ODOT contract 260156 bid tabulation
LOG-US 33-09.58 (INTERSECTION). Let by Ohio DOT on March 26, 2026, LOG. 5 bids received; low bid $3,999,678 by Eagle Bridge Co, -11% against the engineer's estimate of $4,513,000.
- Owner
- Ohio DOT
- Letting
- 26 MAR 2026
- Pay items
- 121
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eagle Bridge Co | $3,999,678 | Low | -11% |
| 2 | R B Jergens Contractors Inc | $4,619,919 | +16% | +2.0% |
| 3 | Helms and Sons Excavating | $4,727,601 | +18% | +5.0% |
| 4 | Trucco Construction Co Inc | $5,135,394 | +28% | +14% |
| 5 | Complete General Construction Company | $5,335,943 | +33% | +18% |
Engineer's estimate: $4,513,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eagle Bridge Co | 2. R B Jergens Contractors Inc | 3. Helms and Sons Excavating | 4. Trucco Construction Co Inc | 5. Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $1,500.00 | $9,483.89 | $75,000 | $5,000.00 | $10,000 |
| 2 | Pavement removed (202E23000) | SY | 9,844 | $9.00 | $10.01 | $4.00 | $10.50 | $20.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 1,614 | $8.00 | $34.27 | $18.00 | $49.00 | $18.00 |
| 4 | Pipe removed, over 24" diameter (202E35200) | FT | 369 | $30.00 | $47.93 | $20.00 | $54.00 | $32.00 |
| 5 | Mailbox removed (202E53100) | EACH | 1 | $25.00 | $317.00 | $98.00 | $35.00 | $150.00 |
| 6 | Catch basin removed (202E58100) | EACH | 3 | $250.00 | $683.88 | $300.00 | $870.00 | $450.00 |
| 7 | Fence removed (202E75000) | FT | 1,050 | $4.00 | $9.73 | $4.00 | $2.80 | $10.00 |
| 8 | Removal misc.: concrete foundation removed (202E98100) | EACH | 3 | $125.00 | $1,099.24 | $450.00 | $284.00 | $300.00 |
| 9 | Excavation (203E10000) | CY | 4,179 | $10.00 | $16.77 | $18.00 | $38.00 | $36.00 |
| 10 | Embankment (203E20000) | CY | 6,994 | $7.50 | $9.85 | $8.00 | $12.75 | $21.00 |
| 11 | Subgrade compaction (204E10000) | SY | 12,468 | $2.25 | $2.53 | $2.00 | $2.45 | $4.00 |
| 12 | Excavation of subgrade (204E13000) | CY | 6,046 | $11.00 | $19.11 | $18.00 | $23.65 | $35.00 |
| 13 | Granular material, type B (204E30010) | CY | 9,014 | $50.00 | $51.69 | $52.00 | $88.00 | $60.00 |
| 14 | Proof rolling (204E45000) | HR | 4 | $250.00 | $303.39 | $125.00 | $367.00 | $350.00 |
| 15 | Geotextile fabric (204E50000) | SY | 12,468 | $2.00 | $3.98 | $2.00 | $2.65 | $4.00 |
| 16 | Fence, type 47 (607E15000) | FT | 848 | $23.75 | $28.89 | $25.00 | $21.15 | $25.00 |
| 17 | Monument assembly, type C (623E38500) | EACH | 2 | $2,000.00 | $2,517.10 | $3,750.00 | $3,210.00 | $1,000.00 |
| 18 | Reference monument, type A (623E40500) | EACH | 1 | $1,250.00 | $1,418.09 | $1,950.00 | $1,080.00 | $1,000.00 |
| 19 | Special - mailbox support system, single (690E50100) | EACH | 1 | $300.00 | $314.49 | $325.00 | $292.00 | $300.00 |
| 20 | Riprap, type D (601E11000) | SY | 13 | $650.00 | $304.45 | $1,750.00 | $483.00 | $145.00 |
| 21 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 162 | $95.00 | $85.85 | $90.00 | $173.00 | $110.00 |
| 22 | Rock channel protection, type C with filter (601E32200) | CY | 14 | $150.00 | $142.16 | $98.00 | $139.00 | $150.00 |
| 23 | Rock channel protection, type D with aggregate filter, as per plan (601E32311) | CY | 85 | $175.00 | $121.49 | $125.00 | $153.00 | $150.00 |
| 24 | Soil analysis test (659E00100) | EACH | 2 | $200.00 | $213.37 | $250.00 | $550.00 | $60.00 |
| 25 | Topsoil (659E00300) | CY | 2,954 | $5.00 | $31.15 | $25.00 | $6.65 | $35.00 |
