ODOT contract 250439 bid tabulation
MIA-SR 41-11.32 (INTERSECTION). Let by Ohio DOT on September 25, 2025, MIA. 6 bids received; low bid $3,326,915 by R B Jergens Contractors Inc, -4.6% against the engineer's estimate of $3,489,000.
- Owner
- Ohio DOT
- Letting
- 25 SEP 2025
- Pay items
- 169
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | R B Jergens Contractors Inc | $3,326,915 | Low | -5.0% |
| 2 | Performance Site Development | $3,483,569 | +5.0% | 0.0% |
| 3 | Eagle Bridge Co | $3,783,788 | +14% | +8.0% |
| 4 | Complete General Construction Company | $3,905,909 | +17% | +12% |
| 5 | John R Jurgensen Company | $3,962,726 | +19% | +14% |
| 6 | Brumbaugh Construction Inc | $4,097,216 | +23% | +17% |
Engineer's estimate: $3,489,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R B Jergens Contractors Inc | 2. Performance Site Development | 3. Eagle Bridge Co | 4. Complete General Construction Company | 5. John R Jurgensen Company | 6. Brumbaugh Construction Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $28,578 | $49,750 | $40,000 | $5,000.00 | $11,896 | $20,000 |
| 2 | Structure removed, as per plan (202E11005) | EACH | 1 | $13,601 | $6,250.00 | $5,000.00 | $3,000.00 | $4,002.11 | $5,000.00 |
| 3 | Pavement removed (202E23000) | SY | 5,834 | $14.67 | $14.80 | $22.00 | $20.00 | $23.14 | $20.00 |
| 4 | Walk removed (202E30000) | SF | 220 | $4.97 | $15.00 | $6.00 | $7.00 | $16.41 | $10.00 |
| 5 | Curb removed (202E32000) | FT | 72 | $23.10 | $11.00 | $10.00 | $10.00 | $29.00 | $30.00 |
| 6 | Curb and gutter removed (202E32500) | FT | 60 | $11.04 | $12.00 | $10.00 | $11.00 | $34.16 | $47.00 |
| 7 | Pipe removed, 24" and under (202E35100) | FT | 99 | $24.38 | $28.50 | $20.00 | $75.00 | $146.84 | $75.00 |
| 8 | Guardrail removed (202E38000) | FT | 954 | $2.90 | $2.25 | $3.00 | $2.00 | $6.00 | $7.00 |
| 9 | Fence removed (202E75000) | FT | 533 | $5.18 | $3.20 | $6.00 | $3.00 | $7.00 | $8.00 |
| 10 | Removal misc.:utility pull box removed and capped (202E98100) | EACH | 1 | $115.98 | $550.00 | $250.00 | $245.00 | $500.00 | $500.00 |
| 11 | Excavation (203E10000) | CY | 4,963 | $17.37 | $27.65 | $30.00 | $40.00 | $25.01 | $30.00 |
| 12 | Embankment (203E20000) | CY | 4,117 | $7.21 | $10.25 | $17.00 | $15.00 | $15.13 | $25.00 |
| 13 | Subgrade compaction (204E10000) | SY | 9,016 | $3.97 | $1.00 | $3.00 | $3.00 | $2.09 | $2.00 |
| 14 | Excavation of subgrade (204E13000) | CY | 730 | $40.26 | $32.50 | $25.00 | $48.00 | $51.24 | $32.00 |
| 15 | Granular material, type C (204E30020) | CY | 730 | $62.63 | $68.00 | $80.00 | $65.00 | $125.62 | $60.00 |
| 16 | Proof rolling (204E45000) | HR | 2 | $325.78 | $450.00 | $150.00 | $350.00 | $248.55 | $300.00 |
| 17 | Geotextile fabric (204E50000) | SY | 1,976 | $5.68 | $2.55 | $1.75 | $2.00 | $3.70 | $2.50 |
| 18 | Sealing of concrete surfaces, as per plan (512E10001) | SY | 1,002 | $12.95 | $14.00 | $12.50 | $12.50 | $12.50 | $5.50 |
| 19 | Guardrail, type MGS with long posts (606E15100) | FT | 1,387.50 | $22.28 | $21.45 | $21.00 | $20.40 | $21.00 | $23.00 |
| 20 | Anchor assembly, MGS type B (606E26050) | EACH | 1 | $2,590.97 | $2,710.00 | $2,700.00 | $2,580.00 | $2,700.00 | $3,000.00 |
| 21 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,243.67 | $1,429.00 | $1,250.00 | $1,360.00 | $1,250.00 | $1,400.00 |
| 22 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 1 | $2,590.97 | $2,782.55 | $2,400.00 | $2,650.00 | $2,400.00 | $2,700.00 |
| 23 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 1 | $518.19 | $610.00 | $425.00 | $2,280.00 | $425.00 | $470.00 |
| 24 | Fence, type CLT (607E23000) | FT | 527 | $31.09 | $34.70 | $21.00 | $37.00 | $21.00 | $23.00 |
| 25 | 4" concrete walk (608E10000) | SF | 3,302 | $8.49 | $8.75 | $9.25 | $14.00 | $10.03 | $11.00 |
| 26 | 5" concrete walk, as per plan (608E12001) | SF | 5,238 | $8.82 | $9.55 | $11.00 | $12.00 | $11.40 | $13.00 |
| 27 | Curb ramp (608E52000) | SF | 588 | $27.83 | $22.00 | $21.00 | $25.00 | $32.26 | $22.00 |
| 28 | Detectable warning (608E53020) | SF | 36 | $165.77 | $45.00 | $50.00 | $40.00 | $50.00 | $58.00 |
| 29 | Concrete barrier, single slope, type D (622E10160) | FT | 150 | $402.01 | $217.00 | $225.00 | $150.00 | $225.00 | $250.00 |
| 30 | Concrete barrier end section, type D (622E25000) | EACH | 2 | $6,044.52 | $4,250.00 | $6,000.00 | $4,800.00 | $6,373.85 | $5,000.00 |
| 31 | Right-of-way monument, type B (623E40520) | EACH | 4 | $1,174.57 | $1,577.00 | $650.00 | $410.00 | $939.67 | $500.00 |
| 32 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 5 | $221.14 | $175.00 | $250.00 | $200.00 | $311.00 | $175.00 |
| 33 | Soil analysis test (659E00100) | EACH | 2 | $77.73 | $79.00 | $200.00 | $135.00 | $60.00 | $135.00 |
| 34 | Topsoil (659E00300) | CY | 1,100 | $64.26 | $65.20 | $30.00 | $80.00 | $30.15 | $80.00 |
| 35 | Seeding and mulching (659E10000) | SY | 6,806 | $1.35 | $1.40 | $2.50 | $1.34 | $1.60 | $2.00 |
| 36 | Repair seeding and mulching (659E14000) | SY | 341 | $1.35 | $1.40 | $3.00 | $1.34 | $1.60 | $1.50 |
| 37 | Inter-seeding (659E15000) | SY | 341 | $1.35 | $1.40 | $3.00 | $1.00 | $1.00 | $1.00 |
| 38 | Commercial fertilizer (659E20000) | TON | 0.95 | $787.65 | $800.00 | $2,000.00 | $900.00 | $850.00 | $900.00 |
| 39 | Lime (659E31000) | ACRE | 1.41 | $51.82 | $52.75 | $10.00 | $75.00 | $35.00 | $75.00 |
| 40 | Water (659E35000) | MGAL | 39 | $31.09 | $31.75 | $20.00 | $1.00 | $1.00 | $1.00 |
| 41 | Ditch erosion protection (670E00700) | SY | 2,795 | $4.15 | $4.25 | $2.50 | $3.10 | $1.80 | $4.00 |
| 42 | Ditch erosion protection mat, type B (670E00720) | SY | 289 | $4.15 | $4.25 | $3.50 | $4.80 | $1.80 | $4.00 |
| 43 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,590.97 | $4,150.00 | $3,500.00 | $2,500.00 | $2,345.00 | $3,000.00 |
| 44 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $3,109.16 | $7,850.00 | $22,000 | $9,000.00 | $5,820.00 | $10,000 |
| 45 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $8,291.11 | $9,150.00 | $10,000 | $8,000.00 | $6,783.12 | $8,000.00 |
