ODOT contract 250521 bid tabulation
FAI-SR 158-04.20 (INTERSECTION). Let by Ohio DOT on November 13, 2025, FAI. 7 bids received; low bid $2,317,515 by Shelly & Sands Inc, -12% against the engineer's estimate of $2,646,000.
- Owner
- Ohio DOT
- Letting
- 13 NOV 2025
- Pay items
- 150
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $2,317,515 | Low | -12% |
| 2 | Miller Bros Const Inc | $2,414,763 | +4.0% | -9.0% |
| 3 | Axis Civil Construction LLC | $2,658,486 | +15% | 0.0% |
| 4 | Complete General Construction Company | $2,751,592 | +19% | +4.0% |
| 5 | Danbert Incorporated | $2,798,899 | +21% | +6.0% |
| 6 | Strawser Paving Co Inc | $2,799,757 | +21% | +6.0% |
| 7 | Double Z Construction Company | $2,996,549 | +29% | +13% |
Engineer's estimate: $2,646,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Miller Bros Const Inc | 3. Axis Civil Construction LLC | 4. Complete General Construction Company | 5. Danbert Incorporated | 6. Strawser Paving Co Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $44,500 | $40,000 | $40,000 | $25,000 | $19,750 | $19,600 |
| 2 | Headwall removed (202E20010) | EACH | 7 | $250.00 | $700.00 | $500.00 | $400.00 | $1,223.10 | $400.00 |
| 3 | Pavement removed (202E23000) | SY | 5,081 | $9.50 | $15.00 | $13.50 | $13.00 | $11.76 | $10.50 |
| 4 | Walk removed (202E30000) | SF | 358 | $1.00 | $4.45 | $3.20 | $3.50 | $3.42 | $2.50 |
| 5 | Steps removed (202E30200) | FT | 14 | $10.00 | $35.00 | $80.00 | $68.00 | $43.68 | $53.00 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 434 | $25.00 | $37.00 | $35.00 | $27.00 | $22.38 | $25.00 |
| 7 | Pipe removed, over 24" diameter (202E35200) | FT | 636 | $42.00 | $71.00 | $40.00 | $59.00 | $26.18 | $40.00 |
| 8 | Mailbox removed (202E53100) | EACH | 2 | $100.00 | $150.00 | $150.00 | $135.00 | $113.16 | $96.00 |
| 9 | Catch basin removed (202E58100) | EACH | 1 | $300.00 | $800.00 | $880.00 | $580.00 | $683.88 | $400.00 |
| 10 | Septic tank removed (202E62700) | EACH | 2 | $1,800.00 | $2,550.00 | $2,000.00 | $3,900.00 | $1,800.00 | $1,000.00 |
| 11 | Special - drilled water well abandoned (202E66000) | EACH | 2 | $2,200.00 | $2,200.00 | $5,000.00 | $2,500.00 | $1,554.42 | $1,600.00 |
| 12 | Fence removed (202E75000) | FT | 34 | $3.00 | $25.00 | $15.00 | $22.00 | $34.13 | $2.00 |
| 13 | Removal misc.:landscaping rocks (202E98000) | LS | 1 | $250.00 | $1,150.00 | $500.00 | $1,150.00 | $917.32 | $50.00 |
| 14 | Removal misc.: clothesline pole (202E98100) | EACH | 2 | $50.00 | $550.00 | $200.00 | $185.00 | $108.02 | $50.00 |
| 15 | Removal misc.: inspection well (202E98100) | EACH | 1 | $300.00 | $800.00 | $500.00 | $470.00 | $432.08 | $100.00 |
| 16 | Removal misc.: plow (202E98100) | EACH | 1 | $150.00 | $650.00 | $250.00 | $370.00 | $101.35 | $50.00 |
| 17 | Removal misc.: wagon and steel wheel (202E98100) | EACH | 1 | $150.00 | $650.00 | $250.00 | $370.00 | $202.71 | $50.00 |
| 18 | Removal misc.: brick edging (202E98200) | FT | 44 | $2.00 | $14.50 | $15.00 | $8.50 | $29.91 | $1.00 |
| 19 | Removal misc.: conduit (202E98200) | FT | 25 | $11.00 | $66.00 | $15.00 | $25.00 | $35.62 | $10.00 |
