ODOT contract 260345 bid tabulation
CUY-SR 17-13.50 Replace (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on August 13, 2026, CUY. 4 bids received; low bid $9,355,611 by Great Lakes Construction Co, -2.5% against the engineer's estimate of $9,600,000.
- Owner
- Ohio DOT
- Letting
- 13 AUG 2026
- Pay items
- 174
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Great Lakes Construction Co | $9,355,611 | Low | -3.0% |
| 2 | Ruhlin Company | $9,919,437 | +6.0% | +3.0% |
| 3 | J D Williamson Construction Co Inc | $9,977,044 | +7.0% | +4.0% |
| 4 | Beaver Excavating Company | $10,031,825 | +7.0% | +4.0% |
Engineer's estimate: $9,600,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Great Lakes Construction Co | 2. Ruhlin Company | 3. J D Williamson Construction Co Inc | 4. Beaver Excavating Company |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $29,750 | $25,000 | $53,000 | $65,000 |
| 2 | Pavement removed (202E23000) | SY | 2,125 | $20.00 | $30.00 | $28.00 | $22.50 |
| 3 | Walk removed (202E30000) | SF | 486 | $3.00 | $8.00 | $4.00 | $2.00 |
| 4 | Concrete median removed (202E30600) | SY | 263 | $15.00 | $36.00 | $15.00 | $22.00 |
| 5 | Curb removed (202E32000) | FT | 1,494 | $2.25 | $9.00 | $7.00 | $4.00 |
| 6 | Gutter removed (202E32700) | SY | 70 | $30.00 | $25.00 | $10.00 | $23.00 |
| 7 | Pipe removed, 24" and under (202E35100) | FT | 406 | $32.00 | $45.00 | $20.00 | $35.00 |
| 8 | Guardrail removed (202E38000) | FT | 2,105 | $2.40 | $2.40 | $2.50 | $2.40 |
| 9 | Anchor assembly removed, type A (202E42000) | EACH | 4 | $325.00 | $325.00 | $330.00 | $325.00 |
| 10 | Anchor assembly removed, type T (202E42040) | EACH | 2 | $95.00 | $95.00 | $95.00 | $95.00 |
| 11 | Anchor assembly removed, barrier design (202E42210) | EACH | 2 | $245.00 | $245.00 | $250.00 | $245.00 |
| 12 | Bridge terminal assembly removed (202E47000) | EACH | 3 | $95.00 | $95.00 | $95.00 | $95.00 |
| 13 | Manhole removed (202E58000) | EACH | 2 | $1,200.00 | $675.00 | $800.00 | $600.00 |
| 14 | Catch basin removed (202E58100) | EACH | 5 | $1,200.00 | $550.00 | $800.00 | $400.00 |
| 15 | Special - fill and plug existing conduit (202E70000) | FT | 85 | $17.00 | $30.00 | $27.00 | $45.00 |
| 16 | Removal misc.: monument assembly removed, CRGS mon (202E98100) | EACH | 1 | $180.00 | $220.00 | $500.00 | $210.00 |
| 17 | Removal misc.: abandoned steel gas main removed, 2 (202E98200) | FT | 400 | $25.00 | $25.00 | $30.00 | $23.00 |
| 18 | Removal misc.: abandoned steel gas main removed, 6 (202E98200) | FT | 55 | $25.00 | $38.00 | $30.00 | $50.00 |
| 19 | Excavation (203E10000) | CY | 1,409 | $25.00 | $37.00 | $35.00 | $36.00 |
| 20 | Embankment (203E20000) | CY | 375 | $30.00 | $32.00 | $23.00 | $18.00 |
| 21 | Granular material, type B, as per plan (203E35111) | CY | 3,625 | $52.00 | $75.00 | $86.00 | $92.00 |
| 22 | Subgrade compaction (204E10000) | SY | 3,496 | $2.00 | $9.00 | $7.00 | $4.50 |
| 23 | Guardrail, type MGS (606E15050) | FT | 462.50 | $22.80 | $22.80 | $23.00 | $22.80 |
| 24 | Guardrail, type MGS with long posts (606E15100) | FT | 100 | $27.60 | $27.60 | $28.00 | $27.60 |
| 25 | Rounded end section (606E20050) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 |
| 26 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 2 | $2,940.00 | $2,940.00 | $3,000.00 | $2,940.00 |
| 27 | Anchor assembly, MGS type T (606E26550) | EACH | 4 | $1,385.00 | $1,385.00 | $1,400.00 | $1,385.00 |
| 28 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,680.00 | $2,680.00 | $2,800.00 | $2,680.00 |
| 29 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 2 | $645.00 | $645.00 | $675.00 | $645.00 |
| 30 | Impact attenuator, type 3 (bidirectional), as per plan (606E60051) | EACH | 2 | $34,875 | $34,875 | $35,000 | $34,875 |
| 31 | 4" concrete walk (608E10000) | SF | 672 | $20.00 | $20.00 | $9.50 | $16.50 |
| 32 | Curb ramp (608E52000) | SF | 42 | $57.00 | $45.00 | $32.00 | $54.00 |
| 33 | Curb, type 2-B (609E16000) | FT | 336 | $50.00 | $55.00 | $30.00 | $33.00 |
| 34 | Curb, type 4-C (609E24510) | FT | 49 | $95.00 | $70.00 | $32.00 | $45.00 |
| 35 | Curb, type 6 (609E26000) | FT | 332 | $65.00 | $70.00 | $34.00 | $45.00 |
| 36 | Concrete median (609E71000) | SF | 122 | $40.00 | $51.00 | $18.00 | $40.00 |
| 37 | Concrete barrier, single slope, type C (622E10120) | FT | 124 | $375.00 | $450.00 | $190.00 | $260.00 |
| 38 | Concrete barrier end section, type B (622E24840) | EACH | 2 | $11,250 | $9,000.00 | $8,200.00 | $6,000.00 |
| 39 | Concrete barrier, end anchorage, reinforced, type C (622E25008) | EACH | 4 | $6,500.00 | $3,300.00 | $8,500.00 | $6,500.00 |
| 40 | Monument assembly adjusted to grade (623E39500) | EACH | 1 | $619.46 | $601.00 | $400.00 | $500.00 |
| 41 | Special - mailbox removed and reset (690E50350) | EACH | 5 | $245.00 | $245.00 | $250.00 | $300.00 |
| 42 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 111 | $95.00 | $70.00 | $70.00 | $110.00 |
| 43 | Rock channel protection, type B with filter (601E32100) | CY | 52 | $128.00 | $175.00 | $165.00 | $170.00 |
| 44 | Rock channel protection, type C with filter (601E32200) | CY | 2 | $440.00 | $800.00 | $200.00 | $280.00 |
| 45 | Soil analysis test (659E00100) | EACH | 2 | $500.00 | $500.00 | $100.00 | $500.00 |
| 46 | Topsoil (659E00300) | CY | 488 | $45.00 | $46.00 | $70.00 | $46.00 |
| 47 | Seeding and mulching (659E10000) | SY | 4,389 | $1.00 | $1.00 | $2.10 | $1.00 |
| 48 | Repair seeding and mulching (659E14000) | SY | 219 | $2.00 | $2.00 | $2.10 | $2.00 |
| 49 | Inter-seeding (659E15000) | SY | 219 | $1.00 | $1.00 | $0.40 | $1.00 |
| 50 | Commercial fertilizer (659E20000) | TON | 0.61 | $1,500.00 | $1,500.00 | $850.00 | $1,500.00 |
| 51 | Lime (659E31000) | ACRE | 0.91 | $1.00 | $100.00 | $0.08 | $0.01 |
| 52 | Water (659E35000) | MGAL | 36 | $60.00 | $60.00 | $0.08 | $60.00 |
| 53 | Ditch erosion protection mat, type B (670E00720) | SY | 214 | $3.00 | $3.00 | $1.95 | $3.00 |
| 54 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,500.00 | $3,300.00 | $10,000 | $3,500.00 |
| 55 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $15,000 | $18,000 | $25,000 | $7,500.00 |
| 56 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $18,500 | $18,000 | $16,000 | $13,000 |