| 46 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 47 | Concrete masonry (602E20000) | CY | 0.80 | $4,653.04 | $2,765.00 | $4,000.00 | $5,000.00 | $4,433.80 | $6,500.00 |
| 48 | 6" shallow pipe underdrains (605E11100) | FT | 4,322 | $10.89 | $21.00 | $14.00 | $16.00 | $22.90 | $18.00 |
| 49 | 6" unclassified pipe underdrains (605E13300) | FT | 200 | $16.58 | $23.00 | $16.00 | $27.00 | $58.50 | $26.00 |
| 50 | 6" base pipe underdrains (605E14000) | FT | 1,699 | $16.58 | $21.00 | $16.00 | $20.00 | $31.02 | $20.00 |
| 51 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 100 | $31.33 | $26.00 | $25.00 | $43.00 | $59.38 | $36.00 |
| 52 | 6" conduit, type B (611E00900) | FT | 100 | $40.19 | $32.00 | $7.00 | $43.00 | $70.42 | $36.00 |
| 53 | 6" conduit, type F (611E01500) | FT | 200 | $40.13 | $32.00 | $5.00 | $43.00 | $65.62 | $36.00 |
| 54 | 12" conduit, type B (611E04400) | FT | 436 | $68.66 | $91.00 | $110.00 | $145.00 | $152.64 | $118.00 |
| 55 | 12" conduit, type C (611E04600) | FT | 100 | $89.17 | $88.00 | $105.00 | $142.00 | $135.80 | $60.00 |
| 56 | 18" conduit, type B (611E07400) | FT | 89 | $135.87 | $139.75 | $175.00 | $205.00 | $216.07 | $150.00 |
| 57 | 18" conduit, type C (611E07600) | FT | 12 | $247.72 | $160.00 | $300.00 | $340.00 | $2,031.89 | $240.00 |
| 58 | Catch basin, no. 3 (611E98150) | EACH | 2 | $3,781.66 | $4,035.00 | $4,500.00 | $6,000.00 | $3,704.50 | $4,100.00 |
| 59 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $2,301.79 | $1,500.00 | $2,500.00 | $3,000.00 | $1,599.86 | $2,200.00 |
| 60 | Manhole, no. 3 (611E99574) | EACH | 2 | $4,125.27 | $3,850.00 | $6,500.00 | $6,000.00 | $8,444.23 | $7,000.00 |
| 61 | Precast reinforced concrete outlet (611E99710) | EACH | 7 | $472.67 | $500.00 | $425.00 | $515.00 | $721.05 | $522.00 |
| 62 | Drainage structure, misc.: fernco coupler with she (611E99900) | EACH | 2 | $1,247.04 | $1,275.00 | $800.00 | $1,160.00 | $1,227.72 | $800.00 |
| 63 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 164 | $459.93 | $352.50 | $300.00 | $410.00 | $410.00 | $330.00 |
| 64 | Aggregate base (304E20000) | CY | 1,507 | $72.96 | $73.35 | $85.00 | $100.00 | $92.27 | $60.00 |
| 65 | Non-tracking tack coat (407E20000) | GAL | 109 | $5.61 | $8.50 | $1.00 | $5.00 | $5.00 | $1.00 |
| 66 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 44 | $684.28 | $469.30 | $400.00 | $610.00 | $610.00 | $445.00 |
| 67 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 50 | $600.15 | $411.50 | $350.00 | $535.00 | $535.00 | $388.00 |
| 68 | 13" non-reinforced concrete pavement, class QC 1P with QC/QA (452E16020) | SY | 7,034 | $125.09 | $123.00 | $165.00 | $166.00 | $178.63 | $175.00 |
| 69 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 822 | $52.94 | $38.50 | $46.00 | $43.00 | $49.54 | $51.00 |
| 70 | Curb, type 6 (609E26000) | FT | 74 | $36.56 | $61.00 | $42.00 | $54.00 | $48.58 | $52.00 |
| 71 | Connection, unfused permanent (625E00480) | EACH | 6 | $322.10 | $337.00 | $143.50 | $120.00 | $143.50 | $159.00 |
