ODOT contract 250521 bid tabulation

FAI-SR 158-04.20 (INTERSECTION). Let by Ohio DOT on November 13, 2025, FAI. 7 bids received; low bid $2,317,515 by Shelly & Sands Inc, -12% against the engineer's estimate of $2,646,000.

Owner
Ohio DOT
Letting
13 NOV 2025
Pay items
150
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly & Sands Inc$2,317,515Low-12%
2Miller Bros Const Inc$2,414,763+4.0%-9.0%
3Axis Civil Construction LLC$2,658,486+15%0.0%
4Complete General Construction Company$2,751,592+19%+4.0%
5Danbert Incorporated$2,798,899+21%+6.0%
6Strawser Paving Co Inc$2,799,757+21%+6.0%
7Double Z Construction Company$2,996,549+29%+13%
ODOT contract 250521: bids by rank

Engineer's estimate: $2,646,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly & Sands Inc2. Miller Bros Const Inc3. Axis Civil Construction LLC4. Complete General Construction Company5. Danbert Incorporated6. Strawser Paving Co Inc
1Clearing and grubbing (201E11000)LS1$44,500$40,000$40,000$25,000$19,750$19,600
2Headwall removed (202E20010)EACH7$250.00$700.00$500.00$400.00$1,223.10$400.00
3Pavement removed (202E23000)SY5,081$9.50$15.00$13.50$13.00$11.76$10.50
4Walk removed (202E30000)SF358$1.00$4.45$3.20$3.50$3.42$2.50
5Steps removed (202E30200)FT14$10.00$35.00$80.00$68.00$43.68$53.00
6Pipe removed, 24" and under (202E35100)FT434$25.00$37.00$35.00$27.00$22.38$25.00
7Pipe removed, over 24" diameter (202E35200)FT636$42.00$71.00$40.00$59.00$26.18$40.00
8Mailbox removed (202E53100)EACH2$100.00$150.00$150.00$135.00$113.16$96.00
9Catch basin removed (202E58100)EACH1$300.00$800.00$880.00$580.00$683.88$400.00
10Septic tank removed (202E62700)EACH2$1,800.00$2,550.00$2,000.00$3,900.00$1,800.00$1,000.00
11Special - drilled water well abandoned (202E66000)EACH2$2,200.00$2,200.00$5,000.00$2,500.00$1,554.42$1,600.00
12Fence removed (202E75000)FT34$3.00$25.00$15.00$22.00$34.13$2.00
13Removal misc.:landscaping rocks (202E98000)LS1$250.00$1,150.00$500.00$1,150.00$917.32$50.00
14Removal misc.: clothesline pole (202E98100)EACH2$50.00$550.00$200.00$185.00$108.02$50.00
15Removal misc.: inspection well (202E98100)EACH1$300.00$800.00$500.00$470.00$432.08$100.00
16Removal misc.: plow (202E98100)EACH1$150.00$650.00$250.00$370.00$101.35$50.00
17Removal misc.: wagon and steel wheel (202E98100)EACH1$150.00$650.00$250.00$370.00$202.71$50.00
18Removal misc.: brick edging (202E98200)FT44$2.00$14.50$15.00$8.50$29.91$1.00
19Removal misc.: conduit (202E98200)FT25$11.00$66.00$15.00$25.00$35.62$10.00
20Excavation (203E10000)CY3,781$22.00$25.00$28.50$35.00$37.55$21.50
21Embankment (203E20000)CY2,373$10.00$11.00$28.50$10.00$34.69$22.00
22Embankment, as per plan (203E20001)CY10$25.00$70.00$42.00$25.00$342.99$15.00
23Subgrade compaction (204E10000)SY8,257$2.00$2.80$3.50$3.00$3.29$1.00
24Proof rolling (204E45000)HR4$275.00$150.00$300.00$330.00$200.00$150.00
25Cement (206E10500)TON228$228.00$215.00$240.00$210.00$227.97$228.00
