ODOT contract 260210 bid tabulation
MOT-Old N. Dayton Trail, Seg 2 (BIKEWAYS). Let by Ohio DOT on April 23, 2026, MOT. 5 bids received; low bid $1,083,094 by Brumbaugh Construction Inc, +10% against the engineer's estimate of $982,000.
- Owner
- Ohio DOT
- Letting
- 23 APR 2026
- Pay items
- 36
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Brumbaugh Construction Inc | $1,083,094 | Low | +10% |
| 2 | Fillmore Construction | $1,097,584 | +1.0% | +12% |
| 3 | Performance Site Development | $1,210,108 | +12% | +23% |
| 4 | Sunesis Construction Co | $1,286,743 | +19% | +31% |
| 5 | Barrett Paving Materials Inc | $1,428,616 | +32% | +45% |
Engineer's estimate: $982,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Brumbaugh Construction Inc | 2. Fillmore Construction | 3. Performance Site Development | 4. Sunesis Construction Co | 5. Barrett Paving Materials Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $3,000.00 | $7,500.00 | $33,955 | $2,690.67 | $28,000 |
| 2 | Pavement removed (202E23000) | SY | 13 | $40.00 | $50.00 | $125.00 | $51.30 | $65.00 |
| 3 | Excavation (203E10000) | CY | 5,491 | $23.00 | $30.00 | $25.25 | $34.03 | $45.00 |
| 4 | Embankment (203E20000) | CY | 1,534 | $24.00 | $35.00 | $21.00 | $13.76 | $45.00 |
| 5 | Subgrade compaction (204E10000) | SY | 11,366 | $1.00 | $3.00 | $1.00 | $1.56 | $2.50 |
| 6 | Excavation of subgrade (204E13000) | CY | 940 | $23.00 | $30.00 | $26.25 | $37.24 | $55.00 |
| 7 | Granular material, type B (204E30010) | CY | 940 | $66.00 | $72.00 | $70.00 | $93.95 | $100.00 |
| 8 | Proof rolling, as per plan (204E45001) | HR | 5 | $325.00 | $150.00 | $195.00 | $227.30 | $275.00 |
| 9 | Geotextile fabric (204E50000) | SY | 2,820 | $2.50 | $2.00 | $5.00 | $1.11 | $3.50 |
| 10 | Fence, type CLT (607E23000) | FT | 61 | $70.00 | $65.00 | $47.25 | $65.00 | $65.00 |
| 11 | Fence, misc.: tubular barrier swing gate (607E98100) | EACH | 2 | $3,500.00 | $3,250.00 | $4,675.13 | $3,250.00 | $3,250.00 |
| 12 | Fence, misc.: overhead protective fencing (607E98200) | LS | 1 | $160,000 | $148,000 | $183,015 | $148,000 | $148,000 |
| 13 | 7" concrete walk (608E13020) | SF | 922 | $10.00 | $50.00 | $13.95 | $11.54 | $12.00 |
| 14 | Detectable warning (608E53020) | SF | 28 | $40.00 | $100.00 | $38.00 | $50.00 | $100.00 |
| 15 | Riprap (601E10000) | SY | 10 | $50.00 | $120.00 | $245.00 | $185.09 | $390.00 |
| 16 | Seeding and mulching, class 2, as per plan (659E00511) | SY | 10,005 | $3.00 | $2.00 | $1.50 | $15.12 | $1.50 |
| 17 | Slope erosion protection (670E00500) | SY | 3,556 | $3.50 | $2.25 | $4.21 | $2.25 | $3.50 |
| 18 | Erosion control (832E30000) | EACH | 20,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 19 | 18" conduit, type B (611E07400) | FT | 37 | $250.00 | $180.00 | $177.00 | $251.57 | $155.00 |
| 20 | Manhole adjusted to grade (611E99654) | EACH | 2 | $265.00 | $1,500.00 | $1,895.00 | $420.42 | $1,500.00 |
| 21 | Manhole reconstructed to grade (611E99660) | EACH | 4 | $2,200.00 | $2,500.00 | $2,950.00 | $319.57 | $2,500.00 |
| 22 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 587 | $255.00 | $210.00 | $316.00 | $300.00 | $260.00 |
| 23 | Aggregate base (304E20000) | CY | 2,546 | $73.00 | $80.00 | $72.00 | $85.68 | $100.00 |
| 24 | Non-tracking tack coat (407E20000) | GAL | 591 | $5.00 | $5.00 | $8.83 | $8.40 | $3.50 |
| 25 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 274 | $300.00 | $240.00 | $325.51 | $310.00 | $320.00 |
| 26 | Delineator, post surface mounted (620E60000) | EACH | 1 | $215.00 | $200.00 | $446.25 | $16.00 | $300.00 |
| 27 | Signing, misc.: CSXT no trespassing sign (630E97700) | EACH | 4 | $550.00 | $500.00 | $703.50 | $16.00 | $500.00 |
| 28 | Center line (644E00300) | MI | 0.02 | $84,000 | $77,250 | $81,113 | $77,250 | $80,000 |
| 29 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $6,000.00 | $2,500.00 | $6,550.00 | $4,000.00 | $20,000 |
| 30 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,500.00 | $7,500.00 | $19,995 | $7,565.19 | $22,000 |
| 31 | Maintaining traffic (614E11000) | LS | 1 | $5,000.00 | $3,500.00 | $27,775 | $4,185.93 | $14,000 |
| 32 | Construction layout stakes and surveying (623E10000) | LS | 1 | $18,500 | $7,500.00 | $24,750 | $19,600 | $36,000 |
| 33 | Mobilization (624E10000) | LS | 1 | $68,320 | $17,000 | $29,995 | $31,886 | $40,000 |
| 100 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,500.00 | $3,500.00 | $3,950.00 | $2,500.00 | $5,000.00 |
| 101 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $6,000.00 | $7,500.00 | $7,750.00 | $2,700.00 | $8,000.00 |
| 102 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $11,000 | $10,000 | $14,150 | $8,835.11 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.