| 72 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 2,613 | $1.67 | $1.75 | $3.80 | $3.50 | $3.80 | $4.00 |
| 73 | Conduit, 2", 725.04 (625E25400) | FT | 785 | $13.09 | $13.66 | $14.65 | $33.00 | $14.65 | $16.00 |
| 74 | Conduit, 3", 725.04 (625E25500) | FT | 66 | $28.88 | $30.15 | $31.35 | $45.00 | $31.35 | $35.00 |
| 75 | Trench (625E29000) | FT | 851 | $22.65 | $23.65 | $11.90 | $10.00 | $11.90 | $13.00 |
| 76 | Pull box, 725.08, 24" (625E30706) | EACH | 3 | $844.49 | $881.00 | $1,290.00 | $1,500.00 | $1,290.00 | $1,425.00 |
| 77 | Pull box removed and replaced (625E31506) | EACH | 1 | $503.27 | $526.00 | $530.00 | $1,800.00 | $530.00 | $580.00 |
| 78 | Pull box removed (625E31510) | EACH | 3 | $352.29 | $367.55 | $221.00 | $250.00 | $221.00 | $245.00 |
| 79 | RPM (621E00100) | EACH | 143 | $57.00 | $57.76 | $55.00 | $55.00 | $55.00 | $60.00 |
| 80 | Raised pavement marker removed (621E54000) | EACH | 143 | $12.65 | $15.76 | $15.00 | $22.00 | $17.93 | $22.00 |
| 81 | Ground rod (625E32000) | EACH | 1 | $125.82 | $131.26 | $255.00 | $325.00 | $255.00 | $285.00 |
| 82 | Ground mounted support, no. 3 post (630E03100) | FT | 182 | $16.24 | $16.81 | $16.00 | $16.00 | $16.00 | $18.00 |
| 83 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 28 | $29.54 | $47.26 | $39.25 | $45.00 | $39.25 | $44.00 |
| 84 | One way support, no. 3 post (630E08004) | FT | 112 | $16.24 | $17.34 | $18.00 | $16.50 | $18.00 | $20.00 |
| 85 | Breakaway structural beam connection (630E09000) | EACH | 2 | $364.81 | $666.76 | $390.00 | $635.00 | $390.00 | $430.00 |
| 86 | Overhead sign support, type TC-12.31, design 12 (630E72340) | EACH | 1 | $36,274 | $50,243 | $40,000 | $47,850 | $40,000 | $40,000 |
| 87 | Sign hanger assembly, mast arm (630E79100) | EACH | 10 | $441.36 | $414.80 | $355.00 | $395.00 | $355.00 | $390.00 |
| 88 | Sign, flat sheet (630E80100) | SF | 334 | $18.72 | $17.35 | $20.25 | $16.50 | $20.25 | $22.00 |
| 89 | Sign, ground mounted extrusheet (630E80200) | SF | 30 | $25.91 | $25.00 | $48.00 | $23.80 | $48.00 | $53.00 |
| 90 | Sign, overhead extrusheet (630E80224) | SF | 160 | $27.98 | $24.70 | $51.00 | $23.50 | $51.00 | $55.00 |
| 91 | Ground mounted structural beam support foundation (630E84500) | EACH | 2 | $518.19 | $1,023.80 | $1,200.00 | $975.00 | $1,200.00 | $1,300.00 |
| 92 | Rigid overhead sign support foundation (630E84510) | EACH | 1 | $12,437 | $8,846.30 | $7,890.00 | $8,425.00 | $7,890.00 | $8,700.00 |
| 93 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $22.67 | $26.30 | $15.00 | $25.00 | $15.00 | $16.00 |
| 94 | Removal of ground mounted post support and disposal (630E86002) | EACH | 23 | $30.23 | $21.25 | $25.00 | $20.00 | $25.00 | $27.00 |
| 95 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 1 | $778.33 | $400.00 | $175.00 | $380.00 | $175.00 | $190.00 |
| 96 | Removal of pole mounted sign and reerection (630E87520) | EACH | 25 | $147.13 | $204.80 | $110.00 | $195.00 | $110.00 | $120.00 |