| 57 | Erosion control (832E30000) | EACH | 29,824 | $1.00 | $1.00 | $1.00 | $1.00 |
| 58 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 80 | $7.00 | $7.00 | $2.25 | $7.00 |
| 59 | Concrete masonry (602E20000) | CY | 0.42 | $5,250.00 | $3,973.48 | $2,800.00 | $3,250.00 |
| 60 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 657 | $28.00 | $42.00 | $17.00 | $30.00 |
| 61 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 637 | $23.00 | $40.00 | $17.00 | $25.00 |
| 62 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 137 | $45.00 | $42.00 | $25.00 | $35.00 |
| 63 | 12" conduit, type B (611E04400) | FT | 80 | $185.00 | $180.00 | $120.00 | $85.00 |
| 64 | 12" conduit, type C (611E04600) | FT | 118 | $140.00 | $118.00 | $88.00 | $85.00 |
| 65 | 12" conduit, type C, as per plan (611E04601) | FT | 128 | $150.00 | $131.00 | $102.00 | $110.00 |
| 66 | 12" conduit, type F (611E05200) | FT | 158 | $125.00 | $125.00 | $110.00 | $70.00 |
| 67 | 24" conduit, type C (611E10600) | FT | 10 | $275.00 | $480.00 | $170.00 | $225.00 |
| 68 | Catch basin, no. 3 (611E98150) | EACH | 2 | $7,750.00 | $6,900.00 | $4,600.00 | $4,700.00 |
| 69 | Catch basin, no. 3A (611E98180) | EACH | 2 | $5,700.00 | $5,400.00 | $3,100.00 | $3,200.00 |
| 70 | Catch basin, no. 6 (611E98370) | EACH | 1 | $5,250.00 | $5,400.00 | $4,000.00 | $3,200.00 |
| 71 | Catch basin, no. 8 (611E98410) | EACH | 1 | $7,400.00 | $8,421.00 | $4,600.00 | $7,000.00 |
| 72 | Catch basin, no. 2-5, as per plan (611E98571) | EACH | 1 | $4,900.00 | $4,260.00 | $2,500.00 | $3,600.00 |
| 73 | Manhole, no. 3 (611E99574) | EACH | 6 | $8,000.00 | $5,500.00 | $5,000.00 | $3,700.00 |
| 74 | Precast reinforced concrete outlet (611E99710) | EACH | 5 | $400.00 | $450.00 | $375.00 | $420.00 |
| 75 | Pavement planing, asphalt concrete, as per plan, 3 (254E01001) | SY | 684 | $27.00 | $27.00 | $32.00 | $31.65 |
| 76 | Full depth pavement sawing (255E20000) | FT | 1,252 | $3.50 | $2.50 | $2.55 | $3.00 |
| 77 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 193 | $350.00 | $350.00 | $300.00 | $295.00 |
| 78 | Aggregate base (304E20000) | CY | 547 | $82.00 | $130.00 | $105.00 | $90.00 |
| 79 | 9" concrete base, class QC 1P, as per plan (305E13011) | SY | 1,970 | $130.00 | $125.00 | $132.00 | $135.00 |
| 80 | Tack coat, 702.13 (407E13900) | GAL | 189 | $15.00 | $15.00 | $13.00 | $12.50 |
| 81 | Non-tracking tack coat (407E20000) | GAL | 309 | $5.00 | $5.00 | $3.00 | $3.00 |
| 82 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 164 | $540.00 | $540.00 | $400.00 | $390.00 |
| 83 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 126 | $455.00 | $455.00 | $375.00 | $365.00 |
| 84 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 180 | $178.00 | $85.00 | $85.00 | $100.00 |
| 85 | 1" copper service branch (638E04900) | FT | 84 | $112.00 | $185.00 | $75.00 | $170.00 |
| 86 | Valve box adjusted to grade (638E10800) | EACH | 10 | $413.58 | $700.00 | $210.00 | $230.00 |
| 87 | Special - 1" curb valve and box, city of cleveland (638E20912) | EACH | 2 | $901.71 | $3,000.00 | $1,250.00 | $2,800.00 |
| 88 | Manhole adjusted to grade (611E99654) | EACH | 2 | $971.75 | $2,181.00 | $750.00 | $960.00 |
| 89 | RPM (621E00100) | EACH | 19 | $255.00 | $285.40 | $290.00 | $285.00 |
| 90 | Barrier reflector, type 1, bidirectional (626E00102) | EACH | 14 | $12.50 | $12.50 | $13.00 | $12.48 |
| 91 | Barrier reflector, type 1, oneway (626E00102) | EACH | 3 | $14.00 | $14.00 | $13.00 | $12.48 |
| 92 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 19 | $14.00 | $14.00 | $13.00 | $12.48 |
| 93 | Ground mounted support, no. 2 post (630E02100) | FT | 114 | $14.00 | $13.85 | $14.00 | $13.85 |
| 94 | Ground mounted support, no. 3 post (630E03100) | FT | 15 | $15.00 | $15.01 | $15.00 | $15.01 |
| 95 | One way support, no. 3 post (630E08004) | FT | 29 | $16.00 | $15.01 | $15.00 | $15.01 |
| 96 | Sign post reflector (630E08600) | EACH | 16 | $65.00 | $54.48 | $55.00 | $54.48 |
| 97 | Sign, flat sheet (630E80100) | SF | 146 | $17.00 | $17.21 | $18.00 | $17.21 |
| 98 | Sign, flat sheet (630E80100) | SF | 1 | $15.00 | $19.35 | $20.00 | $19.35 |
| 99 | Concrete median barrier sign bracket (630E81020) | EACH | 2 | $275.00 | $869.57 | $900.00 | $869.57 |
| 100 | Removal of ground mounted sign and disposal (630E84900) | EACH | 9 | $30.00 | $18.08 | $18.50 | $18.08 |
| 101 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $95.00 | $56.51 | $58.00 | $56.51 |
| 102 | Removal of ground mounted post support and disposal (630E86002) | EACH | 8 | $40.00 | $24.10 | $25.00 | $24.10 |
| 103 | Edge line, 4" (646E10000) | MI | 0.53 | $4,700.00 | $4,900.00 | $5,000.00 | $4,900.00 |
| 104 | Edge line, 6" (646E10010) | MI | 0.12 | $4,900.00 | $7,335.00 | $7,500.00 | $7,335.00 |
| 105 | Lane line, 4" (646E10100) | MI | 0.68 | $3,200.00 | $2,040.00 | $2,100.00 | $2,040.00 |
| 106 | Center line (646E10200) | MI | 0.14 | $8,500.00 | $9,800.00 | $10,000 | $9,800.00 |
| 107 | Channelizing line, 8" (646E10300) | FT | 287 | $2.15 | $2.45 | $2.50 | $2.45 |
| 108 | Stop line (646E10400) | FT | 26 | $15.00 | $23.50 | $24.00 | $23.50 |
| 109 | Transverse/diagonal line (646E10600) | FT | 59 | $12.00 | $22.30 | $23.00 | $22.30 |
| 110 | Chevron marking (646E10620) | FT | 29 | $12.00 | $22.30 | $23.00 | $22.30 |
| 111 | Lane arrow (646E20300) | EACH | 8 | $185.00 | $330.00 | $340.00 | $330.00 |
| 112 | Wrong way arrow (646E20320) | EACH | 2 | $385.00 | $475.00 | $480.00 | $475.00 |
| 113 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 60 | $101.82 | $90.00 | $110.00 | $115.00 |
| 114 | Increased barrier delineation (614E11630) | FT | 404 | $3.25 | $1.88 | $1.90 | $0.50 |
| 115 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 5 | $1,950.00 | $1,879.61 | $2,800.00 | $2,720.00 |
| 116 | Detour signing (614E12420) | LS | 1 | $36,850 | $29,640 | $53,000 | $45,000 |
| 117 | Barrier reflector, type 1 (one way) (614E13310) | EACH | 35 | $8.00 | $11.52 | $12.00 | $8.50 |
| 118 | Object marker, one way (614E13350) | EACH | 31 | $18.00 | $19.98 | $20.00 | $18.25 |
| 119 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,200.00 | $1,079.21 | $1,150.00 | $900.00 |
| 120 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 1.11 | $8,350.00 | $9,621.02 | $10,000 | $9,250.00 |
| 121 | Work zone channelizing line, class I, 8", 740.06, type I (614E23400) | FT | 220 | $3.20 | $2.89 | $2.90 | $4.75 |
| 122 | Work zone dotted line, class I, 4", 740.06, type I (614E24400) | FT | 560 | $3.00 | $1.08 | $1.10 | $1.50 |
| 123 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 36 | $210.00 | $150.00 | $100.00 | $115.00 |
| 124 | Water (616E10000) | MGAL | 22 | $55.00 | $58.00 | $5.00 | $50.00 |
| 125 | Portable barrier, unanchored (622E41100) | FT | 2,000 | $17.00 | $15.00 | $50.00 | $20.00 |
| 126 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $167,000 | $645,000 | $430,000 | $350,000 |
| 127 | Approach slab removed (202E22900) | SY | 100 | $50.00 | $70.00 | $80.00 | $60.00 |
| 128 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $160,000 | $50,000 | $90,000 | $150,000 |
| 129 | Unclassified excavation (503E21100) | CY | 300 | $125.00 | $170.00 | $185.00 | $370.00 |
| 130 | Pile driving equipment mobilization (505E11100) | LS | 1 | $25,000 | $25,000 | $35,000 | $80,000 |
| 131 | 16" cast-in-place reinforced concrete piles, driven (507E00700) | FT | 1,900 | $38.00 | $16.00 | $40.00 | $30.00 |
| 132 | 16" cast-in-place reinforced concrete piles, furnished (507E00750) | FT | 2,000 | $70.00 | $98.00 | $75.00 | $77.00 |
| 133 | Epoxy coated steel reinforcement (509E10000) | LB | 181,699 | $1.65 | $1.79 | $1.49 | $1.60 |
| 134 | Galvanized steel reinforcement (509E26000) | LB | 10,256 | $1.50 | $2.15 | $1.50 | $2.37 |
| 135 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 2,408 | $32.00 | $30.00 | $24.00 | $55.00 |
| 136 | Semi-integral diaphragm guide (511E33500) | EACH | 4 | $5,000.00 | $5,000.00 | $2,500.00 | $4,500.00 |
| 137 | Class QC2 concrete with QC/QA, bridge deck, as per plan (511E34447) | CY | 415 | $1,050.00 | $1,000.00 | $1,050.00 | $1,100.00 |
| 138 | Class QC1 concrete with QC/QA, pier above footings (511E41012) | CY | 63 | $1,700.00 | $1,400.00 | $1,400.00 | $1,500.00 |
| 139 | Class QC1 concrete with QC/QA, abutment not including footing (511E44112) | CY | 131 | $1,100.00 | $825.00 | $800.00 | $950.00 |
| 140 | Class QC1 concrete with QC/QA, retaining/wingwall not including footing (511E46012) | CY | 192 | $2,200.00 | $2,300.00 | $2,200.00 | $2,300.00 |
| 141 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 202 | $1,000.00 | $650.00 | $600.00 | $700.00 |
| 142 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 226 | $14.00 | $14.00 | $13.00 | $14.00 |
| 143 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,681 | $30.00 | $30.00 | $33.00 | $30.00 |
| 144 | Type 2 waterproofing (512E33000) | SY | 60 | $35.00 | $45.00 | $20.00 | $50.00 |
| 145 | Structural steel members, level 4 (513E10280) | LB | 480,000 | $2.90 | $2.56 | $2.93 | $2.91 |
| 146 | Welded stud shear connectors (513E20000) | EACH | 5,220 | $4.15 | $4.15 | $4.30 | $4.15 |
| 147 | Armorless preformed joint seal, as per plan (516E10011) | FT | 155 | $72.00 | $45.00 | $67.00 | $50.00 |
| 148 | Sidewalk cover plate (516E12310) | LB | 450 | $30.00 | $50.00 | $51.00 | $35.00 |
| 149 | 1" preformed expansion joint filler (516E13600) | SF | 120 | $16.50 | $12.00 | $8.00 | $6.50 |
| 150 | 2" preformed expansion joint filler (516E13900) | SF | 100 | $18.00 | $14.00 | $10.00 | $9.00 |
| 151 | Semi-integral abutment expansion joint seal (516E14020) | FT | 212 | $40.00 | $35.00 | $48.00 | $38.00 |
| 152 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44301) | EACH | 12 | $2,700.00 | $3,300.00 | $3,000.00 | $2,400.00 |
| 153 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44301) | EACH | 6 | $2,400.00 | $3,000.00 | $2,800.00 | $2,200.00 |
| 154 | Railing (concrete parapet with twin steel tube railing and vandal protection fence) (517E75122) | FT | 521 | $365.00 | $325.00 | $310.00 | $350.00 |
| 155 | Prefabricated geocomposite drain (518E20000) | SY | 580 | $42.00 | $38.00 | $40.00 | $30.00 |
| 156 | Porous backfill with geotextile fabric (518E21200) | CY | 314 | $130.00 | $140.00 | $200.00 | $120.00 |
| 157 | 6" perforated corrugated plastic pipe (518E40000) | FT | 860 | $12.00 | $12.00 | $22.00 | $16.00 |
| 158 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 70 | $55.00 | $25.00 | $25.00 | $24.00 |
| 159 | Dynamic load testing, as per plan (523E20001) | EACH | 1 | $5,000.00 | $5,000.00 | $6,500.00 | $6,000.00 |
| 160 | Restrike, as per plan (523E20501) | EACH | 1 | $5,000.00 | $5,000.00 | $5,500.00 | $7,500.00 |
| 161 | Drilled shafts, 48" diameter above bedrock, as per plan (524E94903) | FT | 4,249 | $585.00 | $600.00 | $618.00 | $630.00 |
| 162 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30010) | SY | 283 | $475.00 | $475.00 | $425.00 | $450.00 |
| 163 | Type C installation, as per plan (526E90031) | FT | 150 | $335.00 | $250.00 | $162.00 | $280.00 |
| 164 | Special - structures: preconstruction condition SU (530E00200) | LS | 1 | $15,000 | $4,500.00 | $3,500.00 | $4,500.00 |
| 165 | Vandal protection fence, 6' straight, coated fabric, as per plan (607E39901) | FT | 330 | $124.00 | $124.00 | $145.00 | $124.00 |
| 166 | Structure grounding system (625E33000) | EACH | 1 | $10,500 | $3,500.00 | $12,000 | $20,000 |
| 167 | Thermal integrity profiling (tip) test (894E10000) | EACH | 10 | $3,500.00 | $3,000.00 | $2,600.00 | $4,000.00 |
| 168 | Department'S share of the dispute resolution advisor (100E51200) | EACH | 35,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 169 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $90,000 | $73,000 | $100,000 | $53,500 |
| 170 | CPM progress schedule (108E10000) | LS | 1 | $100.00 | $5,000.00 | $10,000 | $10,000 |
| 171 | Maintaining traffic (614E11000) | LS | 1 | $35,000 | $112,000 | $260,000 | $60,000 |
| 172 | Field office, type C, as per plan (619E16021) | MNTH | 13 | $4,200.00 | $11,225 | $7,500.00 | $10,500 |
| 173 | Construction layout stakes and surveying (623E10000) | LS | 1 | $60,000 | $115,000 | $55,000 | $85,000 |
| 174 | Mobilization (624E10000) | LS | 1 | $461,000 | $496,000 | $500,000 | $500,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of August 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.