ODOT contract 260324 bid tabulation
PER-SR 345-06.48 (BRIDGE REPAIR). Let by Ohio DOT on June 25, 2026, PER. 6 bids received; low bid $867,500 by Buds Inc, -16% against the engineer's estimate of $1,030,000.
- Owner
- Ohio DOT
- Letting
- 25 JUN 2026
- Pay items
- 72
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Buds Inc | $867,500 | Low | -16% |
| 2 | Double Z Construction Company | $868,768 | 0.0% | -16% |
| 3 | Miller Bros Const Inc | $920,157 | +6.0% | -11% |
| 4 | Axis Civil Construction LLC | $945,964 | +9.0% | -8.0% |
| 5 | Complete General Construction Company | $1,148,207 | +32% | +11% |
| 6 | Alan Stone Co Inc | $1,162,101 | +34% | +13% |
Engineer's estimate: $1,030,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Buds Inc | 2. Double Z Construction Company | 3. Miller Bros Const Inc | 4. Axis Civil Construction LLC | 5. Complete General Construction Company | 6. Alan Stone Co Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $7,000.00 | $6,000.00 | $1,150.80 | $12,500 | $3,000.00 | $21,000 |
| 2 | Pavement removed (202E23000) | SY | 358 | $21.00 | $26.00 | $13.25 | $10.00 | $20.00 | $20.00 |
| 3 | Wearing course removed (202E23500) | SY | 333 | $15.00 | $18.00 | $9.20 | $10.00 | $40.00 | $20.00 |
| 4 | Guardrail removed (202E38000) | FT | 400 | $4.00 | $5.00 | $3.36 | $6.80 | $10.00 | $5.50 |
| 5 | Fence removed (202E75000) | FT | 80 | $4.00 | $3.00 | $7.50 | $6.00 | $40.00 | $6.50 |
| 6 | Excavation (203E10000) | CY | 101 | $65.00 | $40.00 | $65.81 | $34.00 | $30.00 | $50.00 |
| 7 | Embankment (203E20000) | CY | 277 | $65.00 | $55.00 | $33.08 | $40.00 | $35.00 | $65.00 |
| 8 | Subgrade compaction (204E10000) | SY | 736 | $5.00 | $7.00 | $4.91 | $3.00 | $9.00 | $9.50 |
| 9 | Reshaping under guardrail (209E15000) | STA | 5 | $10.00 | $100.00 | $209.36 | $10.00 | $500.00 | $10.00 |
| 10 | Guardrail, type MGS (606E15050) | FT | 300 | $24.00 | $25.98 | $25.98 | $24.00 | $25.98 | $30.00 |
| 11 | Anchor assembly, MGS type E (606E26150) | EACH | 4 | $2,700.00 | $2,300.00 | $2,300.00 | $2,700.00 | $2,300.00 | $2,300.00 |
| 12 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $2,700.00 | $2,290.00 | $2,290.00 | $2,700.00 | $2,290.00 | $2,300.00 |
| 13 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $3,500.00 | $500.00 | $3,138.00 | $1,600.00 | $3,000.00 | $3,700.00 |
| 14 | Post construction survey monument verification and report (623E51000) | LS | 1 | $2,000.00 | $500.00 | $1,964.00 | $1,600.00 | $3,000.00 | $3,700.00 |
| 15 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 7 | $150.00 | $215.00 | $147.98 | $185.00 | $250.00 | $200.00 |
| 16 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 24 | $110.00 | $110.00 | $157.17 | $145.00 | $195.00 | $150.00 |
| 17 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $150.00 | $400.00 | $545.92 | $450.00 | $500.00 | $350.00 |
| 18 | Seeding and mulching, class 2 (659E00510) | SY | 1,493 | $3.50 | $5.00 | $2.10 | $2.10 | $2.10 | $3.00 |
| 19 | Commercial fertilizer (659E20000) | TON | 0.20 | $750.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $680.00 |
| 20 | Lime (659E31000) | ACRE | 0.31 | $200.00 | $150.00 | $150.00 | $150.00 | $150.00 | $980.00 |
| 21 | Water (659E35000) | MGAL | 4 | $0.50 | $1.00 | $1.00 | $1.00 | $1.00 | $120.00 |
| 22 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | Pavement planing, asphalt concrete, variable depth (254E01000) | SY | 638 | $16.00 | $11.00 | $11.00 | $11.00 | $11.00 | $20.00 |
| 24 | Full depth pavement sawing (255E20000) | FT | 562 | $4.00 | $2.50 | $5.00 | $3.00 | $3.45 | $6.50 |
| 25 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 89 | $295.00 | $300.00 | $300.00 | $300.00 | $300.00 | $350.00 |
| 26 | Aggregate base (304E20000) | CY | 113 | $110.00 | $110.00 | $138.40 | $115.00 | $95.00 | $110.00 |
| 27 | Non-tracking tack coat (407E20000) | GAL | 154 | $4.10 | $4.50 | $4.50 | $4.50 | $4.50 | $6.50 |
| 28 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 48 | $315.00 | $405.00 | $405.00 | $405.00 | $405.00 | $480.00 |
| 29 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 56 | $290.00 | $325.00 | $325.00 | $325.00 | $325.00 | $380.00 |
| 30 | Raised pavement marker removed (621E54000) | EACH | 8 | $10.00 | $10.00 | $34.29 | $50.00 | $75.00 | $30.00 |
| 31 | Barrier reflector, type 2 bidirectional (626E00110) | EACH | 10 | $13.00 | $12.00 | $12.00 | $12.50 | $12.00 | $15.00 |
| 32 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 96 | $20.00 | $20.00 | $25.93 | $20.00 | $20.00 | $30.00 |
| 33 | Sign, flat sheet (630E80100) | SF | 14 | $28.00 | $32.00 | $26.43 | $28.00 | $32.00 | $30.00 |
| 34 | Removal of ground mounted sign and reerection, as per plan (630E85101) | EACH | 3 | $75.00 | $75.00 | $48.04 | $75.00 | $75.00 | $60.00 |
| 35 | Removal of ground mounted post support and disposal, as per plan (630E86003) | EACH | 4 | $25.00 | $15.00 | $22.08 | $25.00 | $15.00 | $25.00 |
| 36 | Edge line, 6" (646E10010) | MI | 0.17 | $12,000 | $27,280 | $18,000 | $18,000 | $18,000 | $22,000 |
| 37 | Center line (646E10200) | MI | 0.09 | $20,000 | $36,255 | $18,000 | $18,000 | $18,000 | $22,000 |
| 38 | Traffic compacted surface, type C (410E13000) | CY | 10 | $60.00 | $65.00 | $161.38 | $100.00 | $75.00 | $390.00 |
| 39 | Detour signing (614E12420) | LS | 1 | $5,100.00 | $7,000.00 | $4,365.80 | $4,400.00 | $10,500 | $5,900.00 |
| 40 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $110.00 | $200.00 | $500.00 | $250.00 | $750.00 | $600.00 |
| 41 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,650.00 | $400.00 | $1,006.39 | $1,000.00 | $1,010.00 | $1,800.00 |
| 42 | Water (616E10000) | MGAL | 1 | $0.50 | $50.00 | $152.46 | $1.00 | $90.00 | $1.00 |
| 43 | Portions of structure removed (202E11200) | LS | 1 | $25,000 | $40,000 | $39,785 | $65,000 | $135,000 | $55,000 |
| 44 | Portions of structure removed, as per plan (202E11301) | CY | 34 | $700.00 | $450.00 | $356.14 | $1,100.00 | $950.00 | $600.00 |
| 45 | Approach slab removed (202E22900) | SY | 142 | $45.00 | $50.00 | $52.65 | $50.00 | $120.00 | $60.00 |
| 46 | Bridge railing removed (202E38500) | FT | 125 | $10.00 | $10.00 | $9.86 | $18.00 | $65.00 | $60.00 |
| 47 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $2,000.00 | $3,000.00 | $1.20 | $7,500.00 | $500.00 | $500.00 |
| 48 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $34,000 | $30,000 | $48,559 | $28,000 | $40,000 | $30,000 |
