ODOT contract 250413 bid tabulation
LAK-IR 90-11.51 Deck (BRIDGE REPAIR). Let by Ohio DOT on September 11, 2025, LAK. 3 bids received; low bid $2,492,194 by Perk Company Inc, +3.8% against the engineer's estimate of $2,400,000.
- Owner
- Ohio DOT
- Letting
- 11 SEP 2025
- Pay items
- 98
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Perk Company Inc | $2,492,194 | Low | +4.0% |
| 2 | Ruhlin Company | $2,582,537 | +4.0% | +8.0% |
| 3 | J D Williamson Construction Co Inc | $2,921,083 | +17% | +22% |
Engineer's estimate: $2,400,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Perk Company Inc | 2. Ruhlin Company | 3. J D Williamson Construction Co Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $4,000.00 | $15,000 | $12,500 |
| 2 | Pavement removed (202E23000) | SY | 726 | $27.25 | $35.00 | $14.00 |
| 3 | Guardrail removed (202E38000) | FT | 516 | $5.00 | $3.00 | $4.00 |
| 4 | Anchor assembly removed, type A (202E42000) | EACH | 2 | $365.00 | $250.00 | $300.00 |
| 5 | Fence removed (202E75000) | FT | 132 | $4.50 | $16.00 | $2.00 |
| 6 | Excavation (203E10000) | CY | 134 | $56.85 | $65.00 | $38.00 |
| 7 | Embankment (203E20000) | CY | 59 | $30.00 | $130.00 | $16.00 |
| 8 | Subgrade compaction (204E10000) | SY | 848 | $2.50 | $5.50 | $9.00 |
| 9 | Proof rolling (204E45000) | HR | 1 | $350.00 | $1,023.00 | $350.00 |
| 10 | Guardrail, type MGS (606E15050) | FT | 62.50 | $24.80 | $21.00 | $26.00 |
| 11 | Guardrail, type MGS with long posts (606E15100) | FT | 195 | $27.20 | $25.00 | $28.00 |
| 12 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 1 | $2,680.00 | $2,650.00 | $2,800.00 |
| 13 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,360.00 | $1,350.00 | $1,420.00 |
| 14 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 4 | $2,485.00 | $2,450.00 | $2,600.00 |
| 15 | Fence, type CLT (607E23000) | FT | 115 | $49.50 | $82.50 | $50.00 |
| 16 | Vandal protection fence, 6' straight, coated fabric, as per plan (607E39901) | FT | 840 | $110.00 | $135.50 | $105.00 |
| 17 | Structure grounding system, as per plan (625E33001) | EACH | 1 | $8,500.00 | $6,166.01 | $21,250 |
| 18 | Crushed aggregate slope protection, as per plan (601E20001) | SY | 100 | $65.50 | $60.00 | $40.00 |
| 19 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 6 | $200.00 | $430.00 | $320.00 |
| 20 | Soil analysis test (659E00100) | EACH | 2 | $500.00 | $200.00 | $160.00 |
| 21 | Topsoil (659E00300) | CY | 56 | $65.00 | $75.00 | $75.00 |
| 22 | Seeding and mulching, class 2 (659E00510) | SY | 505 | $2.70 | $1.70 | $3.50 |
| 23 | Repair seeding and mulching (659E14000) | SY | 25 | $2.00 | $1.40 | $1.00 |
| 24 | Inter-seeding (659E15000) | SY | 25 | $2.00 | $0.60 | $1.00 |
| 25 | Commercial fertilizer (659E20000) | TON | 0.08 | $1,000.00 | $775.00 | $450.00 |
| 26 | Lime (659E31000) | ACRE | 0.10 | $1,000.00 | $135.00 | $30.00 |
| 27 | Water (659E35000) | MGAL | 3 | $100.00 | $5.00 | $2.00 |
| 28 | Erosion control (832E30000) | EACH | 20,000 | $1.00 | $1.00 | $1.00 |
| 29 | Concrete masonry (602E20000) | CY | 0.21 | $4,420.00 | $4,500.00 | $4,600.00 |
| 30 | 4" unclassified pipe underdrains (605E05200) | FT | 20 | $58.65 | $20.00 | $5.00 |
