ODOT contract 260345 bid tabulation

CUY-SR 17-13.50 Replace (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on August 13, 2026, CUY. 4 bids received; low bid $9,355,611 by Great Lakes Construction Co, -2.5% against the engineer's estimate of $9,600,000.

Owner
Ohio DOT
Letting
13 AUG 2026
Pay items
174
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Great Lakes Construction Co$9,355,611Low-3.0%
2Ruhlin Company$9,919,437+6.0%+3.0%
3J D Williamson Construction Co Inc$9,977,044+7.0%+4.0%
4Beaver Excavating Company$10,031,825+7.0%+4.0%
ODOT contract 260345: bids by rank

Engineer's estimate: $9,600,000.

Bid tabulation

LinePay itemUnitQuantity1. Great Lakes Construction Co2. Ruhlin Company3. J D Williamson Construction Co Inc4. Beaver Excavating Company
1Clearing and grubbing (201E11000)LS1$29,750$25,000$53,000$65,000
2Pavement removed (202E23000)SY2,125$20.00$30.00$28.00$22.50
3Walk removed (202E30000)SF486$3.00$8.00$4.00$2.00
4Concrete median removed (202E30600)SY263$15.00$36.00$15.00$22.00
5Curb removed (202E32000)FT1,494$2.25$9.00$7.00$4.00
6Gutter removed (202E32700)SY70$30.00$25.00$10.00$23.00
7Pipe removed, 24" and under (202E35100)FT406$32.00$45.00$20.00$35.00
8Guardrail removed (202E38000)FT2,105$2.40$2.40$2.50$2.40
9Anchor assembly removed, type A (202E42000)EACH4$325.00$325.00$330.00$325.00
10Anchor assembly removed, type T (202E42040)EACH2$95.00$95.00$95.00$95.00
11Anchor assembly removed, barrier design (202E42210)EACH2$245.00$245.00$250.00$245.00
12Bridge terminal assembly removed (202E47000)EACH3$95.00$95.00$95.00$95.00
13Manhole removed (202E58000)EACH2$1,200.00$675.00$800.00$600.00
14Catch basin removed (202E58100)EACH5$1,200.00$550.00$800.00$400.00
15Special - fill and plug existing conduit (202E70000)FT85$17.00$30.00$27.00$45.00
16Removal misc.: monument assembly removed, CRGS mon (202E98100)EACH1$180.00$220.00$500.00$210.00
17Removal misc.: abandoned steel gas main removed, 2 (202E98200)FT400$25.00$25.00$30.00$23.00
18Removal misc.: abandoned steel gas main removed, 6 (202E98200)FT55$25.00$38.00$30.00$50.00
19Excavation (203E10000)CY1,409$25.00$37.00$35.00$36.00
20Embankment (203E20000)CY375$30.00$32.00$23.00$18.00
21Granular material, type B, as per plan (203E35111)CY3,625$52.00$75.00$86.00$92.00
22Subgrade compaction (204E10000)SY3,496$2.00$9.00$7.00$4.50
23Guardrail, type MGS (606E15050)FT462.50$22.80$22.80$23.00$22.80
24Guardrail, type MGS with long posts (606E15100)FT100$27.60$27.60$28.00$27.60
25Rounded end section (606E20050)EACH1$100.00$100.00$100.00$100.00
26Anchor assembly, MGS type E (MASH 2016) (606E26150)EACH2$2,940.00$2,940.00$3,000.00$2,940.00
27Anchor assembly, MGS type T (606E26550)EACH4$1,385.00$1,385.00$1,400.00$1,385.00
28MGS bridge terminal assembly, type 1 (606E35002)EACH2$2,680.00$2,680.00$2,800.00$2,680.00
29MGS bridge terminal assembly, type 2 (606E35102)EACH2$645.00$645.00$675.00$645.00
30Impact attenuator, type 3 (bidirectional), as per plan (606E60051)EACH2$34,875$34,875$35,000$34,875
314" concrete walk (608E10000)SF672$20.00$20.00$9.50$16.50
32Curb ramp (608E52000)SF42$57.00$45.00$32.00$54.00
33Curb, type 2-B (609E16000)FT336$50.00$55.00$30.00$33.00
34Curb, type 4-C (609E24510)FT49$95.00$70.00$32.00$45.00
35Curb, type 6 (609E26000)FT332$65.00$70.00$34.00$45.00
36Concrete median (609E71000)SF122$40.00$51.00$18.00$40.00
37Concrete barrier, single slope, type C (622E10120)FT124$375.00$450.00$190.00$260.00
38Concrete barrier end section, type B (622E24840)EACH2$11,250$9,000.00$8,200.00$6,000.00
39Concrete barrier, end anchorage, reinforced, type C (622E25008)EACH4$6,500.00$3,300.00$8,500.00$6,500.00
40Monument assembly adjusted to grade (623E39500)EACH1$619.46$601.00$400.00$500.00