26Curing coat (206E11000)SY7,533$1.25$1.25$1.25$1.25$1.25$1.25
27Cement stabilized subgrade, 14 inches deep (206E15020)SY7,533$3.25$3.00$3.50$4.00$3.23$3.20
28Monument assembly, type C (623E38500)EACH9$1,700.00$2,800.00$2,200.00$1,600.00$2,302.37$1,400.00
29Right-of-way monument, type B (623E40520)EACH33$150.00$438.00$200.00$365.00$437.88$500.00
30Preconstruction survey monument verification and report (623E50000)LS1$2,000.00$3,150.00$800.00$3,400.00$2,500.00$3,700.00
31Post construction survey monument verification and report (623E51000)LS1$2,000.00$3,150.00$800.00$3,400.00$2,500.00$9,100.00
32Special - mailbox support system, single (690E50100)EACH12$200.00$200.00$200.00$250.00$496.86$236.00
33Special -faa-construction equipment marking (690E98400)LS1$650.00$650.00$1,500.00$2,000.00$5,000.00$600.00
34Tied concrete block mat with type 1 underlayment (601E21050)SY2$135.00$400.00$220.00$135.00$406.74$100.00
35Rock channel protection, type B with filter (601E32100)CY29$135.00$225.00$160.00$175.00$262.61$100.00
36Rock channel protection, type C with filter (601E32200)CY9$225.00$212.00$160.00$280.00$345.50$100.00
37Soil analysis test (659E00100)EACH2$135.00$135.00$135.00$100.00$150.00$100.00
38Topsoil, as per plan (659E00301)CY1,626$35.00$25.00$50.00$35.00$41.86$60.50
39Seeding and mulching, class 1 (659E00500)SY13,011$0.75$0.73$0.75$0.93$0.92$0.95
40Repair seeding and mulching (659E14000)SY660$0.80$0.80$0.80$1.50$0.92$1.50
41Inter-seeding (659E15000)SY660$0.80$0.80$0.80$1.50$0.92$1.50
42Commercial fertilizer (659E20000)TON1.82$850.00$840.77$650.00$700.00$1,250.00$700.00
43Lime (659E31000)ACRE2.69$145.00$145.94$160.00$10.00$150.00$10.00
44Water (659E35000)MGAL72$1.00$1.00$1.00$1.00$1.00$1.00
45Mowing (659E40000)MSF29$50.00$1.00$29.00$25.00$40.00$25.00
46Slope erosion protection (670E00500)SY954$1.40$1.39$1.40$2.25$2.25$2.25
47Ditch erosion protection (670E00700)SY510$1.50$1.49$1.50$2.00$2.25$2.00
48Ditch erosion protection mat, type B (670E00720)SY216$1.50$1.49$1.50$2.00$2.25$2.00
49Storm water pollution prevention plan (832E15000)LS1$2,700.00$2,500.00$2,600.00$2,500.00$2,500.00$2,600.00
50Storm water pollution prevention inspections (832E15002)LS1$7,000.00$7,250.00$8,560.00$11,750$11,750$4,300.00
51Storm water pollution prevention inspection software (832E15010)LS1$12,500$8,220.00$13,000$12,000$2,500.00$12,100
52Erosion control (832E30000)EACH50,000$1.00$1.00$1.00$1.00$1.00$1.00
53Seeding and erosion control with turf reinforcing mat, type 1 (836E10000)SY203$5.50$5.49$5.50$4.35$5.00$4.40
54Concrete masonry (602E20000)CY5.90$3,200.00$2,800.00$2,880.00$4,570.00$5,255.65$3,500.00
556" unclassified pipe underdrains (605E13300)FT759$20.00$24.00$30.95$39.00$25.89$13.50
566" base pipe underdrains with geotextile fabric (605E14020)FT2,202$19.00$13.50$29.00$23.00$27.22$13.75
57Aggregate drains (605E31100)FT20$18.00$50.00$50.00$30.00$34.63$10.00
584" conduit, type E (611E00400)FT140$15.00$24.00$28.00$19.00$29.56$7.00
596" conduit, type F for underdrain outlets (611E00510)FT333$30.00$45.00$35.00$21.00$29.49$21.00
608" conduit, type C (611E02000)FT24$55.00$158.00$95.00$87.00$141.12$40.00
6110" conduit, type B (611E03100)FT75$50.00$48.50$42.00$62.00$120.22$15.00
6210" conduit, type E (611E03600)FT75$40.00$37.00$42.00$49.00$120.22$15.00
6310" conduit, type F (611E03700)FT75$40.00$37.00$42.00$49.00$120.22$15.00
6412" conduit, type B (611E04400)FT325$100.00$90.00$100.00$123.00$157.49$123.50
6512" conduit, type D (611E04900)FT139$85.00$90.00$100.00$106.00$110.23$142.50
6615" conduit, type A (611E05700)FT99$110.00$102.00$100.00$114.00$121.23$147.00
6715" conduit, type D (611E06400)FT122$90.00$100.00$110.00$107.00$139.96$142.00
6818" conduit, type C (611E07600)FT8$230.00$215.00$220.00$155.00$197.58$164.00
6924" conduit, type D (611E10900)FT62$140.00$150.00$145.00$157.00$232.77$192.00
7030" conduit, type A, 706.02, 707.04 (0.109), 707. (611E13200)FT81$180.00$218.00$210.00$172.00$273.42$300.00
7130" conduit, type B (611E13400)FT85$199.00$215.00$210.00$194.00$289.09$300.00
7236" conduit, type C (611E16600)FT417$177.00$180.00$215.00$223.00$281.44$227.50
73Conduit, misc.:type B for drainage discharge conti (611E97400)FT50$30.00$41.00$30.00$50.00$113.30$12.00
74Conduit, misc.:type C for drainage discharge conti (611E97400)FT50$24.00$41.00$30.00$35.00$113.30$12.00
75Conduit, misc.:type E for drainage discharge conti (611E97400)FT25$24.00$41.00$50.00$23.00$116.19$12.00
76Conduit, misc.:type F for drainage discharge conti (611E97400)FT25$24.00$41.00$50.00$23.00$116.19$42.50
77Catch basin, no. 6 (611E98370)EACH10$3,650.00$3,850.00$4,400.00$4,450.00$6,170.14$4,200.00
78Manhole, no. 3 (611E99574)EACH4$5,600.00$6,300.00$9,500.00$7,950.00$11,074$6,900.00
79Precast reinforced concrete outlet (611E99710)EACH1$275.00$650.00$500.00$500.00$546.09$250.00
80Inspection well (611E99720)EACH1$750.00$1,850.00$1,500.00$1,400.00$2,960.94$500.00
81Partial depth pavement repair (441), as per plan (251E01001)SY200$55.00$110.00$110.00$110.00$110.00$75.00
82Full depth pavement sawing (252E01500)FT104$5.00$3.50$6.00$8.00$4.27$2.50
83Pavement repair, as per plan (253E01001)SY200$135.00$140.00$140.00$140.00$140.00$200.00
84Pavement planing, asphalt concrete, 2" (254E01000)SY231$9.00$10.50$10.50$10.50$15.37$10.00
85Pavement planing, asphalt concrete, 3" (254E01000)SY968$9.00$10.50$10.50$10.50$15.37$12.00
86Asphalt concrete base, PG64-22, (449) (301E56000)CY969$155.00$169.50$169.50$169.50$169.50$208.50
87Aggregate base (304E20000)CY1,402$85.00$85.00$102.00$100.00$95.67$98.00
88Non-tracking tack coat (407E20000)GAL1,285$3.50$4.10$4.10$4.10$4.10$5.50
89Prime coat (408E10000)GAL50$5.00$10.00$10.00$10.00$10.00$4.75
90Aggregate, single chip seal, type A, as per plan (422E11001)SY67,600$2.30$2.30$2.30$2.30$2.30$4.00
91Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY250$220.00$201.00$201.00$201.00$201.00$300.00
92Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100)CY235$230.00$221.00$221.00$221.00$221.00$305.00
93Asphalt concrete surface course, type 1, (449), as per plan (441E70101)CY50$325.00$450.00$450.00$450.00$450.00$400.00
94Asphalt concrete intermediate course, type 2, (449) (441E70300)CY327$180.00$181.00$181.00$181.00$181.00$244.00
95Asphalt concrete surface course, type 1, (449), (driveways) (441E70500)CY22$370.00$265.00$265.00$265.00$265.00$700.00
966" non-reinforced concrete pavement, class QC 1P (452E10010)SY340$79.00$79.00$125.00$113.00$91.60$128.50
979" non-reinforced concrete pavement, class QC 1P (452E13010)SY915$110.00$109.00$135.00$118.00$96.10$75.00
98Curb, type 6 (609E26000)FT1,159$32.00$18.00$32.00$39.00$27.05$24.00
99Combination curb and gutter, type 9, as per plan (609E31001)FT308$75.00$40.00$40.00$94.00$37.10$46.50
100Combination curb and gutter, type 9, as per plan (609E31001)FT1,103$83.00$46.75$42.00$87.00$41.35$75.50
1016" concrete traffic island (609E54000)SY269$72.00$79.75$105.00$90.00$87.25$84.00
102Compacted aggregate (617E10100)CY40$125.00$140.00$250.00$250.00$211.28$294.50
103Connection, fused pull apart (625E00450)EACH16$110.00$110.00$110.00$150.00$157.00$158.00
104Connection, unfused permanent (625E00480)EACH24$110.00$110.00$110.00$120.00$120.50$126.50
105Transformer base, type at-A (625E02500)EACH1$975.00$975.00$975.00$650.00$650.00$700.00
106Light pole, conventional, AT12B35 (625E10490)EACH3$3,900.00$3,900.00$3,900.00$3,200.00$3,622.00$3,400.00
107Light pole, conventional, AT15B35 (625E10490)EACH5$4,200.00$4,200.00$4,200.00$3,250.00$3,772.00$3,400.00
108Light pole foundation, 24" X 6' deep (625E14000)EACH8$1,800.00$1,800.00$1,800.00$2,100.00$1,349.00$2,000.00
109No. 6 AWG 2400 volt distribution cable (625E23302)FT738$3.50$3.50$3.50$3.00$3.07$3.20
110No. 10 AWG pole and bracket cable (625E23400)FT782$2.00$2.00$2.00$2.00$2.94$2.10
1111-1/2" duct cable with three no. 6 AWG 2400 volt cables (625E24324)FT1,375$11.00$11.00$11.00$18.00$15.75$19.00
112Conduit, 3", 725.04 (625E25500)FT177$31.00$31.00$31.00$37.00$69.73$39.00
113Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH8$275.00$275.00$275.00$500.00$603.00$500.00
114Trench (625E29000)FT1,270$12.00$12.00$12.00$10.00$7.71$10.50
115Pull box, 725.08, 18" (625E30700)EACH6$1,050.00$1,050.00$1,050.00$1,350.00$1,222.00$1,400.00
116Pull box, 725.08, 24" (625E30706)EACH1$1,305.00$1,305.00$1,305.00$1,600.00$1,342.00$1,700.00
117Ground rod (625E32000)EACH8$265.00$265.00$265.00$350.00$381.00$400.00
118Power service, as per plan (625E34001)EACH1$9,150.00$9,150.00$9,150.00$10,000$17,775$9,100.00
119Transformer pad, concrete (625E34300)EACH1$750.00$750.00$750.00$2,950.00$1,900.00$3,100.00