| 31 | Aggregate drains (605E31100) | FT | 82 | $34.50 | $21.00 | $20.00 |
| 32 | 4" conduit, type F (611E00406) | FT | 20 | $44.15 | $33.00 | $20.00 |
| 33 | 12" conduit, type B (611E04400) | FT | 37 | $100.00 | $350.00 | $170.00 |
| 34 | Catch basin, no. 3A (611E98180) | EACH | 1 | $3,625.00 | $4,300.00 | $5,000.00 |
| 35 | Precast reinforced concrete outlet (611E99710) | EACH | 2 | $460.00 | $600.00 | $370.00 |
| 36 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 108 | $180.00 | $180.00 | $265.00 |
| 37 | Aggregate base (304E20000) | CY | 136 | $78.00 | $165.00 | $125.00 |
| 38 | Tack coat (407E10000) | GAL | 94 | $3.40 | $3.40 | $2.00 |
| 39 | Stabilized crushed aggregate (411E10000) | CY | 33 | $97.00 | $185.00 | $300.00 |
| 40 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 49 | $615.00 | $612.00 | $450.00 |
| 41 | Curb, type 4-C (609E24510) | FT | 87 | $52.00 | $100.00 | $47.00 |
| 42 | Fire hydrant adjusted to grade (638E10400) | EACH | 1 | $1,455.00 | $4,800.00 | $3,500.00 |
| 43 | Valve box adjusted to grade (638E10800) | EACH | 3 | $1,050.00 | $1,500.00 | $1,075.00 |
| 44 | Service box adjusted to grade (638E10900) | EACH | 1 | $600.00 | $1,320.00 | $520.00 |
| 45 | Barrier reflector, type 1, bidirectional (626E00102) | EACH | 12 | $12.25 | $13.00 | $12.00 |
| 46 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 8 | $14.00 | $13.00 | $14.00 |
| 47 | Ground mounted support, no. 3 post (630E03100) | FT | 42 | $11.00 | $11.00 | $11.00 |
| 48 | Sign post reflector (630E08600) | EACH | 3 | $64.00 | $63.35 | $65.00 |
| 49 | Sign, flat sheet (630E80100) | SF | 13 | $25.00 | $25.00 | $26.00 |
| 50 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $46.00 | $45.65 | $47.00 |
| 51 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $92.00 | $91.25 | $95.00 |
| 52 | Removal of ground mounted post support and disposal (630E86002) | EACH | 3 | $95.00 | $95.00 | $95.00 |
| 53 | Signing, misc.: overpass name installation (630E97700) | EACH | 1 | $885.00 | $885.00 | $930.00 |
| 54 | Edge line, 4", type 1 (642E00100) | MI | 0.28 | $5,215.00 | $5,215.00 | $5,450.00 |
| 55 | Center line, type 1 (642E00300) | MI | 0.14 | $5,160.00 | $5,160.00 | $5,410.00 |
| 56 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $110.00 | $85.00 | $110.00 |
| 57 | Detour signing (614E12420) | LS | 1 | $12,300 | $7,275.00 | $7,600.00 |
| 58 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $1,200.00 | $950.00 | $990.00 |
| 59 | Water (616E10000) | MGAL | 1 | $150.00 | $30.00 | $5.00 |
| 60 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $200,000 | $275,000 | $465,000 |
| 61 | Approach slab removed (202E22900) | SY | 150 | $40.00 | $58.00 | $60.00 |
| 62 | Wearing course removed (202E23500) | SY | 150 | $40.00 | $10.00 | $25.00 |
| 63 | Unclassified excavation, as per plan (503E21101) | CY | 138 | $165.00 | $400.00 | $220.00 |
| 64 | Epoxy coated steel reinforcement (509E10000) | LB | 140,558 | $1.60 | $1.66 | $1.40 |
| 65 | Uncoated steel reinforcement (509E25000) | LB | 2,736 | $1.75 | $1.89 | $0.90 |
| 66 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 13,956 | $1.70 | $1.37 | $1.50 |
| 67 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 514 | $28.00 | $23.00 | $28.00 |
| 68 | Class QC2 concrete with QC/QA, superstructure, as per plan (511E34413) | CY | 393 | $1,035.00 | $1,050.00 | $1,215.00 |
| 69 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 146 | $965.00 | $900.00 | $1,210.00 |
| 70 | Class QC1 concrete, pier above footings (511E41010) | CY | 16 | $3,615.00 | $6,350.00 | $2,435.00 |
| 71 | Class QC1 concrete, abutment not including footing (511E44110) | CY | 45 | $1,390.00 | $1,500.00 | $1,355.00 |
| 72 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,591 | $29.50 | $35.00 | $35.00 |
| 73 | Concrete repair by epoxy injection (512E10600) | FT | 11 | $150.00 | $150.00 | $200.00 |
| 74 | Type 2 waterproofing (512E33000) | SY | 29 | $48.00 | $33.00 | $45.00 |
| 75 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 420 | $24.00 | $35.00 | $43.00 |
| 76 | Structural steel members, level UF, as per plan (513E10201) | LB | 3,400 | $36.15 | $15.08 | $35.00 |
| 77 | Welded stud shear connectors (513E20000) | EACH | 8,800 | $8.00 | $4.75 | $4.75 |
| 78 | Structural expansion joint including elastomeric strip seal (516E11210) | FT | 66.92 | $1,300.00 | $555.00 | $620.00 |
| 79 | 1" preformed expansion joint filler (516E13600) | SF | 70 | $15.00 | $6.00 | $8.00 |
| 80 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 16 | $2,625.00 | $3,500.00 | $2,240.00 |
| 81 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 4 | $3,430.00 | $4,000.00 | $3,050.00 |
| 82 | Elastomeric bearing with internal laminates and load plate (516E44300) | EACH | 4 | $4,790.00 | $4,655.00 | $3,780.00 |
| 83 | Elastomeric bearing with internal laminates and load plate (516E44300) | EACH | 4 | $4,850.00 | $4,800.00 | $3,860.00 |
| 84 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $126,000 | $90,000 | $185,000 |
| 85 | Prefabricated geocomposite drain (518E20000) | SY | 55 | $23.20 | $12.00 | $40.00 |
| 86 | Porous backfill with geotextile fabric (518E21200) | CY | 16 | $141.00 | $130.00 | $154.00 |
| 87 | 6" perforated corrugated plastic pipe (518E40000) | FT | 90 | $21.00 | $20.00 | $14.00 |
| 88 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 65 | $26.00 | $26.00 | $14.00 |
| 89 | Special - composite fiber wrap system (519E00100) | SF | 786 | $64.00 | $64.00 | $70.00 |
| 90 | Patching concrete structure, as per plan (519E11101) | SF | 42 | $165.00 | $165.00 | $195.00 |
| 91 | Reinforced concrete approach slabs with QC/QA (T=1 (526E25011) | SY | 169 | $378.00 | $420.00 | $400.00 |
| 92 | Type A installation, as per plan (526E90011) | FT | 60 | $205.00 | $280.00 | $300.00 |
| 93 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $25,000 | $7,701.05 | $30,000 |
| 94 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $10,000 | $1,000.00 | $5,500.00 |
| 95 | Maintaining traffic (614E11000) | LS | 1 | $100,000 | $95,000 | $150,000 |
| 96 | Field office, type B, as per plan (619E16011) | MNTH | 6 | $2,075.00 | $2,769.00 | $2,500.00 |
| 97 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $40,500 | $55,000 | $28,000 |
| 98 | Mobilization (624E10000) | LS | 1 | $100,000 | $127,500 | $148,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.