ODOT contract 260349 bid tabulation

HAM-Inverts FY2027 (CULVERT REPLACEMENT). Let by Ohio DOT on July 30, 2026, HAM. 5 bids received; low bid $1,887,878 by Madex Construction Co, +19% against the engineer's estimate of $1,586,000.

Owner
Ohio DOT
Letting
30 JUL 2026
Pay items
44
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Madex Construction Co$1,887,878Low+19%
2BCC Ohio Inc$1,923,379+2.0%+21%
3KT Holden Construction LLC$2,082,813+10%+31%
4Sunesis Construction Co$2,825,074+50%+78%
5Stanley Miller Construction Company$2,862,531+52%+80%
ODOT contract 260349: bids by rank

Engineer's estimate: $1,586,000.

Bid tabulation

LinePay itemUnitQuantity1. Madex Construction Co2. BCC Ohio Inc3. KT Holden Construction LLC4. Sunesis Construction Co5. Stanley Miller Construction Company
1Clearing and grubbing (201E11000)LS1$40,105$25,754$80,540$147,000$20,000
2Clearing and grubbing (201E11000)LS1$33,158$15,609$69,910$111,000$20,000
3Clearing and grubbing (201E11000)LS1$34,480$24,974$114,315$258,400$20,000
4Clearing and grubbing (201E11000)LS1$37,789$12,487$82,920$101,550$20,000
5Special - pipe cleanout over 48" (202E70130)FT427$92.30$70.77$500.00$224.26$400.00
6Removal misc.: gabion baskets (202E98500)CY18$403.05$172.00$235.00$110.00$200.00
7Cofferdams and excavation bracing, as per plan (503E11101)LS1$81,256$24,151$155,570$111,500$30,000
8Cofferdams and excavation bracing, as per plan (503E11101)LS1$39,158$83,998$91,105$130,800$30,000
9Cofferdams and excavation bracing, as per plan (503E11101)LS1$47,947$21,829$85,090$228,800$30,000
10Cofferdams and excavation bracing, as per plan (503E11101)LS1$38,158$21,829$46,875$60,100$30,000
11Topsoil (659E00300)CY1,015$26.84$57.90$75.00$50.00$90.00
12Seeding and mulching (659E10000)SY9,147$0.97$1.07$1.07$5.40$10.00
13Commercial fertilizer (659E20000)TON1.24$2,315.79$840.00$834.00$760.00$150.00
14Lime (659E31000)ACRE1.90$1,157.89$71.93$1.00$50.00$200.00
15Water (659E35000)MGAL49.40$20.53$0.16$1.00$50.00$50.00
16Erosion control (832E30000)EACH8,000$1.00$1.00$1.00$1.00$1.00
17Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH4$3,473.68$2,893.68$2,100.00$2,050.00$10,000
18Portable changeable message sign, as per plan (614E18601)SNMT2$1,736.84$2,298.00$1,155.00$1,155.00$7,500.00
19Portable barrier, unanchored (622E41100)FT300$86.84$55.26$64.00$78.00$85.00
20Galvanized steel reinforcement (509E26000)LB71$17.37$18.45$6.00$11.00$100.00
21Dowel holes with nonshrink, nonmetallic grout (510E10000)EACH68$86.84$29.88$22.00$19.00$150.00
22Class QC1 concrete, retaining/wingwall not including footing, as per plan (511E46011)CY2$3,357.89$10,773$4,250.00$8,500.00$5,000.00
23Patching concrete structure (519E11100)SF46$347.37$223.50$210.00$236.00$1,000.00
24Slope protection, misc. filling voids with expansi (601E21150)CY5$789.47$2,466.00$1,800.00$2,250.00$5,000.00
25Rock channel protection, type A without filter (601E34000)CY15$550.00$326.60$450.00$450.00$500.00
26Rock channel protection, with grout, type A (601E34400)CY40$665.79$555.00$840.00$570.00$500.00
27Conduit, misc.: repair method A (611E97700)SF350$115.79$51.66$56.00$62.00$100.00
28Conduit, misc.: repair method B (611E97700)SF62$318.42$233.40$190.00$150.00$1,000.00
29Field paving of existing pipe, 144" CMP (611E96550)FT427$1,128.95$284.59$715.00$443.00$600.00
30Conduit, misc.: repair method A (611E97700)SF395$115.79$51.66$45.00$72.50$105.00
31Conduit, misc.: repair method B (611E97700)SF10$665.79$233.40$575.00$401.00$1,200.00
32Special - welded strap crack repair (690E98000)EACH2$2,894.74$700.50$1,600.00$900.00$1,000.00
33Gabions (838E20700)CY18$1,608.19$741.67$900.00$1,000.00$2,000.00
34Special - composite fiber wrap system (519E00100)SF15,840$8.75$57.34$14.30$36.50$65.00
35Conduit, misc.: filling voids with expansive polyu (611E97600)CY5$289.47$2,466.00$1,750.00$2,235.00$15,000
36Conduit, misc.: repair method A (611E97700)SF235$115.79$51.66$56.00$87.00$100.00
37Conduit, misc.: repair method B (611E97700)SF50$318.42$129.24$190.00$161.00$800.00
38Special - welded strap crack repair (690E98000)EACH4$1,447.37$700.50$1,600.00$790.00$5,000.00
39Conduit, misc.: repair method A (611E97700)SF236$115.79$51.66$56.00$67.00$100.00
40Conduit, misc.: repair method B (611E97700)SF72$318.42$233.40$190.00$197.00$800.00
41Special - welded strap crack repair (690E98000)EACH4$1,447.37$700.50$1,600.00$900.00$1,000.00
42Premium for contract performance bond and for payment bond (103E05000)LS1$86,316$23,097$31,240$15,000$30,000
43Maintaining traffic (614E11000)LS1$136,124$113,520$131,810$197,300$90,000
44Mobilization (624E10000)LS1$229,964$172,368$104,140$222,400$250,000
ODOT contract 260349: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of July 30, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy