ODOT contract 250565 bid tabulation
MER-SR 219-13.80 (BRIDGE REPAIR). Let by Ohio DOT on December 4, 2025, MER. 3 bids received; low bid $1,450,000 by Brumbaugh Construction Inc, -1.7% against the engineer's estimate of $1,475,000.
- Owner
- Ohio DOT
- Letting
- 04 DEC 2025
- Pay items
- 81
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Brumbaugh Construction Inc | $1,450,000 | Low | -2.0% |
| 2 | Eagle Bridge Co | $1,701,954 | +17% | +15% |
| 3 | Complete General Construction Company | $2,030,583 | +40% | +38% |
Engineer's estimate: $1,475,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Brumbaugh Construction Inc | 2. Eagle Bridge Co | 3. Complete General Construction Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $1,000.00 | $1,500.00 | $6,000.00 |
| 2 | Pavement removed (202E23000) | SY | 27 | $50.00 | $50.00 | $40.00 |
| 3 | Curb and gutter removed (202E32500) | FT | 62 | $10.00 | $12.00 | $15.00 |
| 4 | Guardrail removed (202E38000) | FT | 237.50 | $10.00 | $2.00 | $2.00 |
| 5 | Anchor assembly removed, type E (202E42010) | EACH | 1 | $600.00 | $150.00 | $350.00 |
| 6 | Anchor assembly removed, type B (202E42050) | EACH | 3 | $600.00 | $125.00 | $350.00 |
| 7 | Excavation (203E10000) | CY | 91 | $15.00 | $50.00 | $45.00 |
| 8 | Embankment (203E20000) | CY | 43 | $15.00 | $50.00 | $50.00 |
| 9 | Subgrade compaction (204E10000) | SY | 195 | $1.25 | $15.00 | $5.00 |
| 10 | Guardrail, type MGS, as per plan (606E15051) | FT | 106.25 | $45.00 | $29.00 | $64.00 |
| 11 | Anchor assembly, MGS type B (606E26050) | EACH | 1 | $2,700.00 | $2,450.00 | $2,580.00 |
| 12 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 3 | $2,900.00 | $2,675.00 | $2,880.00 |
| 13 | Bridge terminal assembly, type TST (606E32160) | EACH | 4 | $2,800.00 | $2,350.00 | $2,425.00 |
| 14 | Fence removed and rebuilt (607E35000) | FT | 12 | $80.00 | $150.00 | $265.00 |
| 15 | Curb, type 2-A (609E14000) | FT | 153 | $50.00 | $35.00 | $65.00 |
| 16 | Soil analysis test (659E00100) | EACH | 1 | $150.00 | $100.00 | $50.00 |
| 17 | Topsoil (659E00300) | CY | 111 | $60.00 | $50.00 | $45.00 |
| 18 | Seeding and mulching, class 1 (659E00500) | SY | 1,342 | $2.50 | $5.00 | $3.85 |
| 19 | Repair seeding and mulching (659E14000) | SY | 67 | $2.00 | $2.00 | $10.00 |
| 20 | Inter-seeding (659E15000) | SY | 67 | $2.00 | $2.00 | $5.00 |
| 21 | Commercial fertilizer (659E20000) | TON | 0.12 | $900.00 | $1,500.00 | $900.00 |
| 22 | Water (659E35000) | MGAL | 7 | $5.00 | $10.00 | $2.50 |
| 23 | Mowing (659E40000) | MSF | 3 | $400.00 | $50.00 | $100.00 |
| 24 | Erosion control (832E30000) | EACH | 9,400 | $1.00 | $1.00 | $1.00 |
| 25 | 6" conduit, type B (611E00900) | FT | 50 | $10.00 | $5.00 | $50.00 |
| 26 | 6" conduit, type C (611E01100) | FT | 100 | $10.00 | $4.00 | $50.00 |
| 27 | 6" conduit, type E (611E01400) | FT | 50 | $10.00 | $4.00 | $40.00 |
| 28 | 6" conduit, type F (611E01500) | FT | 50 | $10.00 | $4.00 | $45.00 |
| 29 | 8" conduit, type B (611E01800) | FT | 50 | $15.00 | $7.00 | $60.00 |
| 30 | Full depth pavement sawing (252E01500) | FT | 203 | $3.00 | $3.00 | $3.00 |
| 31 | Pavement planing, asphalt concrete, 3" (254E01000) | SY | 561 | $18.00 | $17.50 | $20.00 |
| 32 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 37 | $350.00 | $343.00 | $343.00 |
| 33 | Aggregate base (304E20000) | CY | 56 | $65.00 | $120.00 | $126.00 |
| 34 | Non-tracking tack coat (407E20000) | GAL | 114 | $5.00 | $5.50 | $5.50 |
| 35 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 27 | $360.00 | $352.00 | $352.00 |
| 36 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 37 | $300.00 | $290.00 | $290.00 |
| 37 | Barrier reflector, type 1, one-way (626E00102) | EACH | 13 | $10.00 | $13.00 | $15.00 |
| 38 | Ground mounted support, no. 2 post (630E02100) | FT | 37.50 | $4.00 | $15.00 | $20.00 |
| 39 | Sign, flat sheet (630E80100) | SF | 1 | $900.00 | $16.00 | $30.00 |
| 40 | Removal of ground mounted sign and reerection, as per plan (630E85101) | EACH | 2 | $150.00 | $45.00 | $90.00 |
| 41 | Removal of ground mounted post support and disposal (630E86002) | EACH | 2 | $25.00 | $25.00 | $90.00 |
| 42 | Edge line, 6" (644E00104) | MI | 0.06 | $15,000 | $60,835 | $60,835 |
| 43 | Center line (644E00300) | MI | 0.06 | $15,000 | $1,670.00 | $1,670.00 |
| 44 | Transverse/diagonal line (644E00700) | FT | 65 | $10.00 | $10.00 | $10.00 |
| 45 | Removal of pavement marking (644E30030) | MI | 0.20 | $1,800.00 | $12,500 | $12,500 |
| 46 | Edge line, 6", type A3 (645E00116) | MI | 0.04 | $35,000 | $168,750 | $168,750 |
| 47 | Center line, type A3 (645E00310) | MI | 0.04 | $35,000 | $2,500.00 | $2,500.00 |
| 48 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 24 | $100.00 | $75.00 | $95.00 |
| 49 | Detour signing (614E12420) | LS | 1 | $7,500.00 | $10,000 | $7,000.00 |
| 50 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $110,000 | $200,000 | $175,000 |
| 51 | Approach slab removed (202E22900) | SY | 133 | $50.00 | $50.00 | $55.00 |
| 52 | Bridge railing removed (202E38500) | FT | 182 | $10.00 | $15.00 | $15.00 |
| 53 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $115,000 | $200,000 | $375,000 |
| 54 | Unclassified excavation (503E21100) | CY | 93 | $60.00 | $150.00 | $150.00 |
| 55 | Steel piles HP12X53, furnished, as per plan (507E00201) | FT | 36 | $225.00 | $350.00 | $440.00 |
| 56 | Special - pile encasement (507E71200) | FT | 111 | $200.00 | $165.00 | $375.00 |
| 57 | Epoxy coated steel reinforcement (509E10000) | LB | 4,116 | $1.20 | $1.80 | $1.87 |
| 58 | Galvanized steel reinforcement (509E26000) | LB | 14,508 | $1.80 | $2.00 | $2.50 |
| 59 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 20 | $25.00 | $40.00 | $35.00 |
| 60 | Class QC2 concrete, superstructure (511E31610) | CY | 79 | $1,000.00 | $1,450.00 | $1,500.00 |
| 61 | Class QC1 concrete, pier cap (511E42510) | CY | 34 | $1,100.00 | $1,500.00 | $1,600.00 |
| 62 | Class QC1 concrete, abutment (511E45710) | CY | 2 | $1,500.00 | $2,500.00 | $2,400.00 |
| 63 | Prestressed concrete composite box beam bridge members, level 1, CB17-48 (515E12030) | EACH | 30 | $11,000 | $8,900.00 | $11,500 |
| 64 | 1" preformed expansion joint filler (516E13600) | SF | 22 | $6.00 | $9.00 | $18.00 |
| 65 | Semi-integral abutment expansion joint seal (516E14020) | FT | 90 | $50.00 | $40.00 | $55.00 |
| 66 | 2" deep joint sealer, as per plan (516E31011) | FT | 80 | $8.00 | $20.00 | $28.50 |
| 67 | 1/8" preformed bearing pad, type CDP (516E41100) | EACH | 60 | $40.00 | $20.00 | $100.00 |
| 68 | Elastomeric bearing with internal laminates only (neoprene) (516E43100) | EACH | 120 | $125.00 | $145.00 | $230.00 |
| 69 | Railing (three steel tube bridge railing) (517E70100) | FT | 194 | $500.00 | $429.75 | $455.00 |
| 70 | Porous backfill with geotextile fabric (518E21200) | CY | 24 | $80.00 | $135.00 | $135.00 |
| 71 | Special - steel drip strip (518E22300) | FT | 222 | $12.00 | $15.00 | $22.00 |
| 72 | 6" perforated corrugated plastic pipe (518E40000) | FT | 100 | $12.00 | $12.00 | $12.00 |
| 73 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 14 | $12.00 | $30.00 | $28.00 |
| 74 | Patching concrete structure, as per plan (519E11101) | SF | 260 | $100.00 | $135.00 | $200.00 |
| 75 | Galvanic anode protection, as per plan (844E20001) | EACH | 36 | $55.00 | $55.00 | $50.00 |
| 76 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $9,000.00 | $20,000 | $14,000 |
| 77 | Maintaining traffic (614E11000) | LS | 1 | $1,500.00 | $2,500.00 | $15,000 |
| 78 | Field office, type A, as per plan (619E16001) | MNTH | 8 | $900.00 | $2,000.00 | $2,400.00 |
| 79 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $6,500.00 | $20,000 |
| 80 | Mobilization (624E10000) | LS | 1 | $22,249 | $70,000 | $80,000 |
| 81 | Special - calendar days of contract time for opening to traffic (unit price field should reflect number of days bid) (614E15000) | DLR | 4,000 | $90.00 | $90.00 | $80.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 4, 2025. Compiled by Mirage Metrics.