ODOT contract 250455 bid tabulation
AUG-SR 219-09.27 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on October 9, 2025, AUG. 5 bids received; low bid $949,688 by Jutte Excavating Inc, -25% against the engineer's estimate of $1,260,000.
- Owner
- Ohio DOT
- Letting
- 09 OCT 2025
- Pay items
- 65
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jutte Excavating Inc | $949,688 | Low | -25% |
| 2 | Miller Bros Const Inc | $952,134 | 0.0% | -24% |
| 3 | Brumbaugh Construction Inc | $1,000,000 | +5.0% | -21% |
| 4 | Eagle Bridge Co | $1,020,596 | +7.0% | -19% |
| 5 | Complete General Construction Company | $1,259,722 | +33% | 0.0% |
Engineer's estimate: $1,260,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jutte Excavating Inc | 2. Miller Bros Const Inc | 3. Brumbaugh Construction Inc | 4. Eagle Bridge Co | 5. Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $1.00 | $1,126.35 | $2,000.00 | $250.00 | $5,000.00 |
| 2 | Pavement removed (202E23000) | SY | 71 | $4.60 | $35.17 | $13.00 | $35.00 | $95.00 |
| 3 | Wearing course removed (202E23500) | SY | 727 | $4.60 | $10.10 | $6.00 | $20.00 | $30.00 |
| 4 | Guardrail removed, as per plan (202E38001) | FT | 600 | $2.40 | $4.00 | $6.00 | $4.00 | $2.40 |
| 5 | Removal misc.: removal of bridge ID sign and reere (202E98100) | EACH | 1 | $165.00 | $20.00 | $125.00 | $25.00 | $165.00 |
| 6 | Excavation (203E10000) | CY | 24 | $6.00 | $47.85 | $20.00 | $20.00 | $75.00 |
| 7 | Borrow (203E40000) | CY | 12 | $30.00 | $71.06 | $20.00 | $50.00 | $90.00 |
| 8 | Subgrade compaction (204E10000) | SY | 227 | $4.00 | $5.92 | $1.20 | $10.00 | $25.00 |
| 9 | Linear grading (209E60200) | STA | 6 | $100.00 | $108.15 | $450.00 | $50.00 | $55.00 |
| 10 | Guardrail, type MGS (606E15050) | FT | 225 | $20.80 | $21.00 | $22.00 | $21.00 | $20.80 |
| 11 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 4 | $2,425.00 | $2,850.00 | $2,900.00 | $2,850.00 | $2,425.00 |
| 12 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $2,360.00 | $2,675.00 | $2,800.00 | $2,675.00 | $2,360.00 |
| 13 | Seeding and mulching (659E10000) | SY | 1,400 | $3.95 | $2.40 | $3.00 | $3.00 | $2.80 |
| 14 | Repair seeding and mulching (659E14000) | SY | 70 | $1.90 | $2.40 | $1.00 | $1.50 | $8.00 |
| 15 | Commercial fertilizer (659E20000) | TON | 0.19 | $600.00 | $850.00 | $900.00 | $1,000.00 | $800.00 |
| 16 | Water (659E35000) | MGAL | 8 | $1.00 | $1.00 | $5.00 | $10.00 | $10.00 |
| 17 | Erosion control (832E30000) | EACH | 8,900 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 18 | Aggregate drains (605E31100) | FT | 32 | $25.00 | $21.02 | $20.00 | $20.00 | $40.00 |
| 19 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 16 | $630.00 | $515.00 | $650.00 | $515.00 | $515.00 |
| 20 | Aggregate base (304E20000) | CY | 39 | $75.00 | $100.17 | $65.00 | $135.00 | $250.00 |
| 21 | Tack coat (407E10000) | GAL | 34 | $35.00 | $1.00 | $10.00 | $1.00 | $1.00 |
| 22 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 17 | $670.00 | $610.00 | $690.00 | $610.00 | $610.00 |
| 23 | Raised pavement marker removed (621E54000) | EACH | 4 | $5.00 | $20.72 | $50.00 | $25.00 | $75.00 |
| 24 | Barrier reflector, type 2, (bidirectional) (626E00110) | EACH | 8 | $12.00 | $13.00 | $15.00 | $13.00 | $12.00 |
| 25 | Ground mounted support, no. 2 post (630E02100) | FT | 10 | $50.00 | $18.00 | $12.00 | $18.00 | $50.00 |
| 26 | Sign, flat sheet, as per plan (630E80101) | SF | 1 | $65.00 | $20.00 | $125.00 | $20.00 | $65.00 |
| 27 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $60.00 | $55.00 | $100.00 | $55.00 | $60.00 |
| 28 | Removal of ground mounted post support and disposal (630E86002) | EACH | 2 | $15.00 | $30.00 | $50.00 | $30.00 | $15.00 |
| 29 | Edge line, 6" (646E10010) | MI | 0.10 | $22,695 | $38,570 | $25,000 | $22,695 | $38,570 |
| 30 | Center line (646E10200) | MI | 0.05 | $24,805 | $37,400 | $25,000 | $24,805 | $37,400 |
| 31 | Detour signing (614E12420) | LS | 1 | $7,143.21 | $5,945.00 | $7,500.00 | $7,500.00 | $6,000.00 |
| 32 | Structure removed, over 20 foot span (202E11002) | LS | 1 | $25,375 | $40,728 | $75,000 | $45,000 | $70,000 |
| 33 | Approach slab removed (202E22900) | SY | 112 | $90.00 | $52.27 | $70.00 | $45.00 | $60.00 |
| 34 | Bridge railing removed (202E38500) | FT | 187.50 | $5.00 | $4.00 | $12.00 | $15.00 | $4.00 |
| 35 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $1.00 | $1.00 | $15,000 | $37,500 | $50,000 |
| 36 | Unclassified excavation (503E21300) | LS | 1 | $10,000 | $15,429 | $7,500.00 | $25,000 | $45,000 |
| 37 | Pile driving equipment mobilization (505E11100) | LS | 1 | $90,750 | $20,520 | $20,000 | $25,000 | $35,000 |
| 38 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 560 | $2.00 | $27.37 | $5.00 | $5.00 | $50.00 |
| 39 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 640 | $27.25 | $44.39 | $52.00 | $65.00 | $35.00 |
| 40 | 16" cast-in-place reinforced concrete piles, driven (507E00700) | FT | 600 | $2.00 | $25.55 | $6.00 | $6.00 | $40.00 |
| 41 | 16" cast-in-place reinforced concrete piles, furnished, as per plan (507E00751) | FT | 660 | $35.00 | $66.41 | $82.00 | $85.00 | $45.00 |
| 42 | Epoxy coated steel reinforcement (509E10000) | LB | 33,678 | $1.00 | $1.37 | $1.15 | $1.60 | $1.75 |
| 43 | Galvanized steel reinforcement (509E26000) | LB | 43,436 | $1.40 | $1.75 | $1.65 | $1.90 | $1.75 |
| 44 | Class QC2 concrete with QC/QA, superstructure (511E32212) | CY | 197 | $1,219.50 | $1,235.05 | $1,400.00 | $1,375.00 | $1,450.00 |
| 45 | Class QC1 concrete, abutment including footing (511E43510) | CY | 64 | $877.30 | $792.29 | $850.00 | $700.00 | $1,600.00 |
| 46 | 1/2" preformed expansion joint filler (516E13200) | SF | 60 | $3.00 | $6.06 | $3.00 | $6.00 | $20.00 |
| 47 | 1" preformed expansion joint filler (516E13600) | SF | 85 | $3.00 | $6.51 | $5.00 | $7.00 | $15.00 |
| 48 | Integral abutment expansion joint seal (516E14014) | FT | 75 | $15.00 | $36.02 | $25.00 | $45.00 | $46.50 |
| 49 | 2" deep joint sealer, as per plan (516E31011) | FT | 75 | $35.00 | $4.89 | $10.00 | $22.00 | $35.00 |
| 50 | Railing (three steel tube bridge railing) (517E70100) | FT | 186 | $484.00 | $459.50 | $475.00 | $459.50 | $500.00 |
| 51 | Porous backfill with geotextile fabric (518E21200) | CY | 52 | $54.00 | $134.87 | $60.00 | $115.00 | $195.00 |
| 52 | Special - steel drip strip (518E22300) | FT | 209 | $12.00 | $17.48 | $14.00 | $19.00 | $16.25 |
| 53 | 6" perforated corrugated plastic pipe (518E40000) | FT | 110 | $10.00 | $10.58 | $10.00 | $12.00 | $15.00 |
| 54 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 60 | $10.00 | $20.24 | $10.00 | $18.00 | $20.00 |
| 55 | Dynamic load testing (523E20000) | EACH | 2 | $3,500.00 | $5,080.64 | $3,800.00 | $5,000.00 | $12,000 |
| 56 | Reinforced concrete approach slabs with QC/QA (T=1 (526E15011) | SY | 160 | $127.50 | $188.80 | $250.00 | $200.00 | $250.00 |
| 57 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 8 | $60.00 | $164.90 | $150.00 | $135.00 | $150.00 |
| 58 | Rock channel protection, type C with filter (601E32200) | CY | 170 | $60.00 | $109.65 | $95.00 | $70.00 | $95.00 |
| 59 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $250.00 | $441.86 | $225.00 | $325.00 | $600.00 |
| 60 | Structure grounding system (625E33000) | EACH | 1 | $900.00 | $15,250 | $12,000 | $4,000.00 | $10,000 |
| 61 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,500.00 | $4,638.79 | $25,000 | $15,000 | $8,000.00 |
| 62 | Maintaining traffic (614E11000) | LS | 1 | $30,000 | $1,648.92 | $1,000.00 | $2,500.00 | $5,000.00 |
| 63 | Field office, type B (619E16010) | MNTH | 3 | $3,000.00 | $4,118.09 | $1,000.00 | $1,750.00 | $2,500.00 |
| 64 | Construction layout stakes and surveying (623E10000) | LS | 1 | $28,000 | $11,500 | $10,000 | $6,500.00 | $7,000.00 |
| 65 | Mobilization (624E10000) | LS | 1 | $79,500 | $47,607 | $28,342 | $31,000 | $62,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way