ODOT contract 260238 bid tabulation
HAM-Columbia Connector (BIKEWAYS). Let by Ohio DOT on May 7, 2026, HAM. 3 bids received; low bid $2,009,547 by Sunesis Construction Co, +1.0% against the engineer's estimate of $1,990,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 123
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Sunesis Construction Co | $2,009,547 | Low | +1.0% |
| 2 | KT Holden Construction LLC | $2,172,181 | +8.0% | +9.0% |
| 3 | Prus Construction Company | $2,236,975 | +11% | +12% |
Engineer's estimate: $1,990,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sunesis Construction Co | 2. KT Holden Construction LLC | 3. Prus Construction Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $68,000 | $98,700 | $98,000 |
| 2 | Pavement removed (202E23000) | SY | 7 | $55.10 | $50.00 | $98.00 |
| 3 | Walk removed (202E30000) | SF | 4,364 | $2.32 | $4.50 | $3.00 |
| 4 | Curb removed (202E32000) | FT | 269 | $10.00 | $15.00 | $27.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 77 | $11.50 | $46.00 | $51.00 |
| 6 | Fence removed (202E75000) | FT | 240 | $4.33 | $3.60 | $4.00 |
| 7 | Excavation (203E10000) | CY | 2,783 | $20.88 | $30.00 | $28.50 |
| 8 | Embankment (203E20000) | CY | 1,358 | $9.31 | $24.00 | $27.50 |
| 9 | Subgrade compaction (204E10000) | SY | 5,578 | $2.73 | $3.00 | $3.50 |
| 10 | Excavation of subgrade (204E13000) | CY | 723 | $43.36 | $48.50 | $41.00 |
| 11 | Granular material, type C (204E30020) | CY | 723 | $100.60 | $84.00 | $98.00 |
| 12 | Proof rolling (204E45000) | HR | 2 | $221.21 | $350.00 | $150.00 |
| 13 | Geotextile fabric (204E50000) | SY | 2,169 | $1.93 | $4.00 | $3.40 |
| 14 | Fence, snow (607E30000) | FT | 200 | $4.31 | $7.50 | $9.00 |
| 15 | Fence, misc.: wood fence (607E98000) | FT | 1,133 | $67.21 | $52.00 | $57.00 |
| 16 | 4" concrete walk (608E10000) | SF | 192 | $10.85 | $14.00 | $15.85 |
| 17 | Concrete steps, type A (608E40000) | FT | 56 | $285.55 | $350.00 | $180.00 |
| 18 | Curb ramp (608E52000) | SF | 3,369 | $26.04 | $25.00 | $16.00 |
| 19 | Rock channel protection, type B with filter (601E32100) | CY | 7 | $177.59 | $300.00 | $380.00 |
| 20 | Soil analysis test (659E00100) | EACH | 2 | $75.00 | $75.00 | $275.00 |
| 21 | Topsoil (659E00300) | CY | 605 | $48.71 | $65.00 | $98.00 |
| 22 | Seeding and mulching (659E10000) | SY | 2,778 | $3.91 | $2.30 | $1.35 |
| 23 | Seeding and mulching, as per plan (659E10001) | SY | 3,085 | $4.19 | $3.00 | $3.70 |
| 24 | Seeding and mulching, as per plan (659E10001) | SY | 1,030 | $5.39 | $4.50 | $4.50 |
| 25 | Commercial fertilizer (659E20000) | TON | 0.73 | $760.00 | $760.00 | $1,020.00 |
| 26 | Lime (659E31000) | ACRE | 1.13 | $50.00 | $50.00 | $82.50 |
| 27 | Water (659E35000) | MGAL | 30 | $50.00 | $50.00 | $1.10 |
| 28 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,500.00 | $4,000.00 | $3,500.00 |
| 29 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $10,800 | $18,190 | $18,500 |
| 30 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $15,611 | $16,000 | $20,000 |
| 31 | Erosion control (832E30000) | EACH | 47,377 | $1.00 | $1.00 | $1.00 |
| 32 | Concrete masonry (602E20000) | CY | 1 | $4,072.98 | $7,200.00 | $6,750.00 |
| 33 | 6" construction underdrains, as per plan (605E11001) | FT | 1,664 | $26.38 | $26.00 | $25.00 |
| 34 | 12" conduit, type B (611E04400) | FT | 89 | $111.65 | $100.00 | $152.00 |
| 35 | 12" conduit, type C (611E04600) | FT | 93 | $89.03 | $60.00 | $153.00 |
| 36 | 15" conduit, type B (611E05900) | FT | 6 | $387.42 | $500.00 | $365.00 |
| 37 | 36" conduit, type B (611E16400) | FT | 16 | $479.50 | $400.00 | $675.00 |
| 38 | 36" conduit, type C (611E16600) | FT | 26 | $250.95 | $250.00 | $460.00 |
| 39 | Slotted drain, type 2, 12" (611E97010) | FT | 32 | $266.91 | $315.00 | $360.00 |
| 40 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $2,095.60 | $2,000.00 | $3,700.00 |
| 41 | Manhole, no. 3 (611E99574) | EACH | 1 | $6,633.42 | $8,000.00 | $17,500 |
| 42 | Manhole adjusted to grade (611E99654) | EACH | 1 | $485.02 | $1,000.00 | $1,120.00 |
| 43 | Pavement repair (253E02000) | CY | 30 | $470.85 | $570.00 | $520.00 |
| 44 | Aggregate base (304E20000) | CY | 1,526 | $92.29 | $108.00 | $108.00 |
| 45 | Tack coat (407E10000) | GAL | 272 | $8.50 | $8.50 | $10.00 |
| 46 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 14 | $341.63 | $400.00 | $375.00 |
| 47 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 14 | $278.93 | $335.00 | $310.00 |
| 48 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 15 | $100.00 | $150.00 | $230.00 |
| 49 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 90 | $45.41 | $47.00 | $64.00 |
| 50 | Curb, type 6 (609E26000) | FT | 93 | $35.23 | $38.00 | $54.00 |
| 51 | Curb, type 7 (609E28000) | FT | 76 | $34.00 | $44.00 | $66.00 |
| 52 | Asphalt concrete surface course, type 1, (449) (823E40000) | CY | 190 | $341.63 | $355.00 | $376.00 |
| 53 | Asphalt concrete intermediate course, type 2, (449) (823E42000) | CY | 311 | $278.93 | $287.00 | $307.00 |
| 54 | Valve box adjusted to grade (638E10800) | EACH | 9 | $87.89 | $300.00 | $650.00 |
| 55 | Ground mounted support, no. 3 post (630E03100) | FT | 165.30 | $15.50 | $16.54 | $17.00 |
| 56 | Sign post reflector (630E08600) | EACH | 2 | $55.00 | $58.39 | $60.50 |
| 57 | Sign support assembly, pole mounted (630E79500) | EACH | 3 | $55.00 | $114.48 | $60.50 |
| 58 | Sign, flat sheet (630E80100) | SF | 61.20 | $16.00 | $19.31 | $17.60 |
| 59 | Sign, flat sheet, as per plan (630E80101) | SF | 3.80 | $16.00 | $21.07 | $17.60 |
| 60 | Removal of ground mounted sign and disposal (630E84900) | EACH | 4 | $20.00 | $16.56 | $22.00 |
| 61 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $45.00 | $64.22 | $49.50 |
| 62 | Removal of ground mounted post support and disposal (630E86002) | EACH | 6 | $25.00 | $22.08 | $27.50 |
| 63 | Removal of pole mounted sign and disposal (630E87500) | EACH | 2 | $20.00 | $16.56 | $22.00 |
| 64 | Center line (644E00300) | MI | 0.06 | $8,415.00 | $4,500.00 | $11,990 |