| 26 | Seeding and mulching (659E10000) | SY | 26,615 | $1.00 | $1.28 | $1.00 | $0.85 | $0.90 |
| 27 | Repair seeding and mulching (659E14000) | SY | 1,331 | $0.50 | $1.28 | $1.00 | $1.10 | $0.90 |
| 28 | Inter-seeding (659E15000) | SY | 1,331 | $0.01 | $1.28 | $1.00 | $1.10 | $0.50 |
| 29 | Commercial fertilizer (659E20000) | TON | 5.99 | $1,000.00 | $810.82 | $1,200.00 | $930.00 | $850.00 |
| 30 | Lime (659E31000) | ACRE | 5.50 | $200.00 | $53.34 | $230.00 | $640.00 | $35.00 |
| 31 | Water (659E35000) | MGAL | 151 | $1.00 | $53.34 | $1.50 | $15.00 | $1.00 |
| 32 | Mowing (659E40000) | MSF | 240 | $5.00 | $10.67 | $1.50 | $20.00 | $5.00 |
| 33 | Slope erosion protection (670E00500) | SY | 7,637 | $2.00 | $4.80 | $2.50 | $2.80 | $1.80 |
| 34 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,750.00 | $2,773.87 | $3,800.00 | $3,400.00 | $3,400.00 |
| 35 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $15,000 | $10,082 | $14,500 | $12,800 | $11,000 |
| 36 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $15,000 | $14,936 | $15,000 | $19,500 | $13,300 |
| 37 | Erosion control (832E30000) | EACH | 97,960 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 38 | Concrete masonry (602E20000) | CY | 4 | $2,500.00 | $3,458.13 | $3,000.00 | $4,990.00 | $2,500.00 |
| 39 | 6" unclassified pipe underdrains (605E13300) | FT | 726 | $10.00 | $11.44 | $18.00 | $12.00 | $18.00 |
| 40 | 6" base pipe underdrains (605E14000) | FT | 3,959 | $10.00 | $17.18 | $18.00 | $12.00 | $17.00 |
| 41 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 398 | $22.00 | $24.19 | $32.00 | $40.00 | $25.00 |
| 42 | 8" conduit, type C (611E02000) | FT | 348 | $35.00 | $47.62 | $75.00 | $46.00 | $60.00 |
| 43 | 12" conduit, type B (611E04400) | FT | 487 | $65.00 | $90.70 | $100.00 | $92.00 | $125.00 |
| 44 | 12" conduit, type E (611E05100) | FT | 346 | $35.00 | $64.65 | $85.00 | $61.00 | $40.00 |
| 45 | 12" conduit, type F (611E05200) | FT | 50 | $35.00 | $70.73 | $85.00 | $62.00 | $40.00 |
| 46 | 15" conduit, type B (611E05900) | FT | 269 | $65.00 | $117.54 | $90.00 | $122.00 | $150.00 |
| 47 | 30" conduit, type A (611E13200) | FT | 105 | $175.00 | $205.51 | $215.00 | $190.00 | $340.00 |
| 48 | 36" conduit, type A (611E16200) | FT | 101 | $250.00 | $256.41 | $260.00 | $277.00 | $290.00 |
| 49 | 19" X 30" conduit, type A, 706.04 (611E52300) | FT | 142 | $210.00 | $217.69 | $215.00 | $202.00 | $298.00 |
| 50 | Conduit, bored or jacked, 15" type B (611E96600) | FT | 181 | $500.00 | $672.48 | $715.00 | $403.00 | $660.00 |
| 51 | Catch basin, no. 2-2B (611E98470) | EACH | 6 | $2,500.00 | $2,306.41 | $2,750.00 | $3,990.00 | $2,500.00 |
| 52 | Precast reinforced concrete outlet (611E99710) | EACH | 14 | $400.00 | $1,627.99 | $550.00 | $580.00 | $350.00 |
| 53 | Drainage structure, misc.:combination curb & gutte (611E99900) | EACH | 5 | $400.00 | $2,922.65 | $1,850.00 | $2,830.00 | $1,200.00 |
| 54 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 20 | $80.00 | $89.34 | $360.00 | $182.00 | $80.00 |
| 55 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 2,705 | $230.00 | $256.86 | $285.00 | $241.00 | $230.00 |
| 56 | Aggregate base (304E20000) | CY | 2,103 | $65.00 | $60.10 | $52.00 | $104.00 | $92.00 |
| 57 | Non-tracking tack coat (407E20000) | GAL | 1,596 | $3.00 | $3.35 | $4.00 | $3.00 | $3.00 |
| 58 | Stabilized crushed aggregate (411E10000) | CY | 66 | $100.00 | $79.77 | $89.00 | $154.00 | $140.00 |
| 59 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 398 | $370.00 | $413.21 | $285.00 | $388.00 | $370.00 |
| 60 | Asphalt concrete intermediate course, 12.5 MM, type A (448) (442E20170) | CY | 464 | $260.00 | $290.37 | $280.00 | $273.00 | $260.00 |
| 61 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 764 | $72.00 | $89.03 | $104.00 | $88.00 | $100.00 |
| 62 | Non-reinforced concrete pavement, misc.:concrete S (452E19200) | SY | 1,205 | $81.00 | $99.53 | $157.00 | $149.00 | $175.00 |
| 63 | Combination curb and gutter, type 3 (609E18000) | FT | 806 | $30.00 | $36.37 | $35.00 | $47.00 | $50.00 |
| 64 | Curb, type 3-B, as per plan (609E22001) | FT | 1,529 | $22.00 | $33.13 | $35.00 | $30.00 | $45.00 |
| 65 | Combination curb and gutter, type 9 (609E31000) | FT | 722 | $29.00 | $41.69 | $35.00 | $36.00 | $50.00 |
| 66 | Curb, type 10 (609E33000) | FT | 180 | $20.00 | $151.14 | $32.00 | $40.00 | $55.00 |
| 67 | Connection, fused pull apart (625E00450) | EACH | 13 | $140.00 | $81.25 | $185.00 | $148.00 | $140.00 |
| 68 | Connection, unfused pull apart (625E00460) | EACH | 13 | $135.00 | $89.78 | $185.00 | $142.00 | $135.00 |
| 69 | Connection, unfused permanent (625E00480) | EACH | 18 | $125.00 | $49.85 | $180.00 | $132.00 | $125.00 |
| 70 | Light pole, conventional, as per plan, (AT10B30) (625E10491) | EACH | 13 | $2,700.00 | $3,543.09 | $4,700.00 | $2,840.00 | $2,900.00 |
| 71 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 13 | $1,750.00 | $2,400.47 | $2,290.00 | $1,840.00 | $2,100.00 |
| 72 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 699 | $4.00 | $3.48 | $7.00 | $4.20 | $4.00 |
| 73 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,560 | $2.25 | $0.58 | $3.00 | $2.35 | $2.50 |
| 74 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 2,071 | $16.00 | $14.26 | $19.00 | $16.85 | $18.00 |
| 75 | Conduit, 2", 725.051 (625E25408) | FT | 20 | $9.00 | $1.32 | $10.00 | $9.50 | $11.00 |
| 76 | Conduit, 4", 725.04 (625E25600) | FT | 203 | $44.00 | $42.08 | $52.00 | $46.00 | $46.00 |
| 77 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 13 | $475.00 | $321.58 | $575.00 | $500.00 | $500.00 |
| 78 | Trench (625E29000) | FT | 2,042 | $8.25 | $24.00 | $12.00 | $8.70 | $9.00 |
| 79 | Pull box, 725.08, 18" (625E30700) | EACH | 5 | $1,400.00 | $721.21 | $1,200.00 | $1,480.00 | $1,500.00 |
| 80 | Pull box, 725.08, 24" (625E30706) | EACH | 2 | $1,700.00 | $1,404.28 | $1,450.00 | $1,790.00 | $1,750.00 |
| 81 | Ground rod (625E32000) | EACH | 13 | $350.00 | $144.03 | $325.00 | $369.00 | $350.00 |
| 82 | Power service, as per plan (625E34001) | EACH | 1 | $8,400.00 | $8,001.56 | $8,200.00 | $8,900.00 | $8,400.00 |
| 83 | Underground warning marking tape (625E36010) | FT | 2,042 | $1.50 | $1.50 | $2.00 | $1.60 | $1.50 |
| 84 | High voltage test (625E38000) | LS | 1 | $2,000.00 | $1,333.59 | $2,650.00 | $2,110.00 | $2,000.00 |
| 85 | Arc flash calculations and label, (PS-A) (625E76000) | EACH | 1 | $3,700.00 | $1,333.59 | $3,500.00 | $3,900.00 | $3,700.00 |
| 86 | Delineator, post ground mounted (620E00500) | EACH | 4 | $49.50 | $84.22 | $100.00 | $95.00 | $49.50 |
| 87 | RPM (621E00100) | EACH | 285 | $43.00 | $44.81 | $50.00 | $43.00 | $55.00 |
| 88 | Ground mounted support, no. 3 post (630E03100) | FT | 364 | $17.00 | $27.33 | $20.00 | $19.25 | $15.50 |
| 89 | Sign post reflector (630E08600) | EACH | 14 | $55.00 | $79.71 | $49.00 | $45.00 | $55.00 |
| 90 | Sign, flat sheet (630E80100) | SF | 188 | $16.00 | $29.41 | $25.00 | $23.50 | $16.00 |
| 91 | Removal of ground mounted sign and disposal (630E84900) | EACH | 46 | $15.00 | $18.16 | $16.00 | $15.00 | $15.00 |
| 92 | Removal of ground mounted post support and disposal (630E86002) | EACH | 45 | $20.00 | $24.22 | $21.00 | $20.00 | $20.00 |
| 93 | Edge line, 6" (644E00104) | MI | 1.61 | $5,000.00 | $3,307.31 | $4,800.00 | $3,100.00 | $3,100.00 |
| 94 | Center line (644E00300) | MI | 0.84 | $10,000 | $5,974.50 | $7,000.00 | $5,600.00 | $5,600.00 |
| 95 | Transverse/diagonal line (644E00700) | FT | 567 | $8.00 | $8.53 | $8.00 | $8.00 | $8.00 |
| 96 | Dotted line, 12" (644E01520) | FT | 110 | $4.00 | $1.07 | $2.50 | $1.00 | $1.00 |
| 97 | Yield line (644E20800) | FT | 72 | $33.75 | $10.67 | $10.50 | $10.00 | $10.00 |
| 98 | Traffic compacted surface, type A (410E10000) | CY | 55 | $80.00 | $67.67 | $60.00 | $187.00 | $98.94 |
| 99 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 100 | $295.00 | $329.45 | $285.00 | $309.00 | $295.00 |
| 100 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 120 | $120.00 | $166.05 | $75.00 | $135.00 | $90.00 |
| 101 | Increased barrier delineation (614E11630) | FT | 1,440 | $1.50 | $2.03 | $1.50 | $1.90 | $2.00 |
| 102 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 6 | $2,000.00 | $2,096.47 | $3,500.00 | $1,970.00 | $1,970.00 |
| 103 | Detour signing (614E12420) | LS | 1 | $17,500 | $14,506 | $8,000.00 | $13,600 | $13,790 |
| 104 | Work zone lighting system, as per plan (614E12741) | EACH | 1 | $19,000 | $24,005 | $30,000 | $20,000 | $22,000 |
| 105 | Work zone raised pavement marker (614E12800) | EACH | 56 | $12.00 | $8.33 | $55.00 | $7.80 | $8.00 |
| 106 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 79 | $12.00 | $14.03 | $12.00 | $13.15 | $14.00 |
| 107 | Object marker, two way (614E13360) | EACH | 79 | $20.00 | $21.56 | $21.00 | $20.20 | $21.00 |
| 108 | Portable changeable message sign, as per plan (614E18601) | SNMT | 4 | $1,000.00 | $1,004.08 | $1,200.00 | $940.00 | $950.00 |
| 109 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.91 | $17,500 | $13,862 | $17,500 | $13,000 | $12,993 |
| 110 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.38 | $8,240.00 | $2,667.18 | $2,100.00 | $2,500.00 | $2,500.00 |
| 111 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 1.84 | $9,500.00 | $11,022 | $13,100 | $10,300 | $10,331 |
| 112 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 0.44 | $4,270.00 | $2,453.82 | $2,100.00 | $2,300.00 | $2,300.00 |
| 113 | Roads for maintaining traffic (615E10000) | LS | 1 | $225,000 | $110,400 | $215,000 | $250,000 | $325,000 |
| 114 | Pavement for maintaining traffic, class A (615E20000) | SY | 5,030 | $71.00 | $81.65 | $58.00 | $64.00 | $64.00 |
| 115 | Water (616E10000) | MGAL | 25 | $30.00 | $135.64 | $125.00 | $86.00 | $85.00 |
| 116 | Portable barrier, unanchored (622E41100) | FT | 3,950 | $16.00 | $32.76 | $80.00 | $16.60 | $29.50 |
| 117 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $40,000 | $18,819 | $25,000 | $28,800 | $27,000 |
| 118 | Maintaining traffic (614E11000) | LS | 1 | $70,000 | $80,537 | $35,000 | $115,000 | $100,000 |
| 119 | Field office, type B (619E16010) | MNTH | 10 | $2,750.00 | $1,328.40 | $1,900.00 | $4,760.00 | $3,000.00 |
| 120 | Construction layout stakes and surveying (623E10000) | LS | 1 | $35,000 | $64,333 | $80,000 | $46,400 | $75,000 |
| 121 | Mobilization (624E10000) | LS | 1 | $170,000 | $94,762 | $50,000 | $200,000 | $200,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 26, 2026. Compiled by Mirage Metrics.