| 49 | Galvanized steel reinforcement (509E26000) | LB | 12,108 | $3.00 | $2.20 | $2.20 | $3.20 | $2.00 | $2.50 |
| 50 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 152 | $75.00 | $25.00 | $29.71 | $40.00 | $15.00 | $35.00 |
| 51 | Class QC2 concrete, superstructure (511E31610) | CY | 43 | $1,500.00 | $1,800.00 | $1,855.63 | $1,920.00 | $2,055.00 | $2,200.00 |
| 52 | Class QC1 concrete, abutment not including footing (511E44110) | CY | 52 | $1,080.00 | $1,100.00 | $895.47 | $1,150.00 | $975.00 | $1,100.00 |
| 53 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 95 | $35.00 | $58.00 | $40.20 | $58.00 | $58.00 | $55.00 |
| 54 | Prestressed concrete composite box beam bridge members, level 1, CB21-48, as per plan (515E12051) | EACH | 8 | $4,500.00 | $3,500.00 | $6,978.78 | $3,010.00 | $10,000 | $3,900.00 |
| 55 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 118 | $20.00 | $16.00 | $9.81 | $11.00 | $25.00 | $15.00 |
| 56 | 2" preformed expansion joint filler, as per plan (516E13901) | SF | 36 | $30.00 | $24.00 | $16.37 | $40.00 | $40.00 | $35.00 |
| 57 | Semi-integral abutment expansion joint seal (516E14020) | FT | 77 | $50.00 | $36.00 | $38.75 | $62.00 | $55.00 | $45.00 |
| 58 | Structural joint or joint sealer, misc.: tear web (516E14600) | FT | 67 | $300.00 | $450.00 | $498.35 | $92.00 | $875.00 | $400.00 |
| 59 | 2" deep joint sealer (516E31010) | FT | 67 | $35.00 | $30.00 | $14.38 | $21.00 | $32.25 | $110.00 |
| 60 | Elastomeric bearing with internal laminates only (neoprene), as per plan (516E43101) | EACH | 32 | $135.00 | $50.00 | $123.82 | $51.00 | $150.00 | $180.00 |
| 61 | Railing (three steel tube bridge railing) (517E70100) | FT | 126 | $450.00 | $423.00 | $423.00 | $440.00 | $440.00 | $520.00 |
| 62 | Porous backfill with geotextile fabric (518E21200) | CY | 62 | $120.00 | $125.00 | $128.85 | $165.00 | $95.00 | $110.00 |
| 63 | Special - steel drip strip (518E22300) | FT | 129 | $20.00 | $25.00 | $22.72 | $25.00 | $16.00 | $40.00 |
| 64 | 6" perforated corrugated plastic pipe (518E40000) | FT | 111 | $14.00 | $10.00 | $12.48 | $16.00 | $15.00 | $25.00 |
| 65 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 60 | $14.00 | $18.00 | $18.89 | $16.00 | $20.00 | $15.00 |
| 66 | Reinforced concrete approach slabs (T=12"), as per plan (526E10001) | SY | 107 | $600.00 | $450.00 | $457.10 | $675.00 | $425.00 | $775.00 |
| 67 | Structure grounding system (625E33000) | EACH | 4 | $3,800.00 | $4,000.00 | $13,750 | $7,500.00 | $12,000 | $15,000 |
| 68 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,000.00 | $6,000.00 | $4,529.31 | $8,500.00 | $8,000.00 | $12,000 |
| 69 | Maintaining traffic (614E11000) | LS | 1 | $3,500.00 | $3,000.00 | $4,592.07 | $7,500.00 | $6,000.00 | $15,000 |
| 70 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $5,000.00 | $8,800.00 | $5,178.00 | $7,500.00 | $12,000 | $25,000 |
| 71 | Mobilization (624E10000) | LS | 1 | $30,000 | $50,000 | $38,951 | $40,000 | $61,000 | $100,000 |
| 72 | Special - calendar days of contract time for opening to traffic (unit price field should reflect number of days bid) (614E15000) | DLR | 3,000 | $45.00 | $45.00 | $45.00 | $45.00 | $42.00 | $45.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of June 25, 2026. Compiled by Mirage Metrics.