41Special - mailbox removed and reset (690E50350)EACH5$245.00$245.00$250.00$300.00
42Tied concrete block mat with type 2 underlayment (601E21060)SY111$95.00$70.00$70.00$110.00
43Rock channel protection, type B with filter (601E32100)CY52$128.00$175.00$165.00$170.00
44Rock channel protection, type C with filter (601E32200)CY2$440.00$800.00$200.00$280.00
45Soil analysis test (659E00100)EACH2$500.00$500.00$100.00$500.00
46Topsoil (659E00300)CY488$45.00$46.00$70.00$46.00
47Seeding and mulching (659E10000)SY4,389$1.00$1.00$2.10$1.00
48Repair seeding and mulching (659E14000)SY219$2.00$2.00$2.10$2.00
49Inter-seeding (659E15000)SY219$1.00$1.00$0.40$1.00
50Commercial fertilizer (659E20000)TON0.61$1,500.00$1,500.00$850.00$1,500.00
51Lime (659E31000)ACRE0.91$1.00$100.00$0.08$0.01
52Water (659E35000)MGAL36$60.00$60.00$0.08$60.00
53Ditch erosion protection mat, type B (670E00720)SY214$3.00$3.00$1.95$3.00
54Storm water pollution prevention plan (832E15000)LS1$3,500.00$3,300.00$10,000$3,500.00
55Storm water pollution prevention inspections (832E15002)LS1$15,000$18,000$25,000$7,500.00
56Storm water pollution prevention inspection software (832E15010)LS1$18,500$18,000$16,000$13,000
57Erosion control (832E30000)EACH29,824$1.00$1.00$1.00$1.00
58Seeding and erosion control with turf reinforcing mat, type 1 (836E10000)SY80$7.00$7.00$2.25$7.00
59Concrete masonry (602E20000)CY0.42$5,250.00$3,973.48$2,800.00$3,250.00
606" shallow pipe underdrains with geotextile fabric (605E11110)FT657$28.00$42.00$17.00$30.00
616" base pipe underdrains with geotextile fabric (605E14020)FT637$23.00$40.00$17.00$25.00
626" conduit, type F for underdrain outlets (611E00510)FT137$45.00$42.00$25.00$35.00
6312" conduit, type B (611E04400)FT80$185.00$180.00$120.00$85.00
6412" conduit, type C (611E04600)FT118$140.00$118.00$88.00$85.00
6512" conduit, type C, as per plan (611E04601)FT128$150.00$131.00$102.00$110.00
6612" conduit, type F (611E05200)FT158$125.00$125.00$110.00$70.00
6724" conduit, type C (611E10600)FT10$275.00$480.00$170.00$225.00
68Catch basin, no. 3 (611E98150)EACH2$7,750.00$6,900.00$4,600.00$4,700.00
69Catch basin, no. 3A (611E98180)EACH2$5,700.00$5,400.00$3,100.00$3,200.00
70Catch basin, no. 6 (611E98370)EACH1$5,250.00$5,400.00$4,000.00$3,200.00
71Catch basin, no. 8 (611E98410)EACH1$7,400.00$8,421.00$4,600.00$7,000.00
72Catch basin, no. 2-5, as per plan (611E98571)EACH1$4,900.00$4,260.00$2,500.00$3,600.00
73Manhole, no. 3 (611E99574)EACH6$8,000.00$5,500.00$5,000.00$3,700.00
74Precast reinforced concrete outlet (611E99710)EACH5$400.00$450.00$375.00$420.00
75Pavement planing, asphalt concrete, as per plan, 3 (254E01001)SY684$27.00$27.00$32.00$31.65
76Full depth pavement sawing (255E20000)FT1,252$3.50$2.50$2.55$3.00
77Asphalt concrete base, PG64-22, (449) (301E56000)CY193$350.00$350.00$300.00$295.00
78Aggregate base (304E20000)CY547$82.00$130.00$105.00$90.00
799" concrete base, class QC 1P, as per plan (305E13011)SY1,970$130.00$125.00$132.00$135.00
80Tack coat, 702.13 (407E13900)GAL189$15.00$15.00$13.00$12.50
81Non-tracking tack coat (407E20000)GAL309$5.00$5.00$3.00$3.00
82Asphalt concrete surface course, type 1, (449), as per plan (441E70101)CY164$540.00$540.00$400.00$390.00
83Asphalt concrete intermediate course, type 2, (449) (441E70300)CY126$455.00$455.00$375.00$365.00
846" non-reinforced concrete pavement, class QC 1P (452E10010)SY180$178.00$85.00$85.00$100.00
851" copper service branch (638E04900)FT84$112.00$185.00$75.00$170.00
86Valve box adjusted to grade (638E10800)EACH10$413.58$700.00$210.00$230.00
87Special - 1" curb valve and box, city of cleveland (638E20912)EACH2$901.71$3,000.00$1,250.00$2,800.00
88Manhole adjusted to grade (611E99654)EACH2$971.75$2,181.00$750.00$960.00