| 65 | Stop line (644E00500) | FT | 52 | $10.50 | $14.00 | $8.80 |
| 66 | Crosswalk line, 24" (644E00630) | FT | 1,068 | $8.40 | $12.00 | $8.10 |
| 67 | Word on pavement, 48" (644E01382) | EACH | 2 | $386.00 | $150.00 | $341.00 |
| 68 | Special - bollard, hinged (690E50610) | EACH | 2 | $1,391.61 | $885.00 | $1,100.00 |
| 69 | Conduit, 2", 725.051 (625E25408) | FT | 7 | $30.25 | $30.25 | $34.00 |
| 70 | Sign, flat sheet (630E80100) | SF | 1.50 | $28.50 | $28.50 | $32.00 |
| 71 | Removal of pole mounted sign and disposal (630E87500) | EACH | 1 | $15.18 | $100.00 | $110.00 |
| 72 | Accessible pedestrian pushbutton (632E20750) | EACH | 1 | $1,250.00 | $2,500.00 | $1,375.00 |
| 73 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 180 | $4.25 | $4.25 | $4.70 |
| 74 | Loop detector lead-in cable, 2 conductor, no. 14 AWG (632E65300) | FT | 180 | $3.25 | $3.25 | $3.60 |
| 75 | Pedestal, misc.:transformer base and foundation (632E90010) | EACH | 1 | $5,000.00 | $5,000.00 | $5,500.00 |
| 76 | Reuse of pedestrian signal head, as per plan (632E90203) | EACH | 1 | $500.00 | $500.00 | $550.00 |
| 77 | Reuse of signal support, as per plan (632E90207) | EACH | 1 | $195.00 | $195.00 | $215.00 |
| 78 | Signalization, misc.: unlash and relash messenger (632E90500) | FT | 90 | $18.85 | $18.85 | $21.00 |
| 79 | Deciduous tree, 2" caliper, as per plan, ( acer RU (661E40081) | EACH | 5 | $600.00 | $600.00 | $1,094.50 |
| 80 | Deciduous tree, 2" caliper, as per plan, (acer sac (661E40081) | EACH | 5 | $680.00 | $680.00 | $1,094.50 |
| 81 | Deciduous tree, 2" caliper, as per plan, (aesculus (661E40081) | EACH | 5 | $670.00 | $670.00 | $1,094.50 |
| 82 | Deciduous tree, 2" caliper, as per plan, (asmina T (661E40081) | EACH | 5 | $750.00 | $750.00 | $1,094.50 |
| 83 | Deciduous tree, 2" caliper, as per plan, (carya CO (661E40081) | EACH | 5 | $800.00 | $800.00 | $1,094.50 |
| 84 | Deciduous tree, 2" caliper, as per plan, (carya GL (661E40081) | EACH | 5 | $800.00 | $800.00 | $1,094.50 |
| 85 | Deciduous tree, 2" caliper, as per plan, (carya LA (661E40081) | EACH | 5 | $800.00 | $800.00 | $1,094.50 |
| 86 | Deciduous tree, 2" caliper, as per plan, (carya OV (661E40081) | EACH | 5 | $800.00 | $800.00 | $1,094.50 |
| 87 | Deciduous tree, 2" caliper, as per plan, (celtis O (661E40081) | EACH | 5 | $600.00 | $600.00 | $1,094.50 |
| 88 | Deciduous tree, 2" caliper, as per plan, (cercis C (661E40081) | EACH | 5 | $680.00 | $680.00 | $1,094.50 |
| 89 | Deciduous tree, 2" caliper, as per plan, (gymnocla (661E40081) | EACH | 5 | $670.00 | $670.00 | $1,094.50 |
| 90 | Deciduous tree, 2" caliper, as per plan, (juglans (661E40081) | EACH | 5 | $800.00 | $800.00 | $1,094.50 |
| 91 | Deciduous tree, 2" caliper, as per plan, (lirioden (661E40081) | EACH | 5 | $670.00 | $670.00 | $1,094.50 |
| 92 | Deciduous tree, 2" caliper, as per plan, (plantanu (661E40081) | EACH | 5 | $600.00 | $600.00 | $1,094.50 |
| 93 | Deciduous tree, 2" caliper, as per plan, (populus (661E40081) | EACH | 5 | $670.00 | $670.00 | $1,094.50 |
| 94 | Deciduous tree, 2" caliper, as per plan, (quecus M (661E40081) | EACH | 5 | $660.00 | $660.00 | $1,094.50 |
| 95 | Deciduous tree, 2" caliper, as per plan, (quecus M (661E40081) | EACH | 5 | $645.00 | $645.00 | $1,094.50 |
| 96 | Deciduous tree, 2" caliper, as per plan, (quercus (661E40081) | EACH | 5 | $645.00 | $645.00 | $1,094.50 |
| 97 | Deciduous tree, 2-1/2" caliper, as per plan, (acer (661E40101) | EACH | 8 | $680.00 | $680.00 | $1,125.00 |
| 98 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 1 | $2,162.57 | $2,200.00 | $2,400.00 |
| 99 | Barrier reflector, type 1 (BI-directional) (614E13310) | EACH | 7 | $11.36 | $11.40 | $12.50 |
| 100 | Object marker, two way (614E13360) | EACH | 6 | $20.61 | $20.65 | $23.00 |
| 101 | Maintaining traffic, misc.:type 3 barricade with F (614E18000) | EACH | 2 | $382.64 | $305.00 | $340.00 |
| 102 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.22 | $20,265 | $11,235 | $21,890 |
| 103 | Water (616E10000) | MGAL | 9 | $13.47 | $36.00 | $10.00 |
| 104 | Portable barrier, unanchored (622E41100) | FT | 320 | $39.57 | $39.55 | $43.50 |
| 105 | Steel piles, misc.:soldier piles, W33X141 (507E00400) | FT | 990 | $274.46 | $270.00 | $169.00 |
| 106 | Porous backfill, as per plan (518E21101) | CY | 45 | $198.58 | $125.00 | $156.00 |
| 107 | Drilled shafts, 42" diameter, above bedrock, as per plan (524E94803) | FT | 650 | $281.85 | $265.00 | $281.00 |
| 108 | Special - structures: precast concrete panel 1 (530E00400) | EACH | 29 | $967.55 | $890.00 | $1,070.00 |
| 109 | Special - structures: precast concrete panel 2 (530E00400) | EACH | 75 | $958.53 | $895.00 | $1,088.00 |
| 110 | Special - structures: precast concrete panel 3 (530E00400) | EACH | 11 | $958.61 | $895.00 | $885.00 |
| 111 | Special - structures: precast concrete panel 4 (530E00400) | EACH | 1 | $957.69 | $890.00 | $1,080.00 |
| 112 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $8,300.23 | $2,020.00 | $6,100.00 |
| 113 | Galvanized steel reinforcement (509E26000) | LB | 1,535 | $4.64 | $4.00 | $2.85 |
| 114 | Dowel holes with cement grout (510E09950) | EACH | 146 | $15.52 | $25.00 | $33.00 |
| 115 | Class QC1 concrete, abutment (511E45710) | CY | 12 | $2,925.00 | $1,590.00 | $2,465.00 |
| 116 | Special - structures, misc.: prefabricated bridge (530E00200) | LS | 1 | $104,655 | $95,000 | $104,000 |
| 117 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $11,208 | $35,785 | $22,000 |
| 118 | Maintaining traffic (614E11000) | LS | 1 | $25,160 | $30,400 | $48,615 |
| 119 | Construction layout stakes and surveying (623E10000) | LS | 1 | $20,250 | $25,250 | $22,275 |
| 120 | Mobilization (624E10000) | LS | 1 | $50,622 | $108,975 | $100,000 |
| 121 | Special - concrete, misc; consultant for concrete (690E98400) | LS | 1 | $8,832.23 | $12,720 | $18,000 |
| 122 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $8,887.77 | $9,135.00 | $39,000 |
| 200 | CPM progress schedule (108E10000) | LS | 1 | $5,700.00 | $5,500.00 | $5,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.