| 20 | Excavation (203E10000) | CY | 3,781 | $22.00 | $25.00 | $28.50 | $35.00 | $37.55 | $21.50 |
| 21 | Embankment (203E20000) | CY | 2,373 | $10.00 | $11.00 | $28.50 | $10.00 | $34.69 | $22.00 |
| 22 | Embankment, as per plan (203E20001) | CY | 10 | $25.00 | $70.00 | $42.00 | $25.00 | $342.99 | $15.00 |
| 23 | Subgrade compaction (204E10000) | SY | 8,257 | $2.00 | $2.80 | $3.50 | $3.00 | $3.29 | $1.00 |
| 24 | Proof rolling (204E45000) | HR | 4 | $275.00 | $150.00 | $300.00 | $330.00 | $200.00 | $150.00 |
| 25 | Cement (206E10500) | TON | 228 | $228.00 | $215.00 | $240.00 | $210.00 | $227.97 | $228.00 |
| 26 | Curing coat (206E11000) | SY | 7,533 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 27 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 7,533 | $3.25 | $3.00 | $3.50 | $4.00 | $3.23 | $3.20 |
| 28 | Monument assembly, type C (623E38500) | EACH | 9 | $1,700.00 | $2,800.00 | $2,200.00 | $1,600.00 | $2,302.37 | $1,400.00 |
| 29 | Right-of-way monument, type B (623E40520) | EACH | 33 | $150.00 | $438.00 | $200.00 | $365.00 | $437.88 | $500.00 |
| 30 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $2,000.00 | $3,150.00 | $800.00 | $3,400.00 | $2,500.00 | $3,700.00 |
| 31 | Post construction survey monument verification and report (623E51000) | LS | 1 | $2,000.00 | $3,150.00 | $800.00 | $3,400.00 | $2,500.00 | $9,100.00 |
| 32 | Special - mailbox support system, single (690E50100) | EACH | 12 | $200.00 | $200.00 | $200.00 | $250.00 | $496.86 | $236.00 |
| 33 | Special -faa-construction equipment marking (690E98400) | LS | 1 | $650.00 | $650.00 | $1,500.00 | $2,000.00 | $5,000.00 | $600.00 |
| 34 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 2 | $135.00 | $400.00 | $220.00 | $135.00 | $406.74 | $100.00 |
| 35 | Rock channel protection, type B with filter (601E32100) | CY | 29 | $135.00 | $225.00 | $160.00 | $175.00 | $262.61 | $100.00 |
| 36 | Rock channel protection, type C with filter (601E32200) | CY | 9 | $225.00 | $212.00 | $160.00 | $280.00 | $345.50 | $100.00 |
| 37 | Soil analysis test (659E00100) | EACH | 2 | $135.00 | $135.00 | $135.00 | $100.00 | $150.00 | $100.00 |
| 38 | Topsoil, as per plan (659E00301) | CY | 1,626 | $35.00 | $25.00 | $50.00 | $35.00 | $41.86 | $60.50 |
| 39 | Seeding and mulching, class 1 (659E00500) | SY | 13,011 | $0.75 | $0.73 | $0.75 | $0.93 | $0.92 | $0.95 |
| 40 | Repair seeding and mulching (659E14000) | SY | 660 | $0.80 | $0.80 | $0.80 | $1.50 | $0.92 | $1.50 |
| 41 | Inter-seeding (659E15000) | SY | 660 | $0.80 | $0.80 | $0.80 | $1.50 | $0.92 | $1.50 |
| 42 | Commercial fertilizer (659E20000) | TON | 1.82 | $850.00 | $840.77 | $650.00 | $700.00 | $1,250.00 | $700.00 |
| 43 | Lime (659E31000) | ACRE | 2.69 | $145.00 | $145.94 | $160.00 | $10.00 | $150.00 | $10.00 |
| 44 | Water (659E35000) | MGAL | 72 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 45 | Mowing (659E40000) | MSF | 29 | $50.00 | $1.00 | $29.00 | $25.00 | $40.00 | $25.00 |
| 46 | Slope erosion protection (670E00500) | SY | 954 | $1.40 | $1.39 | $1.40 | $2.25 | $2.25 | $2.25 |
| 47 | Ditch erosion protection (670E00700) | SY | 510 | $1.50 | $1.49 | $1.50 | $2.00 | $2.25 | $2.00 |
| 48 | Ditch erosion protection mat, type B (670E00720) | SY | 216 | $1.50 | $1.49 | $1.50 | $2.00 | $2.25 | $2.00 |
| 49 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,700.00 | $2,500.00 | $2,600.00 | $2,500.00 | $2,500.00 | $2,600.00 |
| 50 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $7,000.00 | $7,250.00 | $8,560.00 | $11,750 | $11,750 | $4,300.00 |
| 51 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $12,500 | $8,220.00 | $13,000 | $12,000 | $2,500.00 | $12,100 |
| 52 | Erosion control (832E30000) | EACH | 50,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 53 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 203 | $5.50 | $5.49 | $5.50 | $4.35 | $5.00 | $4.40 |
| 54 | Concrete masonry (602E20000) | CY | 5.90 | $3,200.00 | $2,800.00 | $2,880.00 | $4,570.00 | $5,255.65 | $3,500.00 |
| 55 | 6" unclassified pipe underdrains (605E13300) | FT | 759 | $20.00 | $24.00 | $30.95 | $39.00 | $25.89 | $13.50 |
| 56 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 2,202 | $19.00 | $13.50 | $29.00 | $23.00 | $27.22 | $13.75 |
| 57 | Aggregate drains (605E31100) | FT | 20 | $18.00 | $50.00 | $50.00 | $30.00 | $34.63 | $10.00 |
| 58 | 4" conduit, type E (611E00400) | FT | 140 | $15.00 | $24.00 | $28.00 | $19.00 | $29.56 | $7.00 |
| 59 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 333 | $30.00 | $45.00 | $35.00 | $21.00 | $29.49 | $21.00 |
| 60 | 8" conduit, type C (611E02000) | FT | 24 | $55.00 | $158.00 | $95.00 | $87.00 | $141.12 | $40.00 |
| 61 | 10" conduit, type B (611E03100) | FT | 75 | $50.00 | $48.50 | $42.00 | $62.00 | $120.22 | $15.00 |
| 62 | 10" conduit, type E (611E03600) | FT | 75 | $40.00 | $37.00 | $42.00 | $49.00 | $120.22 | $15.00 |
| 63 | 10" conduit, type F (611E03700) | FT | 75 | $40.00 | $37.00 | $42.00 | $49.00 | $120.22 | $15.00 |
| 64 | 12" conduit, type B (611E04400) | FT | 325 | $100.00 | $90.00 | $100.00 | $123.00 | $157.49 | $123.50 |
| 65 | 12" conduit, type D (611E04900) | FT | 139 | $85.00 | $90.00 | $100.00 | $106.00 | $110.23 | $142.50 |
| 66 | 15" conduit, type A (611E05700) | FT | 99 | $110.00 | $102.00 | $100.00 | $114.00 | $121.23 | $147.00 |
| 67 | 15" conduit, type D (611E06400) | FT | 122 | $90.00 | $100.00 | $110.00 | $107.00 | $139.96 | $142.00 |
| 68 | 18" conduit, type C (611E07600) | FT | 8 | $230.00 | $215.00 | $220.00 | $155.00 | $197.58 | $164.00 |
| 69 | 24" conduit, type D (611E10900) | FT | 62 | $140.00 | $150.00 | $145.00 | $157.00 | $232.77 | $192.00 |
| 70 | 30" conduit, type A, 706.02, 707.04 (0.109), 707. (611E13200) | FT | 81 | $180.00 | $218.00 | $210.00 | $172.00 | $273.42 | $300.00 |
| 71 | 30" conduit, type B (611E13400) | FT | 85 | $199.00 | $215.00 | $210.00 | $194.00 | $289.09 | $300.00 |
| 72 | 36" conduit, type C (611E16600) | FT | 417 | $177.00 | $180.00 | $215.00 | $223.00 | $281.44 | $227.50 |
| 73 | Conduit, misc.:type B for drainage discharge conti (611E97400) | FT | 50 | $30.00 | $41.00 | $30.00 | $50.00 | $113.30 | $12.00 |
| 74 | Conduit, misc.:type C for drainage discharge conti (611E97400) | FT | 50 | $24.00 | $41.00 | $30.00 | $35.00 | $113.30 | $12.00 |
| 75 | Conduit, misc.:type E for drainage discharge conti (611E97400) | FT | 25 | $24.00 | $41.00 | $50.00 | $23.00 | $116.19 | $12.00 |
| 76 | Conduit, misc.:type F for drainage discharge conti (611E97400) | FT | 25 | $24.00 | $41.00 | $50.00 | $23.00 | $116.19 | $42.50 |
| 77 | Catch basin, no. 6 (611E98370) | EACH | 10 | $3,650.00 | $3,850.00 | $4,400.00 | $4,450.00 | $6,170.14 | $4,200.00 |
| 78 | Manhole, no. 3 (611E99574) | EACH | 4 | $5,600.00 | $6,300.00 | $9,500.00 | $7,950.00 | $11,074 | $6,900.00 |
| 79 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $275.00 | $650.00 | $500.00 | $500.00 | $546.09 | $250.00 |
| 80 | Inspection well (611E99720) | EACH | 1 | $750.00 | $1,850.00 | $1,500.00 | $1,400.00 | $2,960.94 | $500.00 |
| 81 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 200 | $55.00 | $110.00 | $110.00 | $110.00 | $110.00 | $75.00 |
| 82 | Full depth pavement sawing (252E01500) | FT | 104 | $5.00 | $3.50 | $6.00 | $8.00 | $4.27 | $2.50 |
| 83 | Pavement repair, as per plan (253E01001) | SY | 200 | $135.00 | $140.00 | $140.00 | $140.00 | $140.00 | $200.00 |
| 84 | Pavement planing, asphalt concrete, 2" (254E01000) | SY | 231 | $9.00 | $10.50 | $10.50 | $10.50 | $15.37 | $10.00 |
| 85 | Pavement planing, asphalt concrete, 3" (254E01000) | SY | 968 | $9.00 | $10.50 | $10.50 | $10.50 | $15.37 | $12.00 |
| 86 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 969 | $155.00 | $169.50 | $169.50 | $169.50 | $169.50 | $208.50 |
| 87 | Aggregate base (304E20000) | CY | 1,402 | $85.00 | $85.00 | $102.00 | $100.00 | $95.67 | $98.00 |
| 88 | Non-tracking tack coat (407E20000) | GAL | 1,285 | $3.50 | $4.10 | $4.10 | $4.10 | $4.10 | $5.50 |
| 89 | Prime coat (408E10000) | GAL | 50 | $5.00 | $10.00 | $10.00 | $10.00 | $10.00 | $4.75 |
| 90 | Aggregate, single chip seal, type A, as per plan (422E11001) | SY | 67,600 | $2.30 | $2.30 | $2.30 | $2.30 | $2.30 | $4.00 |
| 91 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 250 | $220.00 | $201.00 | $201.00 | $201.00 | $201.00 | $300.00 |
| 92 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 235 | $230.00 | $221.00 | $221.00 | $221.00 | $221.00 | $305.00 |
| 93 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 50 | $325.00 | $450.00 | $450.00 | $450.00 | $450.00 | $400.00 |
| 94 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 327 | $180.00 | $181.00 | $181.00 | $181.00 | $181.00 | $244.00 |
| 95 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 22 | $370.00 | $265.00 | $265.00 | $265.00 | $265.00 | $700.00 |
| 96 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 340 | $79.00 | $79.00 | $125.00 | $113.00 | $91.60 | $128.50 |
| 97 | 9" non-reinforced concrete pavement, class QC 1P (452E13010) | SY | 915 | $110.00 | $109.00 | $135.00 | $118.00 | $96.10 | $75.00 |
| 98 | Curb, type 6 (609E26000) | FT | 1,159 | $32.00 | $18.00 | $32.00 | $39.00 | $27.05 | $24.00 |
| 99 | Combination curb and gutter, type 9, as per plan (609E31001) | FT | 308 | $75.00 | $40.00 | $40.00 | $94.00 | $37.10 | $46.50 |
| 100 | Combination curb and gutter, type 9, as per plan (609E31001) | FT | 1,103 | $83.00 | $46.75 | $42.00 | $87.00 | $41.35 | $75.50 |
| 101 | 6" concrete traffic island (609E54000) | SY | 269 | $72.00 | $79.75 | $105.00 | $90.00 | $87.25 | $84.00 |
| 102 | Compacted aggregate (617E10100) | CY | 40 | $125.00 | $140.00 | $250.00 | $250.00 | $211.28 | $294.50 |
| 103 | Connection, fused pull apart (625E00450) | EACH | 16 | $110.00 | $110.00 | $110.00 | $150.00 | $157.00 | $158.00 |
| 104 | Connection, unfused permanent (625E00480) | EACH | 24 | $110.00 | $110.00 | $110.00 | $120.00 | $120.50 | $126.50 |
| 105 | Transformer base, type at-A (625E02500) | EACH | 1 | $975.00 | $975.00 | $975.00 | $650.00 | $650.00 | $700.00 |
| 106 | Light pole, conventional, AT12B35 (625E10490) | EACH | 3 | $3,900.00 | $3,900.00 | $3,900.00 | $3,200.00 | $3,622.00 | $3,400.00 |
| 107 | Light pole, conventional, AT15B35 (625E10490) | EACH | 5 | $4,200.00 | $4,200.00 | $4,200.00 | $3,250.00 | $3,772.00 | $3,400.00 |
| 108 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 8 | $1,800.00 | $1,800.00 | $1,800.00 | $2,100.00 | $1,349.00 | $2,000.00 |
| 109 | No. 6 AWG 2400 volt distribution cable (625E23302) | FT | 738 | $3.50 | $3.50 | $3.50 | $3.00 | $3.07 | $3.20 |
| 110 | No. 10 AWG pole and bracket cable (625E23400) | FT | 782 | $2.00 | $2.00 | $2.00 | $2.00 | $2.94 | $2.10 |
| 111 | 1-1/2" duct cable with three no. 6 AWG 2400 volt cables (625E24324) | FT | 1,375 | $11.00 | $11.00 | $11.00 | $18.00 | $15.75 | $19.00 |
| 112 | Conduit, 3", 725.04 (625E25500) | FT | 177 | $31.00 | $31.00 | $31.00 | $37.00 | $69.73 | $39.00 |
| 113 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 8 | $275.00 | $275.00 | $275.00 | $500.00 | $603.00 | $500.00 |
| 114 | Trench (625E29000) | FT | 1,270 | $12.00 | $12.00 | $12.00 | $10.00 | $7.71 | $10.50 |
| 115 | Pull box, 725.08, 18" (625E30700) | EACH | 6 | $1,050.00 | $1,050.00 | $1,050.00 | $1,350.00 | $1,222.00 | $1,400.00 |
| 116 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $1,305.00 | $1,305.00 | $1,305.00 | $1,600.00 | $1,342.00 | $1,700.00 |
| 117 | Ground rod (625E32000) | EACH | 8 | $265.00 | $265.00 | $265.00 | $350.00 | $381.00 | $400.00 |
| 118 | Power service, as per plan (625E34001) | EACH | 1 | $9,150.00 | $9,150.00 | $9,150.00 | $10,000 | $17,775 | $9,100.00 |
| 119 | Transformer pad, concrete (625E34300) | EACH | 1 | $750.00 | $750.00 | $750.00 | $2,950.00 | $1,900.00 | $3,100.00 |
| 120 | Underground warning marking tape (625E36010) | FT | 1,270 | $3.00 | $3.00 | $3.00 | $2.00 | $0.17 | $2.10 |
| 121 | Arc flash calculations and label (S.R. 158/coonpat (625E76000) | EACH | 1 | $3,450.00 | $3,450.00 | $3,450.00 | $3,700.00 | $3,710.00 | $3,900.00 |
| 122 | RPM (621E00100) | EACH | 121 | $54.00 | $53.00 | $53.00 | $72.83 | $46.00 | $53.00 |
| 123 | Raised pavement marker removed (621E54000) | EACH | 27 | $10.00 | $15.00 | $40.00 | $29.00 | $44.20 | $14.25 |
| 124 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 275 | $20.00 | $18.00 | $20.00 | $18.00 | $19.80 | $20.00 |