89RPM (621E00100)EACH19$255.00$285.40$290.00$285.00
90Barrier reflector, type 1, bidirectional (626E00102)EACH14$12.50$12.50$13.00$12.48
91Barrier reflector, type 1, oneway (626E00102)EACH3$14.00$14.00$13.00$12.48
92Barrier reflector, type 2, bidirectional (626E00110)EACH19$14.00$14.00$13.00$12.48
93Ground mounted support, no. 2 post (630E02100)FT114$14.00$13.85$14.00$13.85
94Ground mounted support, no. 3 post (630E03100)FT15$15.00$15.01$15.00$15.01
95One way support, no. 3 post (630E08004)FT29$16.00$15.01$15.00$15.01
96Sign post reflector (630E08600)EACH16$65.00$54.48$55.00$54.48
97Sign, flat sheet (630E80100)SF146$17.00$17.21$18.00$17.21
98Sign, flat sheet (630E80100)SF1$15.00$19.35$20.00$19.35
99Concrete median barrier sign bracket (630E81020)EACH2$275.00$869.57$900.00$869.57
100Removal of ground mounted sign and disposal (630E84900)EACH9$30.00$18.08$18.50$18.08
101Removal of ground mounted sign and reerection (630E85100)EACH1$95.00$56.51$58.00$56.51
102Removal of ground mounted post support and disposal (630E86002)EACH8$40.00$24.10$25.00$24.10
103Edge line, 4" (646E10000)MI0.53$4,700.00$4,900.00$5,000.00$4,900.00
104Edge line, 6" (646E10010)MI0.12$4,900.00$7,335.00$7,500.00$7,335.00
105Lane line, 4" (646E10100)MI0.68$3,200.00$2,040.00$2,100.00$2,040.00
106Center line (646E10200)MI0.14$8,500.00$9,800.00$10,000$9,800.00
107Channelizing line, 8" (646E10300)FT287$2.15$2.45$2.50$2.45
108Stop line (646E10400)FT26$15.00$23.50$24.00$23.50
109Transverse/diagonal line (646E10600)FT59$12.00$22.30$23.00$22.30
110Chevron marking (646E10620)FT29$12.00$22.30$23.00$22.30
111Lane arrow (646E20300)EACH8$185.00$330.00$340.00$330.00
112Wrong way arrow (646E20320)EACH2$385.00$475.00$480.00$475.00
113Law enforcement officer with patrol car for assistance (614E11110)HR60$101.82$90.00$110.00$115.00
114Increased barrier delineation (614E11630)FT404$3.25$1.88$1.90$0.50
115Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH5$1,950.00$1,879.61$2,800.00$2,720.00
116Detour signing (614E12420)LS1$36,850$29,640$53,000$45,000
117Barrier reflector, type 1 (one way) (614E13310)EACH35$8.00$11.52$12.00$8.50
118Object marker, one way (614E13350)EACH31$18.00$19.98$20.00$18.25
119Portable changeable message sign, as per plan (614E18601)SNMT6$1,200.00$1,079.21$1,150.00$900.00
120Work zone edge line, class I, 4", 740.06, type I (614E22200)MI1.11$8,350.00$9,621.02$10,000$9,250.00
121Work zone channelizing line, class I, 8", 740.06, type I (614E23400)FT220$3.20$2.89$2.90$4.75
122Work zone dotted line, class I, 4", 740.06, type I (614E24400)FT560$3.00$1.08$1.10$1.50
123Pavement for maintaining traffic, class B, as per plan (615E25001)SY36$210.00$150.00$100.00$115.00
124Water (616E10000)MGAL22$55.00$58.00$5.00$50.00
125Portable barrier, unanchored (622E41100)FT2,000$17.00$15.00$50.00$20.00
126Portions of structure removed, over 20 foot span, as per plan (202E11203)LS1$167,000$645,000$430,000$350,000
127Approach slab removed (202E22900)SY100$50.00$70.00$80.00$60.00
128Cofferdams and excavation bracing (503E11100)LS1$160,000$50,000$90,000$150,000
129Unclassified excavation (503E21100)CY300$125.00$170.00$185.00$370.00
130Pile driving equipment mobilization (505E11100)LS1$25,000$25,000$35,000$80,000
13116" cast-in-place reinforced concrete piles, driven (507E00700)FT1,900$38.00$16.00$40.00$30.00
13216" cast-in-place reinforced concrete piles, furnished (507E00750)FT2,000$70.00$98.00$75.00$77.00
133Epoxy coated steel reinforcement (509E10000)LB181,699$1.65$1.79$1.49$1.60
134Galvanized steel reinforcement (509E26000)LB10,256$1.50$2.15$1.50$2.37
135Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001)EACH2,408$32.00$30.00$24.00$55.00
136Semi-integral diaphragm guide (511E33500)EACH4$5,000.00$5,000.00$2,500.00$4,500.00
137Class QC2 concrete with QC/QA, bridge deck, as per plan (511E34447)CY415$1,050.00$1,000.00$1,050.00$1,100.00
138Class QC1 concrete with QC/QA, pier above footings (511E41012)CY63$1,700.00$1,400.00$1,400.00$1,500.00
139Class QC1 concrete with QC/QA, abutment not including footing (511E44112)CY131$1,100.00$825.00$800.00$950.00
140Class QC1 concrete with QC/QA, retaining/wingwall not including footing (511E46012)CY192$2,200.00$2,300.00$2,200.00$2,300.00
141Class QC1 concrete with QC/QA, footing (511E46512)CY202$1,000.00$650.00$600.00$700.00
142Sealing of concrete surfaces (non-epoxy) (512E10050)SY226$14.00$14.00$13.00$14.00
143Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY1,681$30.00$30.00$33.00$30.00
144Type 2 waterproofing (512E33000)SY60$35.00$45.00$20.00$50.00
145Structural steel members, level 4 (513E10280)LB480,000$2.90$2.56$2.93$2.91
146Welded stud shear connectors (513E20000)EACH5,220$4.15$4.15$4.30$4.15
147Armorless preformed joint seal, as per plan (516E10011)FT155$72.00$45.00$67.00$50.00
148Sidewalk cover plate (516E12310)LB450$30.00$50.00$51.00$35.00
1491" preformed expansion joint filler (516E13600)SF120$16.50$12.00$8.00$6.50
1502" preformed expansion joint filler (516E13900)SF100$18.00$14.00$10.00$9.00
151Semi-integral abutment expansion joint seal (516E14020)FT212$40.00$35.00$48.00$38.00
152Elastomeric bearing with internal laminates and load plate, as per plan (516E44301)EACH12$2,700.00$3,300.00$3,000.00$2,400.00
153Elastomeric bearing with internal laminates and load plate, as per plan (516E44301)EACH6$2,400.00$3,000.00$2,800.00$2,200.00
154Railing (concrete parapet with twin steel tube railing and vandal protection fence) (517E75122)FT521$365.00$325.00$310.00$350.00
155Prefabricated geocomposite drain (518E20000)SY580$42.00$38.00$40.00$30.00
156Porous backfill with geotextile fabric (518E21200)CY314$130.00$140.00$200.00$120.00
1576" perforated corrugated plastic pipe (518E40000)FT860$12.00$12.00$22.00$16.00
1586" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011)FT70$55.00$25.00$25.00$24.00
159Dynamic load testing, as per plan (523E20001)EACH1$5,000.00$5,000.00$6,500.00$6,000.00
160Restrike, as per plan (523E20501)EACH1$5,000.00$5,000.00$5,500.00$7,500.00
161Drilled shafts, 48" diameter above bedrock, as per plan (524E94903)FT4,249$585.00$600.00$618.00$630.00
162Reinforced concrete approach slabs with QC/QA (T=1 (526E30010)SY283$475.00$475.00$425.00$450.00
163Type C installation, as per plan (526E90031)FT150$335.00$250.00$162.00$280.00
164Special - structures: preconstruction condition SU (530E00200)LS1$15,000$4,500.00$3,500.00$4,500.00
165Vandal protection fence, 6' straight, coated fabric, as per plan (607E39901)FT330$124.00$124.00$145.00$124.00
166Structure grounding system (625E33000)EACH1$10,500$3,500.00$12,000$20,000
167Thermal integrity profiling (tip) test (894E10000)EACH10$3,500.00$3,000.00$2,600.00$4,000.00
168Department'S share of the dispute resolution advisor (100E51200)EACH35,000$1.00$1.00$1.00$1.00
169Premium for contract performance bond and for payment bond (103E05000)LS1$90,000$73,000$100,000$53,500
170CPM progress schedule (108E10000)LS1$100.00$5,000.00$10,000$10,000
171Maintaining traffic (614E11000)LS1$35,000$112,000$260,000$60,000
172Field office, type C, as per plan (619E16021)MNTH13$4,200.00$11,225$7,500.00$10,500
173Construction layout stakes and surveying (623E10000)LS1$60,000$115,000$55,000$85,000
174Mobilization (624E10000)LS1$461,000$496,000$500,000$500,000
ODOT contract 260345: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of August 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy