ODOT contract 250555 bid tabulation

FAY-US 22-06.21 (INTERSECTION). Let by Ohio DOT on December 18, 2025, FAY. 5 bids received; low bid $2,247,017 by John R Jurgensen Company, +6.1% against the engineer's estimate of $2,118,000.

Owner
Ohio DOT
Letting
18 DEC 2025
Pay items
128
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1John R Jurgensen Company$2,247,017Low+6.0%
2Fillmore Construction$2,248,9370.0%+6.0%
3R B Jergens Contractors Inc$2,249,4080.0%+6.0%
4Complete General Construction Company$2,254,9790.0%+6.0%
5Axis Civil Construction LLC$2,260,844+1.0%+7.0%
ODOT contract 250555: bids by rank

Engineer's estimate: $2,118,000.

Bid tabulation

LinePay itemUnitQuantity1. John R Jurgensen Company2. Fillmore Construction3. R B Jergens Contractors Inc4. Complete General Construction Company5. Axis Civil Construction LLC
1Clearing and grubbing (201E11000)LS1$2,576.98$10,000$10,315$13,000$20,000
2Pavement removed (202E23000)SY445$14.00$8.00$17.49$15.00$20.00
3Concrete median removed (202E30600)SY20$33.41$25.00$65.14$60.00$50.00
4Curb removed (202E32000)FT560$11.39$10.00$8.09$10.00$16.00
5Removal misc.: (wood post) (202E98100)EACH5$272.89$100.00$127.44$80.00$150.00
6Excavation (203E10000)CY868$20.15$30.00$17.89$35.00$30.00
7Embankment (203E20000)CY2,543$26.35$50.00$21.32$7.00$36.00
8Embankment, as per plan (203E20001)CY58$95.21$200.00$66.35$250.00$140.00
9Subgrade compaction (204E10000)SY6,708$2.14$5.00$3.88$4.50$3.00
10Excavation of subgrade (204E13000)CY400$50.11$30.00$27.37$35.00$30.00
11Granular material, type B (204E30010)CY400$111.39$100.00$55.35$60.00$125.00
12Proof rolling (204E45000)HR3$251.95$150.00$321.32$300.00$300.00
13Geotextile fabric (204E50000)SY1,547$3.17$3.00$3.73$3.00$3.00
14Detectable warning (608E53020)SF96$50.00$30.00$355.74$40.00$50.00
15Inspection and compaction testing of unbound materials (878E25000)LS1$15,730$10,000$33,517$27,500$22,000
16Tied concrete block mat with type 2 underlayment (601E21060)SY73$189.24$30.00$101.59$120.00$110.00
17Soil analysis test (659E00100)EACH1$150.00$500.00$76.80$75.00$150.00
18Topsoil (659E00300)CY662$43.13$50.00$30.21$65.00$48.00
19Seeding and mulching (659E10000)SY5,108$1.35$1.25$1.95$1.90$1.00
20Repair seeding and mulching (659E14000)SY256$1.35$2.20$1.95$1.90$1.00
21Inter-seeding (659E15000)SY256$1.00$2.20$1.95$1.90$1.00
22Commercial fertilizer (659E20000)TON0.69$925.00$1,400.00$778.26$760.00$1,250.00
23Lime (659E31000)ACRE1.06$100.00$450.00$51.20$50.00$150.00
24Water (659E35000)MGAL28$1.00$100.00$51.20$50.00$1.00
25Mowing (659E40000)MSF2$200.00$1,000.00$184.33$180.00$100.00
26Slope erosion protection (670E00500)SY842$3.20$2.00$4.46$4.35$2.50
27Storm water pollution prevention plan (832E15000)LS1$2,500.00$3,500.00$2,457.68$2,500.00$2,500.00
28Storm water pollution prevention inspections (832E15002)LS1$3,880.00$5,000.00$8,601.87$10,000$7,350.00
29Storm water pollution prevention inspection software (832E15010)LS1$9,934.04$10,000$10,240$10,000$10,000
30Erosion control (832E30000)EACH40,000$1.00$1.00$1.00$1.00$1.00
316" unclassified pipe underdrains (605E13300)FT531$56.17$20.00$25.08$21.00$25.00
326" base pipe underdrains (605E14000)FT1,786$37.78$12.00$19.85$20.00$20.00
336" conduit, type F (611E01500)FT100$89.38$50.00$33.53$22.00$25.00
34Precast reinforced concrete outlet (611E99710)EACH10$750.23$500.00$1,103.26$250.00$500.00
35Pavement planing, asphalt concrete, 1.5" (254E01000)SY1,818$5.15$5.00$5.64$7.85$8.00
36Asphalt concrete base, PG64-22, (449) (301E56000)CY974$240.00$240.00$263.02$201.25$215.00
37Aggregate base (304E20000)CY1,118$110.52$80.00$59.39$90.00$125.00
38Non-tracking tack coat (407E20000)GAL1,287$5.00$5.00$5.48$4.10$4.00
39Asphalt concrete surface course, type 1, (449), (driveways) (441E70500)CY3$2,000.00$500.00$2,191.88$525.00$1,500.00
40Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000)CY291$318.00$280.00$348.51$274.25$274.00
41Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080)CY250$450.00$260.00$493.17$277.25$280.00
427" non-reinforced concrete pavement, class QC 1P with QC/QA (452E11020)SY358$114.39$103.00$131.89$105.00$175.00
43Combination curb and gutter, type 3 (609E18000)FT1,017$45.97$40.00$32.83$37.00$39.00
44Curb, type 4-C (609E24510)FT558$35.29$30.00$20.76$45.00$39.00
45Curb, type 6 (609E26000)FT484$38.36$32.00$23.37$35.00$35.00
46Combination curb and gutter, type 9 (609E31000)FT290$45.02$40.00$26.08$45.00$40.00
47Concrete median (609E71000)SF5,386$16.05$15.00$11.54$14.00$17.00
48Connection, fused pull apart (625E00450)EACH20$275.00$105.26$281.61$145.00$125.00
49Connection, unfused permanent (625E00480)EACH21$225.00$74.32$230.41$115.00$125.00
50Light pole, conventional, AT15B40 (625E10490)EACH10$3,973.13$4,108.29$4,068.61$3,000.00$4,000.00
51Light pole foundation, 24" X 8' deep (625E14100)EACH10$1,750.00$2,000.00$1,792.06$2,400.00$2,600.00
52No. 4 AWG 2400 volt distribution cable (625E23200)FT1,845$1.85$3.75$1.89$3.75$5.00
53No. 10 AWG pole and bracket cable (625E23400)FT1,650$0.51$1.32$0.52$2.50$0.50
54Conduit, 3", 725.04 (625E25500)FT1,066$2.54$22.01$2.60$30.00$36.00
55Conduit, jacked or drilled, 725.04 (3") (625E25902)FT221$55.00$75.97$56.32$51.00$60.00
56Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH10$476.01$284.00$487.45$540.00$478.00
57Trench (625E29000)FT1,039$20.00$11.37$20.48$9.00$14.00
58Pull box, 725.08, 18" (625E30700)EACH5$643.37$1,356.66$658.83$1,300.00$1,200.00
59Pull box, 725.08, 24" (625E30706)EACH1$846.35$1,500.00$866.69$1,500.00$1,500.00
60Pull box removed (625E31510)EACH2$575.00$401.00$588.82$250.00$350.00
61Ground rod (625E32000)EACH10$125.00$225.00$128.00$325.00$265.00
62Power service, as per plan (625E34001)EACH1$2,575.00$13,500$2,636.88$9,500.00$10,500
63Underground warning marking tape (625E36010)FT1,260$1.75$2.20$1.79$1.25$3.00
64Temporary lighting (625E39000)LS1$21,175$8,500.00$21,684$17,000$10,000
65Special - maintain existing lighting (625E40000)LS1$15,000$2,000.00$15,360$1,700.00$8,000.00
66Light pole removed for storage, as per plan (625E75403)EACH2$1,250.00$401.00$1,280.04$375.00$400.00
67Disconnect circuit, as per plan (625E75801)EACH1$750.00$251.00$768.02$350.00$125.00
68Arc flash calculations and label, fay-22-6.21 (625E76000)EACH1$3,500.00$5,000.00$3,584.11$3,650.00$3,450.00
69Conduit riser, 2" diameter (632E70400)EACH1$1,750.00$1,511.00$1,792.06$1,100.00$725.00
70Controller work pad (633E67200)EACH1$1,275.00$2,600.00$1,305.64$1,200.00$750.00
71RPM (621E00100)EACH69$89.00$89.00$91.14$78.00$89.00
72Ground mounted support, no. 2 post (630E02100)FT248$17.00$17.00$21.28$16.00$17.00
73Ground mounted support, no. 3 post (630E03100)FT178$18.00$18.50$23.09$17.50$18.00
74Ground mounted support, no. 4 post (630E04100)FT59$25.00$25.00$30.31$20.00$25.00
75Ground mounted structural beam support, S4X7.7 (630E06400)FT26$30.00$30.00$30.72$74.00$30.00
76Sign post reflector (630E08600)EACH15$50.00$50.00$67.09$45.00$50.00
77Breakaway structural beam connection (630E09000)EACH2$200.00$200.00$204.81$645.00$200.00
78Sign, flat sheet (630E80100)SF220$25.00$25.00$24.89$18.00$25.00
79Sign, ground mounted extrusheet (630E80200)SF27$30.00$30.00$30.72$29.00$30.00
80Removal of ground mounted sign and disposal (630E84900)EACH30$20.00$22.00$16.96$10.00$20.00
81Removal of ground mounted post support and disposal (630E86002)EACH26$20.00$22.00$22.61$15.00$20.00
82Removal of ground mounted structural beam support (630E86102)EACH3$500.00$500.00$22.53$365.00$500.00
83Edge line, 6" (644E00104)MI0.74$8,085.00$8,085.00$8,279.30$5,395.00$5,395.00
84Center line (644E00300)MI0.14$10,770$10,770$11,029$8,305.00$8,305.00
85Transverse/diagonal line (644E00700)FT45$12.25$12.25$12.54$10.40$10.40
86Railroad symbol marking (644E01000)EACH1$750.00$750.00$768.02$525.00$525.00
87Dotted line, 12" (644E01520)FT203$3.65$3.65$3.74$6.20$6.20
88Yield line (644E20800)FT73$15.75$15.75$16.13$41.50$41.50
89Traffic compacted surface, type A or B (410E12000)CY50$195.18$50.00$71.91$70.00$75.00
90Traffic compacted surface, type C (410E13000)CY50$195.18$200.00$71.91$80.00$75.00
91Law enforcement officer with patrol car for assistance (614E11110)HR20$143.53$120.00$155.32$90.00$75.00
92Increased barrier delineation (614E11630)FT200$2.00$3.00$2.19$3.00$2.20
93Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH7$2,000.00$2,000.00$1,911.80$2,500.00$2,400.00
94Detour signing (614E12420)LS1$11,825$20,000$17,395$30,000$18,000
95Asphalt concrete for maintaining traffic (614E13000)CY50$246.87$400.00$136.99$250.00$250.00
96Barrier reflector, type 1, (BI-directional) (614E13310)EACH37$10.00$12.00$9.41$7.00$9.00
97Barrier reflector, type 1, (one-way) (614E13310)EACH49$10.00$10.00$9.41$6.00$9.00
98Object marker, one way (614E13350)EACH49$20.00$20.00$19.13$10.00$18.00
99Object marker, two way (614E13360)EACH37$20.00$21.00$21.24$12.00$20.00
100Work zone lane line, class I, 6" (614E20010)MI0.04$1,115.00$1,115.00$1,141.75$610.00$1,115.00
101Work zone lane line, class III, 4", 642 paint (614E20550)MI0.01$1,340.00$1,340.00$1,372.00$520.00$1,340.00
102Work zone center line, class I (614E21000)MI0.58$2,850.00$2,850.00$2,918.48$2,255.00$2,850.00
103Work zone center line, class I, 740.06, type I (614E21200)MI0.22$12,273$12,273$12,568$15,745$12,500
104Work zone center line, class III, 642 paint (614E21550)MI0.08$1,860.00$1,860.00$1,904.75$1,500.00$1,860.00
105Work zone edge line, class I, 4" (614E22000)MI1.34$1,780.00$1,780.00$1,822.78$1,315.00$1,780.00
106Work zone edge line, class I, 6" (614E22010)MI0.64$2,340.00$2,340.00$2,396.23$1,575.00$2,340.00
107Work zone edge line, class I, 4", 740.06, type I (614E22200)MI1.38$7,101.96$7,101.96$7,272.63$10,450$7,000.00
108Work zone edge line, class III, 4", 642 paint (614E22350)MI0.48$1,565.00$1,565.00$1,602.60$975.00$1,565.00
109Work zone channelizing line, class I, 8" (614E23000)FT862$1.00$1.00$1.02$0.80$1.00
110Work zone channelizing line, class I, 8", 740.06, type I (614E23400)FT99$2.43$2.43$2.49$3.00$2.50
111Work zone dotted line, class I (614E24000)FT317$0.95$95.00$0.97$0.45$1.00
112Work zone dotted line, class I, 4", 740.06, type I (614E24400)FT279$1.55$1.55$1.59$1.30$1.55
113Work zone dotted line, class III, 4", 642 paint (614E24610)FT87$0.90$9.00$0.92$0.45$0.90
114Work zone transverse/diagonal line, class III, 642 paint (614E25620)FT375$3.25$3.25$3.33$0.90$3.25
115Work zone arrow, class I (614E30000)EACH4$100.00$100.00$102.40$135.00$100.00
116Work zone arrow, class I, 740.06, type I (614E30400)EACH1$229.05$229.05$234.55$615.00$230.00
117Work zone railroad symbol marking, class I (614E32000)EACH1$475.00$475.00$486.41$200.00$475.00
118Business entrance sign (614E40050)EACH4$125.00$1,000.00$217.83$400.00$215.00
119Pavement for maintaining traffic, class B (615E25000)SY2,813$80.00$85.00$96.40$65.00$55.00
120Water (616E10000)MGAL36$150.85$100.00$141.02$80.00$1.00
121Portable barrier, unanchored (622E41100)FT4,260$18.25$20.00$18.44$18.00$29.00
122Premium for contract performance bond and for payment bond (103E05000)LS1$18,621$28,000$8,853.24$17,500$12,950
123Maintaining traffic (614E11000)LS1$55,798$175,000$92,000$125,000$100,000
124Construction layout stakes and surveying (623E10000)LS1$12,945$25,000$27,751$107,500$29,000
125Mobilization (624E10000)LS1$100,000$125,000$100,000$100,000$100,000
200Ground mounted structural beam support foundation (630E84500)EACH2$1,200.00$1,250.00$1,280.04$1,650.00$1,200.00
201Pavement removed, as per plan (202E23001)SY8,767$16.30$10.00$20.67$27.00$16.00
202Roads for maintaining traffic (615E10000)LS1$67,041$5,000.00$50,102$42,500$65,000
ODOT contract 250555: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy