | LS | 1 | $16,000 | $20,000 | $30,800 | $18,000 | $30,000 | $17,000 |
| 73 | Mobilization (624E10000) | LS | 1 | $65,000 | $125,000 | $103,935 | $100,000 | $135,000 | $145,000 |
| 100 | Portable barrier, anchored (622E41110) | FT | 470 | $50.00 | $50.00 | $20.92 | $22.00 | $50.00 | $31.00 |
| 101 | Dynamic load testing (523E20000) | EACH | 1 | $4,400.00 | $4,700.00 | $8,112.28 | $4,700.00 | $5,000.00 | $5,379.20 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.