| 97 | Removal of overhead sign support and disposal, type TC-12.30 (630E89706) | EACH | 3 | $3,109.16 | $1,968.80 | $1,400.00 | $1,875.00 | $1,400.00 | $1,550.00 |
| 98 | Pavement marking, misc.: black contrast (642E50000) | MI | 1.11 | $1,969.14 | $1,996.00 | $1,900.00 | $1,900.00 | $1,900.00 | $2,100.00 |
| 99 | Edge line, 6" (644E00104) | MI | 1.20 | $3,316.44 | $3,361.00 | $3,200.00 | $3,200.00 | $3,200.00 | $3,500.00 |
| 100 | Lane line, 6" (644E00204) | MI | 1.11 | $2,072.78 | $2,105.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,200.00 |
| 101 | Center line (644E00300) | MI | 0.08 | $4,249.25 | $4,310.00 | $4,100.00 | $4,100.00 | $4,100.00 | $4,500.00 |
| 102 | Channelizing line, 8" (644E00400) | FT | 963 | $1.81 | $1.90 | $1.75 | $1.75 | $1.75 | $2.00 |
| 103 | Stop line (644E00500) | FT | 44 | $7.25 | $7.40 | $7.00 | $7.00 | $7.00 | $8.00 |
| 104 | Crosswalk line, 12" (644E00620) | FT | 550 | $4.15 | $4.25 | $4.00 | $4.00 | $4.00 | $4.00 |
| 105 | Lane arrow (644E01300) | EACH | 15 | $98.46 | $99.80 | $95.00 | $95.00 | $95.00 | $105.00 |
| 106 | Removal of pavement marking (644E30000) | FT | 765 | $2.07 | $2.15 | $2.00 | $2.00 | $2.00 | $2.00 |
| 107 | Removal of pavement marking (644E30020) | EACH | 1 | $103.64 | $106.00 | $100.00 | $100.00 | $100.00 | $111.00 |
| 108 | Edge line, 6" (646E10010) | MI | 0.55 | $6,529.25 | $6,616.00 | $6,300.00 | $6,300.00 | $6,300.00 | $7,000.00 |
| 109 | Channelizing line, 12" (646E10310) | FT | 1,026 | $5.70 | $5.80 | $5.50 | $5.50 | $5.50 | $6.00 |
| 110 | Stop line (646E10400) | FT | 49 | $20.73 | $21.25 | $20.00 | $20.00 | $20.00 | $22.00 |
| 111 | Chevron marking (646E10620) | FT | 110 | $18.65 | $18.95 | $18.00 | $18.00 | $18.00 | $20.00 |
| 112 | Lane arrow (646E20300) | EACH | 12 | $124.37 | $127.00 | $120.00 | $120.00 | $120.00 | $130.00 |
| 113 | Wrong way arrow (646E20320) | EACH | 3 | $207.28 | $215.00 | $200.00 | $200.00 | $200.00 | $220.00 |
| 114 | Dotted line, 6" (646E20504) | FT | 794 | $1.55 | $1.60 | $1.50 | $1.50 | $1.50 | $1.50 |
| 115 | Conduit, 2", 725.051 (625E25408) | FT | 320 | $1.31 | $1.40 | $6.10 | $12.00 | $6.10 | $7.00 |
| 116 | Conduit, 3", 725.051 (625E25504) | FT | 109 | $2.41 | $2.55 | $9.30 | $15.00 | $9.30 | $10.00 |
| 117 | Conduit, 4", 725.051 (625E25604) | FT | 70 | $3.32 | $3.50 | $9.15 | $21.00 | $9.15 | $10.00 |
| 118 | Conduit, jacked or drilled, 725.04 2" conduit (625E25902) | FT | 297 | $35.23 | $36.76 | $50.25 | $50.00 | $50.25 | $55.00 |
| 119 | Conduit, jacked or drilled, 725.051, 4" conduit (625E25906) | FT | 602 | $55.36 | $57.76 | $47.50 | $55.00 | $47.50 | $52.00 |
| 120 | Trench (625E29000) | FT | 371 | $22.65 | $23.64 | $11.90 | $10.00 | $11.90 | $13.00 |
| 121 | Trench in paved area (625E29400) | FT | 36 | $32.21 | $33.61 | $50.00 | $48.00 | $50.00 | $55.00 |
| 122 | Pull box, 725.08, 18" (625E30700) | EACH | 10 | $646.20 | $674.11 | $1,080.00 | $1,325.00 | $1,080.00 | $1,200.00 |
| 123 | Pull box, 725.08, 24" (625E30706) | EACH | 2 | $844.49 | $881.00 | $1,240.00 | $1,550.00 | $1,240.00 | $1,350.00 |
