ODOT contract 250545 bid tabulation
LOG-US 33-17.82 (BRIDGE REPAIR). Let by Ohio DOT on November 13, 2025, LOG. 7 bids received; low bid $492,631 by BCC Ohio Inc, -24% against the engineer's estimate of $650,000.
- Owner
- Ohio DOT
- Letting
- 13 NOV 2025
- Pay items
- 27
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | BCC Ohio Inc | $492,631 | Low | -24% |
| 2 | Ohio Concrete Maintenance LLC | $553,241 | +12% | -15% |
| 3 | Double Z Construction Company | $637,484 | +29% | -2.0% |
| 4 | Complete General Construction Company | $670,937 | +36% | +3.0% |
| 5 | Eagle Bridge Co | $696,772 | +41% | +7.0% |
| 6 | Perk Company Inc | $770,093 | +56% | +18% |
| 7 | I V S Hydro Inc | $875,300 | +78% | +35% |
Engineer's estimate: $650,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. BCC Ohio Inc | 2. Ohio Concrete Maintenance LLC | 3. Double Z Construction Company | 4. Complete General Construction Company | 5. Eagle Bridge Co | 6. Perk Company Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Wearing course removed, as per plan (202E23501) | SY | 695 | $0.90 | $5.00 | $10.00 | $9.00 | $7.50 | $10.00 |
| 2 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 3 | Tack coat (407E10000) | GAL | 69 | $1.05 | $1.25 | $3.00 | $3.00 | $3.00 | $10.00 |
| 4 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 32 | $656.25 | $700.00 | $575.00 | $575.00 | $575.00 | $850.00 |
| 5 | Edge line, 6" (646E10010) | MI | 0.16 | $17,063 | $22,500 | $22,240 | $16,250 | $22,240 | $20,000 |
| 6 | Center line (646E10200) | MI | 0.08 | $17,063 | $45,000 | $29,650 | $16,250 | $29,650 | $20,000 |
| 7 | Detour signing (614E12420) | LS | 1 | $5,822.25 | $4,000.00 | $10,000 | $8,000.00 | $6,500.00 | $5,000.00 |
| 8 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $57,624 | $52,000 | $110,000 | $156,000 | $145,000 | $82,650 |
| 9 | Epoxy coated steel reinforcement (509E10000) | LB | 875 | $4.03 | $5.00 | $6.00 | $3.50 | $2.50 | $4.40 |
| 10 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 100 | $1.88 | $5.00 | $3.00 | $4.00 | $2.00 | $4.30 |
| 11 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 90 | $28.65 | $30.00 | $40.00 | $19.00 | $24.00 | $50.25 |
| 12 | Class QC2 concrete, superstructure (511E34410) | CY | 19 | $2,560.66 | $2,200.00 | $2,200.00 | $4,000.00 | $3,500.00 | $2,620.00 |
| 13 | Structural steel, misc.: end crossframes and plate (513E90000) | LB | 2,522 | $4.65 | $12.00 | $10.00 | $10.00 | $10.00 | $15.50 |
| 14 | Field painting, misc.: field painting of replaced (514E27700) | SF | 336 | $63.57 | $100.00 | $115.00 | $90.00 | $90.00 | $225.00 |
| 15 | Structural expansion joint including elastomeric strip seal, as per plan (516E11211) | FT | 111 | $1,033.07 | $900.00 | $815.00 | $800.00 | $1,000.00 | $1,155.00 |
| 16 | Joint sealer, as per plan (516E31001) | FT | 100 | $28.44 | $20.00 | $40.00 | $38.00 | $15.00 | $11.55 |
| 17 | 2" deep joint sealer, as per plan (516E31011) | FT | 105 | $28.44 | $20.00 | $40.00 | $25.50 | $15.00 | $10.50 |
| 18 | Galvanic anode protection, as per plan (844E20001) | EACH | 66 | $57.30 | $30.00 | $80.00 | $60.00 | $50.00 | $95.50 |
| 19 | Superplasticized dense concrete overlay using hydrodemolition (848E10200) | SY | 1,058 | $81.32 | $65.00 | $75.00 | $70.00 | $90.00 | $83.15 |
| 20 | Surface preparation using hydrodemolition, as per plan (848E20001) | SY | 1,029 | $40.64 | $59.00 | $90.00 | $80.00 | $80.00 | $84.15 |
| 21 | Superplasticized dense concrete overlay (variable thickness), material only (848E30200) | CY | 23 | $675.75 | $400.00 | $600.00 | $455.00 | $510.00 | $615.00 |
| 22 | Hand chipping (848E50000) | SY | 62 | $237.04 | $140.00 | $161.00 | $80.00 | $135.00 | $188.00 |
| 23 | Test slab (848E50100) | LS | 1 | $2,289.00 | $500.00 | $1,500.00 | $1,500.00 | $2,500.00 | $2,400.00 |
| 24 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,081.89 | $13,000 | $5,000.00 | $6,000.00 | $12,500 | $10,000 |
| 25 | Maintaining traffic (614E11000) | LS | 1 | $3,405.60 | $25,000 | $32,000 | $25,000 | $22,500 | $28,000 |
| 26 | Construction layout stakes and surveying (623E10000) | LS | 1 | $105.00 | $5,000.00 | $2,000.00 | $7,000.00 | $500.00 | $5,000.00 |
| 27 | Mobilization (624E10000) | LS | 1 | $20,102 | $53,000 | $30,000 | $30,000 | $35,000 | $86,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.