| 125 | Sign post reflector (630E08600) | EACH | 4 | $50.00 | $75.00 | $50.00 | $75.00 | $70.48 | $50.00 |
| 126 | Sign, flat sheet (630E80100) | SF | 195.20 | $22.00 | $20.00 | $22.00 | $20.00 | $23.11 | $22.00 |
| 127 | Removal of ground mounted sign and disposal (630E84900) | EACH | 27 | $30.00 | $35.00 | $30.00 | $35.00 | $48.94 | $30.00 |
| 128 | Removal of ground mounted post support and disposal (630E86002) | EACH | 15 | $30.00 | $30.00 | $30.00 | $30.00 | $48.94 | $30.00 |
| 129 | Edge line, 6" (644E00104) | MI | 0.90 | $6,300.00 | $5,315.00 | $7,250.00 | $5,315.00 | $6,300.00 | $7,976.47 |
| 130 | Center line (644E00300) | MI | 0.37 | $6,700.00 | $10,500 | $8,400.00 | $10,500 | $6,700.00 | $9,241.70 |
| 131 | Channelizing line, 8" (644E00400) | FT | 132 | $8.00 | $10.00 | $2.65 | $10.00 | $8.00 | $2.90 |
| 132 | Transverse/diagonal line (644E00700) | FT | 257 | $8.80 | $10.00 | $8.00 | $10.00 | $8.00 | $8.80 |
| 133 | Dotted line, 8" (644E01514) | FT | 137 | $1.75 | $5.00 | $3.00 | $5.00 | $1.75 | $3.30 |
| 134 | Yield line (644E20800) | FT | 60 | $13.00 | $50.00 | $11.25 | $50.00 | $13.00 | $12.50 |
| 135 | Geotextile fabric (204E50000) | SY | 896 | $2.40 | $2.39 | $2.39 | $2.39 | $3.01 | $3.00 |
| 136 | Riprap for tree protection, as per plan (657E10001) | SY | 448 | $62.00 | $61.37 | $62.00 | $61.36 | $34.53 | $111.00 |
| 137 | Deciduous shrub, 12" height (rhus aromatica, B&B 5 (661E19000) | EACH | 27 | $95.50 | $95.37 | $96.00 | $95.37 | $100.00 | $183.00 |
| 138 | Evergreen tree, 2' height (pinus mugo, B&B 8" min. (661E50040) | EACH | 5 | $107.50 | $107.45 | $108.00 | $107.45 | $500.00 | $183.00 |
| 139 | Building demolished, parcel 18, 2-story framed hou (202E56000) | LS | 1 | $32,750 | $50,000 | $65,000 | $53,000 | $48,350 | $42,600 |
| 140 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $104.00 | $90.00 | $75.00 | $125.00 | $120.00 | $108.50 |
| 141 | Detour signing, as per plan (614E12421) | LS | 1 | $15,000 | $16,995 | $30,000 | $50,000 | $33,706 | $33,700 |
| 142 | Portable changeable message sign, as per plan (614E18601) | SNMT | 45 | $950.00 | $950.00 | $610.00 | $1,000.00 | $613.81 | $600.00 |
| 143 | Water (616E10000) | MGAL | 1 | $100.00 | $90.00 | $1.00 | $180.00 | $500.00 | $191.50 |
| 144 | Edge line, 4", type 1 (642E00100) | MI | 1 | $1,380.00 | $2,060.00 | $995.00 | $2,060.00 | $1,380.00 | $1,100.00 |
| 145 | Center line, type 1 (642E00300) | MI | 0.50 | $1,380.00 | $4,120.00 | $1,700.00 | $4,120.00 | $1,380.00 | $1,870.34 |
| 146 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $16,396 | $11,969 | $25,000 | $20,000 | $22,000 | $15,200 |
| 147 | Maintaining traffic (614E11000) | LS | 1 | $32,840 | $30,000 | $45,000 | $50,000 | $100,000 | $56,000 |
| 148 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $26,500 | $36,800 | $35,000 | $44,000 | $55,550 | $53,900 |
| 149 | Mobilization (624E10000) | LS | 1 | $100,000 | $120,738 | $100,000 | $137,500 | $100,000 | $125,000 |
| 200 | Compacted aggregate, as per plan (617E10101) | CY | 47 | $125.00 | $150.00 | $215.00 | $215.00 | $185.72 | $223.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.