| 124 | Pull box removed (625E31510) | EACH | 11 | $352.29 | $367.51 | $221.00 | $250.00 | $221.00 | $250.00 |
| 125 | Ground rod (625E32000) | EACH | 16 | $125.82 | $131.30 | $255.00 | $325.00 | $255.00 | $280.00 |
| 126 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 13 | $805.24 | $841.00 | $1,163.00 | $1,000.00 | $1,163.00 | $1,300.00 |
| 127 | Vehicular signal head, (LED), 4-section, 12" lens, 1-way, polycarbonate (632E05064) | EACH | 2 | $996.48 | $1,040.00 | $1,372.00 | $1,200.00 | $1,372.00 | $1,525.00 |
| 128 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 2 | $1,592.36 | $1,661.15 | $1,923.00 | $1,700.00 | $1,923.00 | $2,130.00 |
| 129 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 12 | $437.85 | $456.80 | $783.00 | $875.00 | $783.00 | $870.00 |
| 130 | Pedestrian pushbutton (632E26000) | EACH | 12 | $146.96 | $153.35 | $447.00 | $325.00 | $447.00 | $500.00 |
| 131 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 2,524 | $1.03 | $1.10 | $2.70 | $3.00 | $2.70 | $3.00 |
| 132 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 2,684 | $1.41 | $1.50 | $3.30 | $3.50 | $3.30 | $3.50 |
| 133 | Signal support foundation, as per plan (632E64011) | EACH | 6 | $6,794.20 | $7,088.00 | $7,890.00 | $12,000 | $7,890.00 | $8,800.00 |
| 134 | Pedestal foundation (632E64020) | EACH | 10 | $1,207.86 | $1,261.00 | $1,115.00 | $1,700.00 | $1,115.00 | $1,240.00 |
| 135 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 2,425 | $3.47 | $3.63 | $4.90 | $6.00 | $4.90 | $5.00 |
| 136 | Power service (632E70000) | EACH | 2 | $2,868.66 | $2,992.51 | $5,080.00 | $6,000.00 | $5,080.00 | $5,600.00 |
| 137 | Conduit riser, 2" diameter (632E70400) | EACH | 2 | $875.70 | $913.51 | $870.00 | $1,900.00 | $870.00 | $950.00 |
| 138 | Signal support, type TC-81.22, design 13 (632E72140) | EACH | 2 | $19,723 | $20,575 | $22,320 | $21,000 | $22,320 | $24,000 |
| 139 | Signal support, type TC-81.22, design 14 (632E72150) | EACH | 2 | $22,030 | $22,981 | $24,245 | $22,500 | $24,245 | $26,000 |
| 140 | Combination signal support, misc.: TC-12.31 design (632E81700) | EACH | 2 | $61,903 | $64,576 | $43,510 | $43,000 | $43,510 | $48,000 |
| 141 | Pedestal, 11', transformer base (632E90000) | EACH | 10 | $1,065.93 | $1,112.00 | $1,025.00 | $1,600.00 | $1,025.00 | $1,150.00 |
| 142 | Removal of traffic signal installation (632E90100) | EACH | 2 | $6,039.29 | $6,315.00 | $6,100.00 | $3,800.00 | $6,100.00 | $6,750.00 |
| 143 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 2 | $19,952 | $20,815 | $19,405 | $18,000 | $19,405 | $21,500 |
| 144 | Cabinet foundation (633E67100) | EACH | 2 | $2,768.01 | $2,888.00 | $1,600.00 | $4,000.00 | $1,600.00 | $1,750.00 |
| 145 | Controller work pad (633E67200) | EACH | 2 | $1,006.55 | $1,051.00 | $1,115.00 | $2,000.00 | $1,115.00 | $1,250.00 |
| 146 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 2 | $5,678.94 | $5,924.20 | $5,680.00 | $5,000.00 | $5,680.00 | $6,300.00 |
| 147 | Controller item, misc.: reuse of spread spectrum R (633E99000) | EACH | 1 | $2,269.77 | $2,367.80 | $3,880.00 | $2,850.00 | $3,880.00 | $4,300.00 |
| 148 | CCTV IP-camera system, quad multi-view fixed with PTZ (809E60040) | EACH | 2 | $10,635 | $11,095 | $11,540 | $11,100 | $11,540 | $12,800 |
| 149 | Advance radar detection, as per plan (809E69001) | EACH | 6 | $10,065 | $10,501 | $9,200.00 | $8,500.00 | $9,200.00 | $10,200 |
| 150 | Stop line radar detection, as per plan (809E69101) | EACH | 7 | $10,065 | $10,501 | $8,870.00 | $8,100.00 | $8,870.00 | $9,800.00 |
| 151 | Atc controller, as per plan (809E69123) | EACH | 2 | $6,450.97 | $6,730.00 | $6,340.00 | $5,000.00 | $6,340.00 | $7,000.00 |
| 152 | Removal of existing pavement marking (512E74500) | FT | 130 | $10.36 | $15.00 | $10.00 | $10.00 | $10.00 | $11.00 |
| 153 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $126.75 | $88.00 | $105.00 | $130.00 | $140.43 | $130.00 |
| 154 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 1 | $2,090.83 | $3,625.00 | $2,050.00 | $6,000.00 | $3,631.88 | $2,250.00 |
| 155 | Work zone raised pavement marker (614E12800) | EACH | 72 | $12.52 | $12.70 | $12.25 | $55.00 | $47.69 | $13.50 |
| 156 | Portable changeable message sign, as per plan (614E18601) | SNMT | 3 | $982.24 | $996.00 | $1,000.00 | $1,700.00 | $1,150.00 | $1,050.00 |
| 157 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 1.10 | $373.10 | $1,429.00 | $1,360.00 | $1,360.00 | $1,360.00 | $1,500.00 |
| 158 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 0.38 | $1,026.03 | $1,040.00 | $990.00 | $990.00 | $990.00 | $1,100.00 |
| 159 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 1.09 | $1,409.49 | $1,429.00 | $1,360.00 | $1,360.00 | $1,360.00 | $1,500.00 |
| 160 | Water (616E10000) | MGAL | 10 | $141.92 | $80.00 | $25.00 | $200.00 | $177.55 | $5.00 |
| 161 | Portable barrier, 50", as per plan (622E41011) | FT | 1,755 | $50.13 | $51.20 | $30.00 | $35.00 | $56.05 | $54.00 |
| 162 | Barrier reflector, type 1 (one way) (626E00102) | EACH | 42 | $12.06 | $14.00 | $15.00 | $26.00 | $35.31 | $13.00 |
| 163 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $12,812 | $75,555 | $50,000 | $22,060 | $19,176 | $70,000 |
| 164 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $5,281.08 | $40,450 | $12,500 | $16,000 | $6,990.51 | $17,000 |
| 165 | Maintaining traffic (614E11000) | LS | 1 | $138,717 | $125,900 | $130,000 | $50,000 | $45,061 | $160,000 |
| 166 | Field office, type B (619E16010) | MNTH | 12 | $2,640.54 | $4,250.00 | $2,750.00 | $2,000.00 | $2,263.51 | $2,900.00 |
| 167 | Construction layout stakes and surveying (623E10000) | LS | 1 | $44,634 | $88,950 | $55,000 | $34,000 | $13,373 | $52,000 |
| 168 | Mobilization (624E10000) | LS | 1 | $100,000 | $47,500 | $187,500 | $195,000 | $187,500 | $194,682 |
| 200 | 15" conduit, type B (611E05900) | FT | 44 | $92.75 | $122.00 | $120.00 | $195.00 | $196.72 | $102.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 25, 2025. Compiled by Mirage Metrics.