ODOT contract 260349 bid tabulation
HAM-Inverts FY2027 (CULVERT REPLACEMENT). Let by Ohio DOT on July 30, 2026, HAM. 5 bids received; low bid $1,887,878 by Madex Construction Co, +19% against the engineer's estimate of $1,586,000.
- Owner
- Ohio DOT
- Letting
- 30 JUL 2026
- Pay items
- 44
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Madex Construction Co | $1,887,878 | Low | +19% |
| 2 | BCC Ohio Inc | $1,923,379 | +2.0% | +21% |
| 3 | KT Holden Construction LLC | $2,082,813 | +10% | +31% |
| 4 | Sunesis Construction Co | $2,825,074 | +50% | +78% |
| 5 | Stanley Miller Construction Company | $2,862,531 | +52% | +80% |
Engineer's estimate: $1,586,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Madex Construction Co | 2. BCC Ohio Inc | 3. KT Holden Construction LLC | 4. Sunesis Construction Co | 5. Stanley Miller Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $40,105 | $25,754 | $80,540 | $147,000 | $20,000 |
| 2 | Clearing and grubbing (201E11000) | LS | 1 | $33,158 | $15,609 | $69,910 | $111,000 | $20,000 |
| 3 | Clearing and grubbing (201E11000) | LS | 1 | $34,480 | $24,974 | $114,315 | $258,400 | $20,000 |
| 4 | Clearing and grubbing (201E11000) | LS | 1 | $37,789 | $12,487 | $82,920 | $101,550 | $20,000 |
| 5 | Special - pipe cleanout over 48" (202E70130) | FT | 427 | $92.30 | $70.77 | $500.00 | $224.26 | $400.00 |
| 6 | Removal misc.: gabion baskets (202E98500) | CY | 18 | $403.05 | $172.00 | $235.00 | $110.00 | $200.00 |
| 7 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $81,256 | $24,151 | $155,570 | $111,500 | $30,000 |
| 8 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $39,158 | $83,998 | $91,105 | $130,800 | $30,000 |
| 9 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $47,947 | $21,829 | $85,090 | $228,800 | $30,000 |
| 10 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $38,158 | $21,829 | $46,875 | $60,100 | $30,000 |
| 11 | Topsoil (659E00300) | CY | 1,015 | $26.84 | $57.90 | $75.00 | $50.00 | $90.00 |
| 12 | Seeding and mulching (659E10000) | SY | 9,147 | $0.97 | $1.07 | $1.07 | $5.40 | $10.00 |
| 13 | Commercial fertilizer (659E20000) | TON | 1.24 | $2,315.79 | $840.00 | $834.00 | $760.00 | $150.00 |
| 14 | Lime (659E31000) | ACRE | 1.90 | $1,157.89 | $71.93 | $1.00 | $50.00 | $200.00 |
| 15 | Water (659E35000) | MGAL | 49.40 | $20.53 | $0.16 | $1.00 | $50.00 | $50.00 |
| 16 | Erosion control (832E30000) | EACH | 8,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 17 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 4 | $3,473.68 | $2,893.68 | $2,100.00 | $2,050.00 | $10,000 |
| 18 | Portable changeable message sign, as per plan (614E18601) | SNMT | 2 | $1,736.84 | $2,298.00 | $1,155.00 | $1,155.00 | $7,500.00 |
| 19 | Portable barrier, unanchored (622E41100) | FT | 300 | $86.84 | $55.26 | $64.00 | $78.00 | $85.00 |
| 20 | Galvanized steel reinforcement (509E26000) | LB | 71 | $17.37 | $18.45 | $6.00 | $11.00 | $100.00 |
| 21 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 68 | $86.84 | $29.88 | $22.00 | $19.00 | $150.00 |
| 22 | Class QC1 concrete, retaining/wingwall not including footing, as per plan (511E46011) | CY | 2 | $3,357.89 | $10,773 | $4,250.00 | $8,500.00 | $5,000.00 |
| 23 | Patching concrete structure (519E11100) | SF | 46 | $347.37 | $223.50 | $210.00 | $236.00 | $1,000.00 |
| 24 | Slope protection, misc. filling voids with expansi (601E21150) | CY | 5 | $789.47 | $2,466.00 | $1,800.00 | $2,250.00 | $5,000.00 |
| 25 | Rock channel protection, type A without filter (601E34000) | CY | 15 | $550.00 | $326.60 | $450.00 | $450.00 | $500.00 |
| 26 | Rock channel protection, with grout, type A (601E34400) | CY | 40 | $665.79 | $555.00 | $840.00 | $570.00 | $500.00 |
| 27 | Conduit, misc.: repair method A (611E97700) | SF | 350 | $115.79 | $51.66 | $56.00 | $62.00 | $100.00 |
| 28 | Conduit, misc.: repair method B (611E97700) | SF | 62 | $318.42 | $233.40 | $190.00 | $150.00 | $1,000.00 |
| 29 | Field paving of existing pipe, 144" CMP (611E96550) | FT | 427 | $1,128.95 | $284.59 | $715.00 | $443.00 | $600.00 |
| 30 | Conduit, misc.: repair method A (611E97700) | SF | 395 | $115.79 | $51.66 | $45.00 | $72.50 | $105.00 |
| 31 | Conduit, misc.: repair method B (611E97700) | SF | 10 | $665.79 | $233.40 | $575.00 | $401.00 | $1,200.00 |
| 32 | Special - welded strap crack repair (690E98000) | EACH | 2 | $2,894.74 | $700.50 | $1,600.00 | $900.00 | $1,000.00 |
| 33 | Gabions (838E20700) | CY | 18 | $1,608.19 | $741.67 | $900.00 | $1,000.00 | $2,000.00 |
| 34 | Special - composite fiber wrap system (519E00100) | SF | 15,840 | $8.75 | $57.34 | $14.30 | $36.50 | $65.00 |
| 35 | Conduit, misc.: filling voids with expansive polyu (611E97600) | CY | 5 | $289.47 | $2,466.00 | $1,750.00 | $2,235.00 | $15,000 |
| 36 | Conduit, misc.: repair method A (611E97700) | SF | 235 | $115.79 | $51.66 | $56.00 | $87.00 | $100.00 |
| 37 | Conduit, misc.: repair method B (611E97700) | SF | 50 | $318.42 | $129.24 | $190.00 | $161.00 | $800.00 |
| 38 | Special - welded strap crack repair (690E98000) | EACH | 4 | $1,447.37 | $700.50 | $1,600.00 | $790.00 | $5,000.00 |
| 39 | Conduit, misc.: repair method A (611E97700) | SF | 236 | $115.79 | $51.66 | $56.00 | $67.00 | $100.00 |
| 40 | Conduit, misc.: repair method B (611E97700) | SF | 72 | $318.42 | $233.40 | $190.00 | $197.00 | $800.00 |
| 41 | Special - welded strap crack repair (690E98000) | EACH | 4 | $1,447.37 | $700.50 | $1,600.00 | $900.00 | $1,000.00 |
| 42 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $86,316 | $23,097 | $31,240 | $15,000 | $30,000 |
| 43 | Maintaining traffic (614E11000) | LS | 1 | $136,124 | $113,520 | $131,810 | $197,300 | $90,000 |
| 44 | Mobilization (624E10000) | LS | 1 | $229,964 | $172,368 | $104,140 | $222,400 | $250,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 30, 2026. Compiled by Mirage Metrics.