120Underground warning marking tape (625E36010)FT1,270$3.00$3.00$3.00$2.00$0.17$2.10
121Arc flash calculations and label (S.R. 158/coonpat (625E76000)EACH1$3,450.00$3,450.00$3,450.00$3,700.00$3,710.00$3,900.00
122RPM (621E00100)EACH121$54.00$53.00$53.00$72.83$46.00$53.00
123Raised pavement marker removed (621E54000)EACH27$10.00$15.00$40.00$29.00$44.20$14.25
124Ground mounted support, no. 3 post, as per plan (630E03101)FT275$20.00$18.00$20.00$18.00$19.80$20.00
125Sign post reflector (630E08600)EACH4$50.00$75.00$50.00$75.00$70.48$50.00
126Sign, flat sheet (630E80100)SF195.20$22.00$20.00$22.00$20.00$23.11$22.00
127Removal of ground mounted sign and disposal (630E84900)EACH27$30.00$35.00$30.00$35.00$48.94$30.00
128Removal of ground mounted post support and disposal (630E86002)EACH15$30.00$30.00$30.00$30.00$48.94$30.00
129Edge line, 6" (644E00104)MI0.90$6,300.00$5,315.00$7,250.00$5,315.00$6,300.00$7,976.47
130Center line (644E00300)MI0.37$6,700.00$10,500$8,400.00$10,500$6,700.00$9,241.70
131Channelizing line, 8" (644E00400)FT132$8.00$10.00$2.65$10.00$8.00$2.90
132Transverse/diagonal line (644E00700)FT257$8.80$10.00$8.00$10.00$8.00$8.80
133Dotted line, 8" (644E01514)FT137$1.75$5.00$3.00$5.00$1.75$3.30
134Yield line (644E20800)FT60$13.00$50.00$11.25$50.00$13.00$12.50
135Geotextile fabric (204E50000)SY896$2.40$2.39$2.39$2.39$3.01$3.00
136Riprap for tree protection, as per plan (657E10001)SY448$62.00$61.37$62.00$61.36$34.53$111.00
137Deciduous shrub, 12" height (rhus aromatica, B&B 5 (661E19000)EACH27$95.50$95.37$96.00$95.37$100.00$183.00
138Evergreen tree, 2' height (pinus mugo, B&B 8" min. (661E50040)EACH5$107.50$107.45$108.00$107.45$500.00$183.00
139Building demolished, parcel 18, 2-story framed hou (202E56000)LS1$32,750$50,000$65,000$53,000$48,350$42,600
140Law enforcement officer with patrol car for assistance (614E11110)HR40$104.00$90.00$75.00$125.00$120.00$108.50
141Detour signing, as per plan (614E12421)LS1$15,000$16,995$30,000$50,000$33,706$33,700
142Portable changeable message sign, as per plan (614E18601)SNMT45$950.00$950.00$610.00$1,000.00$613.81$600.00
143Water (616E10000)MGAL1$100.00$90.00$1.00$180.00$500.00$191.50
144Edge line, 4", type 1 (642E00100)MI1$1,380.00$2,060.00$995.00$2,060.00$1,380.00$1,100.00
145Center line, type 1 (642E00300)MI0.50$1,380.00$4,120.00$1,700.00$4,120.00$1,380.00$1,870.34
146Premium for contract performance bond and for payment bond (103E05000)LS1$16,396$11,969$25,000$20,000$22,000$15,200
147Maintaining traffic (614E11000)LS1$32,840$30,000$45,000$50,000$100,000$56,000
148Construction layout stakes and surveying, as per plan (623E10001)LS1$26,500$36,800$35,000$44,000$55,550$53,900
149Mobilization (624E10000)LS1$100,000$120,738$100,000$137,500$100,000$125,000
200Compacted aggregate, as per plan (617E10101)CY47$125.00$150.00$215.00$215.00$185.72$223.50
ODOT contract 250521: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy